Laserfiche WebLink
t9, Piping (cross-sectional diagram, including connections to tank and dispensers). <br /> (A) Vent and tank riser primary containment system equipped with overfill prevention system that: <br /> —21 <br /> _ Restricts delivery of flow to tank [Section 2635 (b) (2) (B) or (C)), or <br /> Provide positive shut off of flow to the tank at no more than 95 % [Section 2635 (b)(2)(01, 'or <br /> (g) v Vapor recovery piping designed so it cannot contain liquid phase product, or <br /> (C) Suction piping (below grade piping operates at less than atmospheric pressure) [Section 2636 (a) (3)) <br /> _ Sloped so contents of the pipe will drain back into the storage tank if the suction is <br /> released. <br /> No valves or pumps installed below grade. <br /> / Inspection method provided to demonstrate compliance with section 2636 (a) (3). <br /> Corrodible underground piping protected against corrosion (Section 2636 (b)). <br /> (E) Underground primary piping will meet all of the following requirements <br /> V Primary piping in contact with hazardous substance under normal owlaition conditions shall be: <br /> installed inside a secondary containment system in the form of: V secondary pipe_Vault or <br /> / _lined trench to be sloped to a collection sump at the low p — of the piping. <br /> v Primary piping and secondary containment systems will be installed in accordance with industry <br /> code of practice and voluntary consensus standards.. <br /> N� tined trench used as secondary containment <br /> Material compatible with the substance stored. <br /> Covered and capable of supporting any expected vehicular traffic. <br /> (F) Underground piping with secondary containment will be equipped and monitored as follows: <br /> Secondary containment will be equipped with a continuous monitoring system connected to an audible <br /> and visual alarm system. <br /> _ Automatic line teak detectors will be installed on pressurized piping <br /> Manufacturer: Model: <br /> Annual monitoring will be conducted on the pressurized piping with secondary containment. <br /> _ Annual tine tightness test will not be required if the continuous monitor shuts down the pump and <br /> activates the alarm system when a release is detected and when the continuous monitoring system <br /> / fails or is disconnected. <br /> 20. v State Water Resources Control Board "Facility (A)" and "Tank Permit (B)" application forms submitted. <br /> 21. Plan review and operating permit fees paid. <br /> 22. What is the approximate depth to ground water: ZD <br /> (include source of information - borehole logs, monitoring welt data, water <br /> studies, etc.) Slq-tJ -50AGZ\1(IJ CO. 6Kw% w*� -'[a2 gvoR-7 — iq-7s- <br /> 23. Total number of tanks on site after installation: 2- <br /> 24. County/City Fire District and Building Department notified. <br /> 25. In the event contamination is observed, confirmed or suspected as a result of a leaking UST system it is your <br /> responsibility [in accordance with (CCR) Title 23, Division 3, Chapter 16, Article 11, Corrective Action <br /> Requirements] as an owner or operator to submit a workplan to PHS-EHD Site Mitigation Unit prior to initiating any <br /> assessment or remediation activities. For further assistance contact the Site Mitigation Unit at (209) 469-3450. <br /> The wne o ra or must acknowledge this responsibility for workplan submittal by signature and date below. <br /> Na <br /> t I e A&J4. Wr 1WV6G IWCZ U 6T4 Date Q q �— <br /> CONDITIONS OF APPROVAL � � 'd A--V 1 <br /> 8 <br />