Laserfiche WebLink
0 0 <br />ST LOUISE AVENUE <br />_- S 89151'05" W =119FT <br />3-_--=_- -- -' - <br />s � <br />/ ^ <br />--- <br />1 <br />1 spy :V [�j El <br />_71 22 48X30 CLR LEVEL AREA <br />0% MA,0 TYP. EACH SIDE <br />(. I o_ .� Sx SLOPE 10" AROUND <br />DISPENSERS, TTP. <br />d : <br />i <br />NI _ "✓ GUTTER E.TR -- <br />Q 1 <br />. Y2K' IiEO L t <br />Z r 1 -t 19 21 23(21 <br />OZ ----- - - - - 1 <br />.. II EXIST-Exianw-,ToREMAIN 1 <br />Z I 26 <br />2Z) ---------------- -- -- I� ---- --I---- <br />7r _ -, <br />1 <br />Se <br />I <br />I <br />- <br />S 89'59'05" W 88.59' - <br />oPETROLEUM <br />0 IV 20 so 40 50 <br />rl <br />PETROLEUM PROJECT DESCRIPTION <br />REMOVE EXISTING <'2.I - 10,000 GAL. 4 ( 1) - 8DOO FIBERCSLASS TAN1G8, PIPING, ISLAND, <br />DISPENSERS AND SLABS. REPLACE WITH NEW USTs, PIPlIWj, BOLLARDS, DISPENSERS, <br />PANS AND SLAW. <br />124 ► • <br />O. REMOVE EXISTING USTs, PIPING, DISPENSERS, ISLAND AND SLABS. <br />1. (3) TANK VENT RISERS - 0) TO REMOVE, (2) E.T.R. INSTALL NEW SWIWs JOINTS (2) <br />AT BASE AND CONNECT TO NEW VENT LINES. INSTALL NEW PN VAL`/E/CAPS. <br />2. 2"0 FIBERGLASS TANK VENT LINES SLOPED BACK TO EACH TANK AT 1/8" <br />PER FOOT, MINIMUM. <br />3. 6" SQUAD TUBE STL. PIPE BOLLARDS. COTE FILLED, SMOOTH TOP. <br />PANT TO MATCH CANOPY COLORS. TYPICAL OF 8. <br />4. GILBARCO 340 DISPENSER: W/ CRIND, ON 'BRAVO BOX' DISPENSER PAN. <br />PROTIDE SEAL-_( FW / CONIDIlIT / WIRE PER MANUF. INSTALLATION <br />\ PROCEDURES. i TYPIC 3. <br />5. 3"o FIBERGLASS PHASE II APOR RECOVERY PIPING FROM DISPENSERS <br />TO TANKS. SLOPE BACK TO TANKS AT 1/8" PER FOOT, M44IMLN1. <br />6. 2"♦ PRODUCT PIPE W/ 3"0 SECONDARY CONTAINMENT PIPE. SLOPE BACK <br />TO TANKS AT 1/8" PER FOOT, MINIMUM. <br />1. NEW UNDER3ROUND STORAGE TANGS. (2) • 12000 DBL. WALL FRP., <br />BY XER -�ES CORP. <br />S. BRINE FILLED TANK ANNULUS RESERVOIR W/ HYDROSTATIC LEVEL SENSOR <br />AND 18" W.T. MANHOLE, TYPICAL OF 2. <br />% TANK FILL WITH 5 GALLON (MIN.) FILL CONTAINMENT. TYPICAL OF 2. <br />10. PHASE I VAPOR RECOVERY WITH 5 GALLON )MIN.) FILL CONTAINMENT. <br />TYPICAL OF 2. <br />11. MAGNETOSTRICTIVE TANK GAUGE WITHIN STP SUMP / MANWAY. TYPICAL OF 2. <br />12. SUBMERSIBLE TURBINE PUMP (TYP. OF 2) W/IN 424 F.R.P. SUMP W/ FLOAT SWITCH <br />SUMP PROBE, LID AND 36" MANWAY. AUTO STP SHUTDOWN ON PROBE ALARM. <br />13. NEW 8" THICK CORETE TANK SLAB W/ 04 REBAR AT 18' O.G. BOTH WAYS. <br />14. BACKFILL TRENCHES WITH PEA GRAVEL TO LEVEL REQUIRED FOR NEW SLURRY <br />COVER AND PAVING BASE, PROVIDE SLURRY CONCRETE 4" THICK MIN. OVER <br />PEA GRAVEL W4ERE REQUIRED, ENGINEERED BACKFILL SHALL BE OF SUITABLE <br />MATERIAL PLACED UNDER SUPERVISION OF GC SUPPLIED SOILS ENGINEER. <br />3 CCP1E8 OF THE ENGINEER -6 REPORTS, INCLUDING 001 -TACTION REPORT, SHALL <br />BE FORWARDED TO OWNER'S ARCHITECT WAN 20 DAYS OF PROJECT COMPLETION. <br />15. NEW 6" THICK CONCRETE DRIVE SLAB W/ e4 REBAR AT 24" O.G. BOTH WAYS. <br />OVER 6' AGGREGATE BASE. <br />16. NEW MONITOR CONTROLS AND ALARM, W/ VISUAL a AUDIBLE ACCESSIBILITY. <br />11. NEW E.S.O. WT14 VISIBLE SId-01, SEE GENERAL NOTES, CONFIRM LOCATION. <br />18. EXISTING AIR / WATER UNIT, TO REMAIN. <br />I% EXISTING AG. PAVING 1 CURBINCs, TO REMAIN. PATCH A,C. PAVING AND BASE <br />AS RECIUIRED WdEN DISTURBED BY WORK. <br />20. EXISTING CANOPY TO REMAIN. REMOVE EXISTING 400 W CANOPY LIGHTS (4). <br />SANDBLAST EXISTING DECKING / CoUTTERM FSP, PAINT AND CAULK <br />EXISTING DECKING / GUTTERING, INSTALL. (6) NEW, OWNER SUPPLIED, 320 WATT <br />SM.H. SCOTTSDALE CANOPY LIGHTS, AS SHOWN. <br />2L PAINT ALL EXPOSED METALS, UNLESS PRERNISI-ED, W/ SUITABLE PAINT, <br />N APPROVED COLORS. <br />22. REMOVE EXISTING BROKEN CURBING AND REPLACE, AS SHOWN. PROVIDE AND <br />INSTALL PAVINCs TO MATCH EXISTING, AS REQUIRED. <br />23. GZ. SHALL BE RESPONSIBLE FOR ALL WOR, SHOWN ON THESE PLANS <br />AND SUPPORTING DOCUMENTS, UNLESS SPECIFICALLY LISTED AS BY OTHERS. <br />24, CONFIRM : TE, OR SUPPLY 4 INSTALL, DEDICATED/ISOLATED <br />SINGLE PONT &ROUND SYSTEM FOR ALL NEW ELECTRONIC EQUIPMENT. <br />PLEAS PREFER TO DETAIL. NEW &ME SUPPIRESSOR PROVIDED AND <br />INSTALLED BY GSC, MODEL PS -12 SURGE MANAdEMENT SYSTEM. <br />25. REPLACE EXIST, AREA LIGHTS 4 POLE W/ NEW OWER SUPPLIED LKW$400LE. <br />RECONNECT ELECTRICAL. VERIFY CONDUCTOR/ BREAKER REOWREhETlTS <br />AND REPLACE AS RE62T% <br />26. SUPPLY/ INSTALL. MISSING DBL TUBE FLUORESCENT SOFFIT FIXTURES (TT'P. OF 3) <br />AS SNO11 8 FT. FIXTURES. FIELD VERIFY. <br />21. ALL MATERIALS AND EQUIPMENT SHALL BE INSTALLED AND TESTED PER <br />MAMPACTURER'S "TRUCTIOIB, APPLICABLE CODES AND STANDARDS, <br />THE PLANS AND SPECIFICATIONS, AND LOCAL AGENCY REQUI TS. <br />28. EXIST. LANDSCAPE TO REMAIN. PROTECT EXIST. S S AND PLANT <br />MATERIAL DURING CONST. AS MUCH AS POSSIBLE. REPLACE PLANTS 1 REPAIR <br />STRUCTURES AS REOIIRED WHEN DISMIRSED BY WORT, (MATC14 EXISTING) <br />O L <br />uq py TM <br />Y t L>D <br />W W w0 <br />10 IC 0 4 <br />a< aQ <br />0m10 <br />06 <br />Q xZ Z2 �® <br />g <br />00 WO 09) <br />w Cw 0x <br />(� ® IY N cc r 4 <br />LL IL Q4. IL <br />VEP <br />QUIK STOP <br />121 <br />1196 W. LOUISE AVE. <br />MANTECA, CA 95336 <br />(209) 239-2991 <br />SAN JOAQUIN COUNTY <br />,4PN 211-410-43 <br />ALTON <br />NGINEERING. INC. <br />jw <br />PO. BOX 1028 <br />843 RISKE L4NE <br />WEST SACRAMENTO, CA 18691 <br />(Sib) 312 -WO 313-11`12 <br />Ni" JW MfCr4dM0A de <br />Wto" CP HM4M P84M M <br />PPGTWT PK&XN 8014MOU W- <br />AD awl N7!S00 PM ANr PWM <br />m=NWNCHP vwmN!Y"m <br />am assa.w Nw <br />awl N7! d a�corm OR MA= <br />unart Ns Waal" a <br />relnx+wtwwa m NG <br />COPYRIGHT 0 1997 <br />DRAW) BY TGAMEL <br />CHKD' BY MEL <br />DATE 19 NOV 91 <br />SCALE I" a 10' <br />306 NO. 43610 <br />SHEET TITLE <br />PETROLEUM <br />SITE PLAN <br />- <br />00 <br />PET <br />OF 1 SHEETS <br />EXISTING <br />CONVENIENCE <br />I 28 <br />STORE <br />�I <br />�I 18 <br />I <br />I <br />I <br />I <br />- <br />S 89'59'05" W 88.59' - <br />oPETROLEUM <br />0 IV 20 so 40 50 <br />rl <br />PETROLEUM PROJECT DESCRIPTION <br />REMOVE EXISTING <'2.I - 10,000 GAL. 4 ( 1) - 8DOO FIBERCSLASS TAN1G8, PIPING, ISLAND, <br />DISPENSERS AND SLABS. REPLACE WITH NEW USTs, PIPlIWj, BOLLARDS, DISPENSERS, <br />PANS AND SLAW. <br />124 ► • <br />O. REMOVE EXISTING USTs, PIPING, DISPENSERS, ISLAND AND SLABS. <br />1. (3) TANK VENT RISERS - 0) TO REMOVE, (2) E.T.R. INSTALL NEW SWIWs JOINTS (2) <br />AT BASE AND CONNECT TO NEW VENT LINES. INSTALL NEW PN VAL`/E/CAPS. <br />2. 2"0 FIBERGLASS TANK VENT LINES SLOPED BACK TO EACH TANK AT 1/8" <br />PER FOOT, MINIMUM. <br />3. 6" SQUAD TUBE STL. PIPE BOLLARDS. COTE FILLED, SMOOTH TOP. <br />PANT TO MATCH CANOPY COLORS. TYPICAL OF 8. <br />4. GILBARCO 340 DISPENSER: W/ CRIND, ON 'BRAVO BOX' DISPENSER PAN. <br />PROTIDE SEAL-_( FW / CONIDIlIT / WIRE PER MANUF. INSTALLATION <br />\ PROCEDURES. i TYPIC 3. <br />5. 3"o FIBERGLASS PHASE II APOR RECOVERY PIPING FROM DISPENSERS <br />TO TANKS. SLOPE BACK TO TANKS AT 1/8" PER FOOT, M44IMLN1. <br />6. 2"♦ PRODUCT PIPE W/ 3"0 SECONDARY CONTAINMENT PIPE. SLOPE BACK <br />TO TANKS AT 1/8" PER FOOT, MINIMUM. <br />1. NEW UNDER3ROUND STORAGE TANGS. (2) • 12000 DBL. WALL FRP., <br />BY XER -�ES CORP. <br />S. BRINE FILLED TANK ANNULUS RESERVOIR W/ HYDROSTATIC LEVEL SENSOR <br />AND 18" W.T. MANHOLE, TYPICAL OF 2. <br />% TANK FILL WITH 5 GALLON (MIN.) FILL CONTAINMENT. TYPICAL OF 2. <br />10. PHASE I VAPOR RECOVERY WITH 5 GALLON )MIN.) FILL CONTAINMENT. <br />TYPICAL OF 2. <br />11. MAGNETOSTRICTIVE TANK GAUGE WITHIN STP SUMP / MANWAY. TYPICAL OF 2. <br />12. SUBMERSIBLE TURBINE PUMP (TYP. OF 2) W/IN 424 F.R.P. SUMP W/ FLOAT SWITCH <br />SUMP PROBE, LID AND 36" MANWAY. AUTO STP SHUTDOWN ON PROBE ALARM. <br />13. NEW 8" THICK CORETE TANK SLAB W/ 04 REBAR AT 18' O.G. BOTH WAYS. <br />14. BACKFILL TRENCHES WITH PEA GRAVEL TO LEVEL REQUIRED FOR NEW SLURRY <br />COVER AND PAVING BASE, PROVIDE SLURRY CONCRETE 4" THICK MIN. OVER <br />PEA GRAVEL W4ERE REQUIRED, ENGINEERED BACKFILL SHALL BE OF SUITABLE <br />MATERIAL PLACED UNDER SUPERVISION OF GC SUPPLIED SOILS ENGINEER. <br />3 CCP1E8 OF THE ENGINEER -6 REPORTS, INCLUDING 001 -TACTION REPORT, SHALL <br />BE FORWARDED TO OWNER'S ARCHITECT WAN 20 DAYS OF PROJECT COMPLETION. <br />15. NEW 6" THICK CONCRETE DRIVE SLAB W/ e4 REBAR AT 24" O.G. BOTH WAYS. <br />OVER 6' AGGREGATE BASE. <br />16. NEW MONITOR CONTROLS AND ALARM, W/ VISUAL a AUDIBLE ACCESSIBILITY. <br />11. NEW E.S.O. WT14 VISIBLE SId-01, SEE GENERAL NOTES, CONFIRM LOCATION. <br />18. EXISTING AIR / WATER UNIT, TO REMAIN. <br />I% EXISTING AG. PAVING 1 CURBINCs, TO REMAIN. PATCH A,C. PAVING AND BASE <br />AS RECIUIRED WdEN DISTURBED BY WORK. <br />20. EXISTING CANOPY TO REMAIN. REMOVE EXISTING 400 W CANOPY LIGHTS (4). <br />SANDBLAST EXISTING DECKING / CoUTTERM FSP, PAINT AND CAULK <br />EXISTING DECKING / GUTTERING, INSTALL. (6) NEW, OWNER SUPPLIED, 320 WATT <br />SM.H. SCOTTSDALE CANOPY LIGHTS, AS SHOWN. <br />2L PAINT ALL EXPOSED METALS, UNLESS PRERNISI-ED, W/ SUITABLE PAINT, <br />N APPROVED COLORS. <br />22. REMOVE EXISTING BROKEN CURBING AND REPLACE, AS SHOWN. PROVIDE AND <br />INSTALL PAVINCs TO MATCH EXISTING, AS REQUIRED. <br />23. GZ. SHALL BE RESPONSIBLE FOR ALL WOR, SHOWN ON THESE PLANS <br />AND SUPPORTING DOCUMENTS, UNLESS SPECIFICALLY LISTED AS BY OTHERS. <br />24, CONFIRM : TE, OR SUPPLY 4 INSTALL, DEDICATED/ISOLATED <br />SINGLE PONT &ROUND SYSTEM FOR ALL NEW ELECTRONIC EQUIPMENT. <br />PLEAS PREFER TO DETAIL. NEW &ME SUPPIRESSOR PROVIDED AND <br />INSTALLED BY GSC, MODEL PS -12 SURGE MANAdEMENT SYSTEM. <br />25. REPLACE EXIST, AREA LIGHTS 4 POLE W/ NEW OWER SUPPLIED LKW$400LE. <br />RECONNECT ELECTRICAL. VERIFY CONDUCTOR/ BREAKER REOWREhETlTS <br />AND REPLACE AS RE62T% <br />26. SUPPLY/ INSTALL. MISSING DBL TUBE FLUORESCENT SOFFIT FIXTURES (TT'P. OF 3) <br />AS SNO11 8 FT. FIXTURES. FIELD VERIFY. <br />21. ALL MATERIALS AND EQUIPMENT SHALL BE INSTALLED AND TESTED PER <br />MAMPACTURER'S "TRUCTIOIB, APPLICABLE CODES AND STANDARDS, <br />THE PLANS AND SPECIFICATIONS, AND LOCAL AGENCY REQUI TS. <br />28. EXIST. LANDSCAPE TO REMAIN. PROTECT EXIST. S S AND PLANT <br />MATERIAL DURING CONST. AS MUCH AS POSSIBLE. REPLACE PLANTS 1 REPAIR <br />STRUCTURES AS REOIIRED WHEN DISMIRSED BY WORT, (MATC14 EXISTING) <br />O L <br />uq py TM <br />Y t L>D <br />W W w0 <br />10 IC 0 4 <br />a< aQ <br />0m10 <br />06 <br />Q xZ Z2 �® <br />g <br />00 WO 09) <br />w Cw 0x <br />(� ® IY N cc r 4 <br />LL IL Q4. IL <br />VEP <br />QUIK STOP <br />121 <br />1196 W. LOUISE AVE. <br />MANTECA, CA 95336 <br />(209) 239-2991 <br />SAN JOAQUIN COUNTY <br />,4PN 211-410-43 <br />ALTON <br />NGINEERING. INC. <br />jw <br />PO. BOX 1028 <br />843 RISKE L4NE <br />WEST SACRAMENTO, CA 18691 <br />(Sib) 312 -WO 313-11`12 <br />Ni" JW MfCr4dM0A de <br />Wto" CP HM4M P84M M <br />PPGTWT PK&XN 8014MOU W- <br />AD awl N7!S00 PM ANr PWM <br />m=NWNCHP vwmN!Y"m <br />am assa.w Nw <br />awl N7! d a�corm OR MA= <br />unart Ns Waal" a <br />relnx+wtwwa m NG <br />COPYRIGHT 0 1997 <br />DRAW) BY TGAMEL <br />CHKD' BY MEL <br />DATE 19 NOV 91 <br />SCALE I" a 10' <br />306 NO. 43610 <br />SHEET TITLE <br />PETROLEUM <br />SITE PLAN <br />- <br />00 <br />PET <br />OF 1 SHEETS <br />