Laserfiche WebLink
SECONDARY PIPE TESTING <br /> <: 3 . O lt<IanUfaCt�arec .;...................................................ir .E) #�rmfessronaE;Frrgr �7 �h�e(�egbe(°!!!�:::..:::>: <br /> Test M+irtotl:... See •: ssui?e.:.;:: ...... .vacuum::. ::: . : : Qtat,� .; e� 4ttE:(se� iv)..... <br /> .. .. <br /> . . : : S : : t ? n3 : i ;> : 3: : : : <br /> et4eaS .. : »pG <br /> .. . <br /> Pi Pa Manufacturer Smith Smith <br /> Pipe Type FRP FRP <br /> PrimarY Pipe Diameter(inches) 22" <br /> Seconds Pie Diameter inches 3" <_ 3" <br /> ry P (inches) <br /> Product Stored Gasoline-87 Gasoline-91 <br /> Method of secondary pipe isolation Termination Boot Termination Boot <br /> Location of seconds pipe isolation Sum Sum <br /> rYPP p P <br /> >:>Estimated length of piping run(feet) 95' 105' <br /> (include length of branch runs) <br /> Wait time for pressure to stabilize(hr:min) 0:15 0:14 <br /> Test start time 9:35 AM 9:15 AM <br /> Initial pressure(psig) 5 5 <br /> Test end time 10:35 AM 10:15 AM <br /> Final pressure(psig) 5 5 <br /> Test duration(hours:minutes) 1:00 1:00 <br /> Change in pressure(psig) 0 0 <br /> Pass/Fail thresholdsi 0.5 <br /> (P 9) 0.5 <br /> TEST RESULT SU T <br /> PASS PASS <br /> Comments: <br /> 0 2002 Walton Engineering,Inc. <br />