Laserfiche WebLink
UST SYSTEM DRAWING INFORMATION <br /> i. Three complete sets of plans (include manufacturer's specification sheets for proposed equipment to be installed). <br /> 2. Plans drawn to scale in non-erasable print. <br /> 3. Plot plan to show location of tanks and all associated piping. <br /> 4. / Striker plates or drop tube-mounted bottom protectors illustrated below all accessible openings. <br /> 5. v Tank cross-sectional diagram. <br /> 6. 7 Detail of tank, associated piping, excavation and cover. <br /> 7. 7 Tank(s) and piping approved by a nationally recognized independent testing organization. fTitte 23, Chapter 16, <br /> / Article 3, Section 2631 (b) & 26353 <br /> Verification of product compatibility with the tankCs), piping, monitoring <br /> / device(s), epoxy or silicone glues, etc. <br /> 9. 1/ - Manufacturer's written installation instructions for tank(s), piping, monitoring devices, etc. <br /> 10. " At the installation site, prior to installation, a tightness test shall be performed on both primary (1°) and <br /> secondary (20) containment systems before covering. [Section 2635 (a) (3) & (4)1 <br /> 11. Tank integrity test required upon completion of installation with tank in operating condition. Test results to be <br /> submitted directly to PHS-EHD from the testing company or owner of facility. [Health i Safety Code, Division 20, <br /> Chapter 6.7, Section 25291 (h)] <br /> 12. TANK COMPOSITION <br /> TANK # 7i ` — # C # �J # # <br /> CAPACITY LZ g00 z oc�o <br /> MANUFACTURER %SES �Cl1C�S <br /> COMPOSITION F1 bS 4VN- Pc,K <br /> MODEL 000b(16 U <br /> PRODUCT g6tr, VIJC, Nc.' <br /> CORROSION PROTECTION 7 u <br /> n N <br /> U.L. LISTED <br /> COMPATIBILITY WITH 100% N h <br /> METHANOL <br /> 13. TANK(s) TO BE INSTALLED <br /> _ A. Steel-clad with fiberglass reinforced plastic coatings, composites, or equivalent non-metallic exterior <br /> coatings or coverings. <br /> (1) Tested at the installation site using an electric resistance holiday detector. <br /> (2) Vacuum applied to interstitial space. <br /> B. Fiberglass <br /> (1) Installation instructions require an air test and soap bubble test prior to installation. <br /> (2) Vacuum applied to interstitial space. <br /> (3) Hydrostatic annular (primary tank pressure test). <br /> C. Non-clad steel tank (Section 2635 (a) (2) (A)) <br /> (1) Cathodic protection provided for entire tank, piping and components Crests, bolts, washers, <br /> etc.). <br /> _ (2) Field installed cathodic protection systems designed and certified as adequate by a <br /> corrosion specialist. <br /> (3) Impressed current systems to be inspected no less than every 60 days. <br /> 5 <br />