Laserfiche WebLink
pURCts <br />STATE OF CALIFORNIA <br />STATE WATER RESOURCES CONTROL BOARD ; <br />UNDERGROUND STORAGE TANK PERMIT APPLICATION - FORM B " 00 <br />`� _ .: o <br />• C+t IIOP H.r <br />COMPLETE A SEPARATE FORM FOR EACH TANK SYSTEM. <br />MARK ONLY ❑ 1 NEW PERMIT ❑ <br />3 RENEWAL PERMIT <br />If? 5 CHANGE OF INFORMATION <br />❑ 7 PERMANENTLY CL D SITI <br />ONE ITEM ❑ 2 INTERIM PERMIT ❑ <br />4 AMENDED PERMIT <br />�6 TEMPORARY TANK CLOSURE <br />❑ 8 TANK REMOVED <br />DBA OR FACILITY NAME WHERE TANK IS INSTALLED: <br />QU L K 5'o P <br />MAiQ k&7- =0-1Z <br />> FIBERGLASS <br />I. TANK DESCRIPTION COMPLETE ALL ITEMS - SPECIFY IF UNKNOWN <br />A OWNER'S TANK I. D. # 12-1-1 <br />B. MANUFACTURED BY: xE2XES <br />C. DATE INSTALLED (MO/DAYNEAR) $ <br />D. TANK CAPACITY IN GALLONS: 10 O O p <br />II. TANK CONTENTS IF A-1 IS MARKED, COMPLETE ITEM C. <br />A. �1 MOTOR VEHICLE FUEL ❑ 4 OIL <br />B. <br />C 1a REGULAR UNLEADED ❑ 3 DIESEL ❑ 6 AVIATION GAS <br />F__] 2 PETROLEUM ❑ 80 EMPTY <br />�'i PRODUCT <br />❑ ib PREMIUM UNLEADED ❑ 4 GASAHOL ❑ 7 METHANOL <br />❑ 1c MIDGRADE UNLEADED ❑ 5 JET FUEL F-1 8 M85 <br />E::]3 CHEMICAL PRODUCT 95 UNKNOWN <br />2 WASTE <br />2 LEADED ❑ 99 OTHER (DESCRIBE IN ITEM D. BELOW) <br />D. IF (A.1) IS NOT MARKED, ENTER NAME OF SUBSTANCE STORED C. A. S. #: <br />III. TANK CONSTRUCTION MARK ONE ITEM ONLY IN BOXES A. B. AND C, AND ALL THAT APPLIES IN BOX D AND E <br />A. TYPE OF <br />❑ 1 DOUBLE WALL <br />❑ 3 SINGLE WALL WITH EXTERIOR LINER <br />❑ 5 INTERNAL BLADDER SYSTEM ❑ 95 UNKNOWN <br />SYSTEM <br />;K�2 SINGLE WALL <br />❑ 4 SINGLE WALL IN A VAULT <br />❑ 99 OTHER <br />B. TANK <br />❑ 1 BARE STEEL <br />❑ 2 STAINLESS STEEL <br />> FIBERGLASS <br />❑ 4 STEEL CLAD W/ FIBERGLASS REINFORCED PLASTIC <br />MATERIAL <br />❑ 5 CONCRETE <br />❑ 6 POLYVINYL CHLORIDE O 7 ALUMINUM <br />❑ 8 100% METHANOL COMPATIBLE W/FRP <br />(Primary Tank) <br />❑ 9 BRONZE <br />❑ 10 GALVANIZED STEEL <br />❑ 95 UNKNOWN <br />❑ 99 OTHER <br />C. INTERIOR <br />❑ 1 RUBBER LINED <br />❑ 2 ALKYD LINING <br />❑ 3 EPDXY LINING <br />❑ 4 PHENOLIC LINING <br />LINING OR <br />❑ 5 GLASS LINING <br />❑ 6 UNLINED <br />�95 UNKNOWN <br />El99 OTHER <br />COATING <br />IS LINING MATERIAL COMPATIBLE WITH 100'/ METHANOL? <br />YES&( NO— <br />D. EXTERIOR <br />CORROSION <br />❑ 1 POLYETHYLENE WRAP <br />❑ 2 COATING <br />❑ 3 VINYL WRAP <br />4 FIBERGLASS REINFORCED PLASTIC <br />PROTECTION <br />❑ 5 CATHODIC PROTECTION <br />❑ 91 NONE95 ( <br />UNKNOWN <br />❑ 99 OTHER <br />SPILL CONTAINMENT IN6iALLED (YEAR) OVERFILL EVENTION EQUIPMENT INSTALLED (YEAR) <br />E. SPILL AND OVERFILL, etc. DROP TUBE YES ✓ NO STRIKER PLATE YES NO DISPENSER CONTAINMENT YES NO <br />IV. PIPING INFORMATION CIRCLE A IF ABOVE GROUND OR U IF UNDERGROUND. BOTH IF APPLICABLE <br />A. SYSTEM TYPE <br />A U <br />1 SUCTION <br />U 2 PRESSURE A U <br />3 GRAVITY A U 4 FLEXIBLE PIPING A U 99 OTHER <br />B. CONSTRUCTION <br />A U <br />1 SINGLE WALL <br />A U 2 DOUBLE WALL AU <br />3 LINED TRENCH A U 95 UNKNOWN A U 99 OTHER <br />C. MATERIAL AND <br />Ao <br />1 BARE STEEL <br />A U 2 STAINLESS STEEL A U <br />3 POLYVINYL CHLORIDE (PVC) A U 4 FIBERGLASS PIPE <br />CORROSION <br />A U <br />5 ALUMINUM <br />A U 6 CONCRETE A U <br />7 STEEL W/ COATING A U 8 100% METHANOL COMPATIBLE W/FRP <br />PROTECTION <br />A U <br />9 GALVANIZED STEEL,,A <br />U 10 CATHODIC PROTECTION <br />A U 95 UNKNOWN A U 99 OTHER <br />D. LEAK DETECTION <br />MVTl <br />MECHANICAL UNE LEAK M <br />2 UNE TIGHTNESS3 CONTINUOUS INTERSTITIAL 4 ELECTRONIC UNE 5 AUTOMATIC PUMP ❑ <br />❑ [DLEAK E:]99 <br />DETECTOR <br />TESTING MONITORING <br />DETECTOR SHUTDOWN OTHER <br />/ TAMV 1 CAI[ nCTCf'TIAKI <br />❑ANNUAL <br />1 VISUAL CHECK 2 ECONCILMANUALIIIATIONVENTORY F-]3 MONITORING 4 GAUGING AUTOMATIC TANK ❑ 5 MON TORINGGROUND WATER 6 TESTINGTANN <br />❑ 7 MONITOR CONTINUOUS ❑ 8 SIR ❑ 9 WEEK LY MANUAL ❑ 10 MO TINLY TANK E::]95 UNKNOWN ❑ 99 OTHER <br />VI. TANK CLOSURE INFORMATION (PERMANENT CLOSURE IN-PLACE) <br />1. ESTIMATED DATE LAST USED (MO/DAY/YR) 2. ESTIMATED QUANTITY OF 3. WAS TANK FILLED WITH LAG n u_n_ I—I <br />ta • 'k. 2. <br />REMAINING GALLONS INERT MATERIAL? <br />THIS FORM HAS BEEN COMPLETED UNDER PEA4LTY OF PERJURY, AND TO THE BEST OF MY KNOWLEDGE, IS TRUE AND CORRECT <br />TANK OWNER'S NAME 0DATE <br />(PRINTEDd SIGNATURE) /J/�' yr J Gs LV /�, <br />LOCAL AGENCY USE ONLY THELSTTAD_ E <br />RR IS CDMPASFn nFTHFEMIR MIIRARFRS RFI nW V c/ <br />COUNTY # JURISDICTION # FACILITY # TANK # <br />STATE I.D:# 12-1;:7,1 i M;u `F <br />& <br />3 <br />PERMIT NUMBER <br />OERMIT APPROVED B'/DATE <br />PERMIT EXPIRATION DATE q <br />� � 4 <br />THIS FORM MUST BE ACCOMPANIED BY A PERMIT APPLICTION - FORM A, UNLESS A CURRENT FORM A HAS BEEN FILED. F C MUST BE COMPLETED FOR INSTALLATIONS. THIS FORM <br />SHOULD BE ACCOMPANIED BY A PLOT PWILE THIS FORM WITH THE LOCAL AGENCY IMPLEMENTING THIWRGROUND STORAGE TANK REGULATIONS <br />FORM B (6-95) <br />2 <br />