Laserfiche WebLink
UST PROGRAM INSPECTION REPORT <br /> Facility Name:& &LSA'0� Address: LCw • i <br /> 25 CCR 2643 (d) Triennial tightness test of suction piping that is not continuously <br /> monitored <br /> 26 CCR 2643 (e) Biennial tightness test of gravity piping that is not continuously <br /> monitored <br /> 27 CCR 2662 Upgrade requirements for UST system <br /> 28 CCR 2661 Permit to repair UST system <br /> 29 HSC 25286(a) Permit to alter monitoring system <br /> 30 HSC 25298 (a) Illegal abandonment of UST system <br /> 31 HSC 25298 (b) Permit to temporarily close UST system <br /> 32 HSC 25298 (c) Permit to close UST system <br /> 33 Violation(s)not listed above <br /> Observation(s): <br /> annCI �&G-eck 01- ro UJ-w� U.S-F wwat c t uTy— e v - <br /> .t-V� a4- El L�(--M <br /> �k1f:)0 presPX1-i- ��aASA- 1L�go r L D Lo r t' <br /> �1�•V1.Ga,�. B1 �1-t-5-C1�D <br /> 't D OLZnCA-A 4At <br /> Inspection: Type- 0 Ll: 't/Yl C Date 1 l ) l g l?000 <br /> REHS Print /4'LLS0 vt VD I,<. �/D D� <br /> Received by, Print <br /> Title (7�.�v��Y- • Phone , 0`1- Z39'- 2-9S <br /> PHS 260(8/04/00) 2 of <br />