Laserfiche WebLink
UNDER DISPENSER TAI (UDC) TESTING <br /> .................................................................................................................................................................................................................................................................................. <br /> ... ... ... . . . . . <br /> $� :::. QC> : .:'>>»»>» `<>`'>`` ` asAa4actrer« «> «;,... ">Sadard»<> >frafio: E_E<'r'>«<<' 4fterse31':>:: <<> <br /> h... ..IS ................... Q. t... i..r;>du c .. .... ... . . ..... . a.............................. ..... . <br /> :::::::::::::::::..:::::.:::.:.:::::::::.:.:.....:..............................................:......nr...._::::::::::::........................................n9........................................ ....... <br /> 5 Nlethocl > se$ .... Q Pressure »>::::. ::f) vacuum .....:::": >::Hydrosfatic �3. thet:( e below <br /> me _ se a>L4V I G I dfi t t3P>< `: ::<:<:<: <' #tltl A ll:s:' €ei�t ZDO€l tAfal>€oit:E rterh <br /> ..................................................... ......................................................................................................................................................................................... <br /> ........................................................................................................................................................................................................................................................................................... <br /> :;:::;::;::;::;:::::::::..:.:.,:.:llsl'1 tl `'::::;:'.;:::>::;.;:::. . .: :.::::::::.CBEs :i#:. / .:..::.:...:..:.:::. IS :: ::3/ :...:.::.:::.:::::..:..} H .. .:5/ ..... ........::.. ..: ..:.:..:::::::.,:.:..:.,:..:..::;: <br /> _...._..._.._....._................._..._ ............................................._.._..._..._.............._.......................... .........._............................._......_............. ....._..__.................................._.. <br /> UDC Manufacturer Bravo Bravo Bravo <br /> UDC Material Steel Steel Steel <br /> UDC Depth(inches) 9" 9" 9" <br /> Height from UDC bottom to highest Bottom Bottom Bottom <br /> piping penetration <br /> Height from UDC bottom to lowest Bottom Bottom Bottom <br /> electrical penetration <br /> Condition of UDC prior to testing Dry Dry Dry <br /> Portion of UDC tested Entire Entire Entire <br /> Type of shut-down present Float Float Float <br /> Was sensor removed for testing? N/A N/A N/A <br /> Was sensor properly replaced after testing? N/A N/A N/A <br /> Wait time for water level to stabilize(hr: 0:11 0:15 0:15 <br /> ( <br /> Depth of water level from UDC bottom in. 6" 6" 6" <br /> p ( ) <br /> Test start time 10:21 AM 9:54 AM 9:55 AM <br /> Test end time 10:51 AM 10:24 AM 10:25 AM <br /> Test duration(hr:min) 0:30 0:30 0:30 <br /> Change in water level(±0.000 inches) 0.0025 0.000 0.000 <br /> Pass/Fail threshold(0.005 inches/M.Hr.) 0.005 0.005 0.005 <br /> TE T <br /> S RESULT SU PASS PASS PASS <br /> Comments: <br /> UDC for dispenser 1/2 - halted 1st test, tightened nuts on shear valves and hose clamps on <br /> electrical penetrations. Restarted test - passed. <br /> 0 2002 Walton Engineering,Inc. <br />