My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2003-2005
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LOUISE
>
1196
>
2300 - Underground Storage Tank Program
>
PR0231430
>
COMPLIANCE INFO_2003-2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/2/2024 12:38:04 PM
Creation date
6/23/2020 6:48:32 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2003-2005
RECORD_ID
PR0231430
PE
2361
FACILITY_ID
FA0000848
FACILITY_NAME
QUIK STOP MARKET #2121
STREET_NUMBER
1196
Direction
W
STREET_NAME
LOUISE
STREET_TYPE
AVE
City
MANTECA
Zip
95336
APN
217-410-43
CURRENT_STATUS
01
SITE_LOCATION
1196 W LOUISE AVE
P_LOCATION
04
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231430_1196 W LOUISE_2003-2005.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
440
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WRITTEN MONITORING PROCEDURES <br /> FOR <br /> DOUBLE CONTAINMENT UNDERGROUND STORAGE TANK SYSTEMS <br /> These written procedures are required by California UST Regulations, Section 2632(4)(1),must <br /> be maintained at the UST location at all times, and are a condition of the operating permit. <br /> Quik Stop Market#121 <br /> 1196 West Louise Avenue <br /> Manteca, California 95336 <br /> The gasoline storage and dispensing system at this location consists of two (2) 12,000 gallon, <br /> double wall fiberglass, brine filled interstitial, underground storage tanks serving three (3) double <br /> sided blend dispensers (3 product). Product lines are double wall fiberglass. <br /> A. The interstitial space of each tank and product line is monitored continuously by probes <br /> within the brine reservoir and turbine sump, respectively. <br /> B. The Gilbarco EMC 3.1 tank and line monitoring system is manufactured by Veeder- <br /> Root. Leak conditions trigger visual and audible alarms located in the monitoring system <br /> control panel, as well as shut off power to turbines. <br /> C. The monitor control panel is located in the market office. The monitor is placed in test <br /> mode daily to check alarm function. Results are recorded on a "Daily Monitoring System <br /> Inspection Log". <br /> D. Monitoring is the responsibility of G. Singh or S.J. Kaur, Franchisees, or their designated <br /> duty clerk. Maintenance of the monitoring equipment is the responsibility of Quik Stop <br /> Markets, Inc. Required work will be authorized by Mike Karvelot, Director of <br /> Environmental Affairs. <br /> E. If an alarm occurs,the Franchisee will immediately contact the Quik Stop Gasoline <br /> Department, which will in turn dispatch a qualified service contractor to the site. The <br /> service contractor will determine the cause of alarm and advise Quik Stop of site <br /> conditions. If an unauthorized release to secondary containment has occurred, action will <br /> be immediately taken to implement the Written Response Plan. <br /> F. The monitoring panel and interstitial probes are checked and recertified annually. <br /> Preventive maintenance is scheduled annually in conjunction with recertification. <br /> G. A description of the gasoline system operation and operator's responsibilities are included <br /> in the Franchise Agreement. Initial training in operation of the tank system and <br /> monitoring equipment is conducted "on the job" under the supervision of Quik Stop <br /> personnel. <br />
The URL can be used to link to this page
Your browser does not support the video tag.