Laserfiche WebLink
WRITTEN MONITORING PROCEDURES <br /> FOR <br /> DOUBLE CONTAINMENT UNDERGROUND STORAGE TANK SYSTEMS <br /> These written procedures are required by California UST Regulations, Section 2632(4)(1),must <br /> be maintained at the UST location at all times, and are a condition of the operating permit. <br /> Quik Stop Market#121 <br /> 1196 West Louise Avenue <br /> Manteca, California 95336 <br /> The gasoline storage and dispensing system at this location consists of two (2) 12,000 gallon, <br /> double wall fiberglass, brine filled interstitial, underground storage tanks serving three (3) double <br /> sided blend dispensers (3 product). Product lines are double wall fiberglass. <br /> A. The interstitial space of each tank and product line is monitored continuously by probes <br /> within the brine reservoir and turbine sump, respectively. <br /> B. The Gilbarco EMC 3.1 tank and line monitoring system is manufactured by Veeder- <br /> Root. Leak conditions trigger visual and audible alarms located in the monitoring system <br /> control panel, as well as shut off power to turbines. <br /> C. The monitor control panel is located in the market office. The monitor is placed in test <br /> mode daily to check alarm function. Results are recorded on a "Daily Monitoring System <br /> Inspection Log". <br /> D. Monitoring is the responsibility of G. Singh or S.J. Kaur, Franchisees, or their designated <br /> duty clerk. Maintenance of the monitoring equipment is the responsibility of Quik Stop <br /> Markets, Inc. Required work will be authorized by Mike Karvelot, Director of <br /> Environmental Affairs. <br /> E. If an alarm occurs,the Franchisee will immediately contact the Quik Stop Gasoline <br /> Department, which will in turn dispatch a qualified service contractor to the site. The <br /> service contractor will determine the cause of alarm and advise Quik Stop of site <br /> conditions. If an unauthorized release to secondary containment has occurred, action will <br /> be immediately taken to implement the Written Response Plan. <br /> F. The monitoring panel and interstitial probes are checked and recertified annually. <br /> Preventive maintenance is scheduled annually in conjunction with recertification. <br /> G. A description of the gasoline system operation and operator's responsibilities are included <br /> in the Franchise Agreement. Initial training in operation of the tank system and <br /> monitoring equipment is conducted "on the job" under the supervision of Quik Stop <br /> personnel. <br />