Laserfiche WebLink
MAMMAL AND <br />I. UNLESS N THEE DOCUMENTS, ALL <br />EQUIPMENT MATERIAL AND ARTICLE® INCORPORATED N THE WOW <br />COVMMD BY THEE OCCUPIESIn ARE TO 139 NEW AND OF THE MOST SUITABLE <br />GRACE FOR THE PROCESS INTENDED. <br />-. THE CONTRACTOR SMALL PUGHON TO TIM CUM" AGENT FOR NO <br />APPROVAL THE NAME OF THE MAWPA=UIOK THE MODEL MAIGGIR, AND <br />OTHER IDENTIFYING DATA AND NPOINIATION REWNCTM THE <br />C-YAMLITY, NATURE, AND RATED OF THE MACNNEIIY AND <br />MECHANICAL AND OTHER ff0JVWVNT U14104 THE CONTRACTOR OCHTEPIPLATES, <br />INCORPORATING N THE WOW WHEN REQUIRED BY THE OWNlIW6 AGENT. <br />3. WHEN REQUIRED BY THEE 00OD'10NTS OR LINEN CALLED FOR BY THE <br />OW WPW& AGENT, THE CONTRACTOR SHALL FURNISH THE AGENT FOR <br />APPROVAL RCL INIAPIOUTICH CONNCEFIRM THE MATERIAL OR ARTICLES <br />W4104 WE 00INTEMPLATES INCORPORATING N THE WMM WNW 80 <br />01111111CM, SAPPLAS MAY E SUBMITTED POR APPROVAL AT THE <br />CONTRACTOR'S EXPIPAR, WITH A" 8HR-PNC CFWR098 PREPAID. <br />* MACHINERY , MATERIAL, AND ARTICLES INSTALLED OR USED <br />WTIC T ONdUMO APPROVAL SMALL BE AT TE RISK OF SUBSISOJENT <br />S. ALL WORMC TO BE DOH N ACCORDANCE MTN APPLICABLE CODES AND <br />REGU.ATIONM, <br />6. ALL MATERIALS *NA" BE NOTALLED PER INSTRUCTIONS, <br />AND TAM DOCUMENTS. CO FLITS SMALL BE BROUGHT TO THE ATTENTION <br />OF THE OWN1" ENGINEER. <br />1. P ANY O THESE DOQtENTS INDICATE A COPLICT WITH 714E STATE OR <br />LOCAL RZOUNIMMITO AS ,ARE CURRENTLY N ERECT AT THE TIME OF THIS <br />PROJECT, IT b EXPECTED THAT THE MOOT a4TRICTIV9 CODTIOWW <br />WILD APPLY. <br />L CONTRACTOR EMPLOYEES TO HAVE 02HP1.E1`E0 40 HAM 00" TRAINING <br />COURSE PRIOR TO THE START CP W101M CERTPICATON OF THIS MOOT <br />PRovow TO THE O UIER'8 EH:df$R PRIOR TO THE START cp WOW <br />2. C2CRACTCO EMPLOYEES TO HAVE COMPLETED THE PIPING <br />TRAINING RREGIURRANIIINTS N WITH 064 C ALFCRBA UST <br />REGULATIONS, CERTIFICATES SMALL BE PROVIDED TO OWNER <br />CONTRACTOR SMALL C4"49TE THE P'PNG INSTALLATION CHECKLIST <br />SUPPLIED RIPUtl MANUFACTURER AND SMALL RU?USH THE CHEOGLbT TO <br />OWNER <br />3. COHTRACTOR TO HAVE BEEN TRAINED AD CEM09RD BY THE TANG <br />N CORRECT TANK INSTALLATION N ACCORDANCE WITH 1904 <br />CALIFORNIA UST 1EMLATIGNB. CERTIFICATES SMALL IN PROVIDED 10 <br />CODER CONTRACTOR SHALL COMPLETE THE TAMC INSTALLATION CHISCKLIST <br />SLED TANK PL44JkACn=R AND SMALL FURNISH THE CECKLMT TO <br />OWER <br />A CLNTRACTOR TO DEVELOP A SPECIFIC SITE SAFETY PLAN FOR TANG <br />REMOVAL AND TAMC INSTALLATION PRIOR TO THE START OF WORC. <br />CONTRACTOR WILL CONDUCT WEEKLY JOB SITE SAFETY-EETIFIGS WITH T'S <br />S AND THE MEETING MINUTES, WILL ISE SUPPLED TO <br />0. COSITRACTOR SHALL HAVE THE FOLLOWING LICE SE& <br />A MINERAL ENGINEERING 'A' <br />D. MAZARPOLIO MATERIAL OU06TAHM HANDLING (MHAZ-) <br />6. CONTRACTOR SMALL MAVE THE FOLLOWING 94SU4ANCE. CONTRACTOR $MALL. <br />HAVE PROOF OFF M*4 INGUItANCE ON FILE WITH OWER BY NAMING DINER <br />AS 'ADDITIONAL. . <br />A STAIUTORY VE LIABILITY <br />B. C4DMv4B4P4VA GENERAL LIABILITY, WITH A COMBINED SINGLE <br />LIMIT O NOT LESS THAN 8.000~ PER 00=411RENCIIII FOR BODILY <br />INJURY AND PROPERTY DAMAGE. <br />G AUTOMOBILE LWISI LTY COVERING IBE OF ALL OWED HIED <br />VEHICLES WT14 A COMBINED SINGLE LMT CP 8NGL.L UNIT OF LIABILITY <br />OF NOT LENT THAN 0"Do2Y0 PER OCOURFIENCE FOR BODILY INJURY AND <br />PROPERrY DAMAGE. <br />1. GENERAL CONTRACTOR TO PU INWH ALL LABOR MATERNAL, EQUIP -EAT, AND <br />SERVICES NECESSARY FOR OR REASORABLY INCIDENTAL TO THE <br />SATISFACTORY COMPLETION OF ALL WADRK SHOWN CK CALLED FOR OR <br />PINGLURED 6T THE <br />A ALL WOW SHALL 99 PERFORMED, N ACCORCO CE WITH THE UHWCFM <br />BuLoM CADS, =Pow FEE CODE, NATIONAL L0.EGTd-A, CODE. <br />CALWPCM" UNDERGROUND STORAGE TANG REGULATIONS,, 081" <br />o"TacnaN SAFETY cs=M AD 4141' 011 -ER APPLICABLE STATE, CITY, <br />Oft COUNTY ORDINANCES, <br />S PETROL PERMITS TO WE ENURED BY CODER AND SUPPLE TO CONRRACTOW <br />COUPRACTOR b RESPONSIBLE FOR COMPLYING UNT14 ALL FEINT <br />COMITION114 <br />10 GNMWk 0"PACTOR $MALL. VISIT SITE AD FAMILIARIZE HIMSELF OF <br />ALL EXIST IMM CONDITIONSPItlOR TO SUB ITI'm H6 BID. <br />W GENERAL CONTRACTOR SMALL PROTECT ALL EXISTING FACILITIES TO <br />REMAIN UNLESS NDTW OTHERWISE, CONTRACTOR SHALL PAIR OR <br />REPLACE TO T! SATISFACTION OF THE CUM" REPRESENTATIVE ANY <br />EXISTING PACLTTE* THAT ARE DAMAGGO BY THE COTRACTOR'S <br />OPERATIONS. <br />0. ALL EXCAVATIONS *HALL = PERFORMED N COMPLIANCE WITH OIWA AND <br />STATE RIOLATIOI& THE CONTRACTOR IS 1101119411100 TO THE 0614 <br />15001G.ET, 'EXCAVATING AD TREMCNINS OPERATIOND•, FOR A SAFE WON: <br />PRACTICES GUIDE FOR PERPOINING EXCAVATION WOW <br />IL UPON OF PROJECT. CONTRACTOR SMALL PROVIDE DIRER WITH <br />A6 0U Lr DWAIUMS OF ALL IT" INSTALLED BY SAME. 'AA* MILTS' <br />SMALL BE COMPLETED ON-SITE WITH NRORBNATKJN NOTED DIRECTLY ON <br />AFPIWVM JOB COPY. <br />K CONTRACTOR SMALL PROVIDE A LMT OF SUB -CC TRACYORRS. IF ANY, WHO <br />WILL L ME USED ON TME PROAICT. <br />0 CONTRACTOR SMALL. COORDINATE ALL N&PECTIONM AND APPROVALS AID <br />CISTAINI AT THE co P rno N OF THE PRGUECT, ALL COR11MICAT11011 <br />REGUIRED TO NRN4 THE FACILITY. <br />16 GOVERNING CODES AND STANDARDS INgJIDE. BUT SMALL NOT RE LIMITED <br />TO, TME STANDARDS OF THE POLLCW4Gn <br />AMMCAN MOTIONAL STANDARDS, 6l6T7UTE (AB) <br />AMINVINGAN PE7ROL.EUM INSTITUTE (AM) <br />SOCIETY FOR 7RETNG AND MATERIALS (ASTM) <br />UNMO N MU.DNG CODE (UBC) <br />NATIONAL ELB=W 0=2 (AEC) <br />AAAA._ NATIONAL PRIM PROTECTION AGENCY (NPPA) <br />LABORATORIES, NC (UL) <br />CODE OF RBOiLA?J" (CCWR) <br />LOCAL <br />n. SAFET OR BbLIL6 D@YOP IND MAMA- PCR THE <br />DUWTCN CAd1'R 1GT. A 817E 1#ALTH 1 S•IY@TY' PLAN THAT rL <br />ETLCTVELr TE AND IFI°LEMENTT PISGUIRED swwm <br />AND, <br />A, APPOINT AN AS THE SAPETY ORCER WHO 16 QUALIFIED <br />AFD AUTHOR MID TO SURIWAE AND ENFORCE COMPLIANCE WITH THE <br />HEALTH AND SAPETY PLAN, SUBMIT THE NAME AND QUALPK.ATIONS O <br />THE 6-ORTY' ORiCER TO THE OWER% AGENT PRIOR TO WOW <br />ON THE SITE. <br />d THE PLAN SHALL CONTAIN THE MAIM ADDPESE6 AND TELEPHONE <br />NUMISERD OF THE allMh GORY PERSONNEL. L. TOE HOSPITAL PACW.IT1116 <br />NEAREST THE SITE, AND A MAP TO THE HOSPITAL. FIROCEDURES SHALL SRR <br />W fr?EN N TAE PLAN POR ACTIONS TO BE TAME! SHOULD STRANGE ODORS <br />OR HAZARDOUS SUBSTANCES an UNCOVERED. <br />G, P C&ANNS THE COURSE CP THE WOW UNSAFE CONDITIONX DEVELOP <br />OR AAE TANS "MEDIATE PR AA6URRE6 TO CORRECT THE <br />CONDITION. IF TOE CORRAECTVE ACTION 16 MUFRCIE4T N THE <br />OPINION OF THE OWNERS AGENT, CONSTRUCTION WORK. SHALL CEASE WTL <br />CCCTN2 ACTION CAN ISE 11PLEMENTED. <br />D, PROADE A MINWIUM OF TWO FRE RS WITH A MNI I M <br />CLASS RATING O 2•A,20-04 WITHIN SO FEET OF THE OPERATIO1 <br />10. UNDEMPROU110 SERVICE ALERT (USA.) - THE CONTRACTOR SHALL NOTIFY <br />OF USA. 2 PLL WORKING DAYS N ADVANCE CP PERPORIM <br />ANY Z-,CAVATCH WOW BY CALLING THE TOLL-FREE CHE-CALL PROGRAM <br />NUMBER (000) 221-2600. <br />t PRIOR TO THE START OF WOIK PROVIDE OWNER WITH SOW PLAN AND <br />SCHEDULE THAT ALLOWS THE 6172'6 STORE TO REMAIN OPEN TO THE <br />FULLEST ffillHT POSSIBLE <br />2. M04M OR WOK AREA WITH O'HIGH CHAIN LINK RICE. POST 'AMP <br />OUT" SIGNS ON PENCE EVERT 30 REL AT THE END OF EACH WORK DAY <br />SECURE FENCING PANELS TOGETHER, <br />3. RANK CUT, AND REMOVE P`RDDUCT LINES PROM EXISTING TANKS TO <br />DISPONSEP11 I66.AN06. <br />4. COVE ALL C467M RUE. DISPENSERS ISLATD9 BARRICADES FAL <br />LSE6 CANOPY, ASPHALT AND CONCRETE SOUFACE6 AS REGNIRM, N <br />PREPARATION FOR INSTALLATION OF PSI AS SHOWN ON DRAWN". ANY <br />SALVAGEABLE TO BE REM01,W PROM SITE AS DIRECTED BY <br />OVER PMPIWAESENTATPlL <br />S. PREPARE FOR REMOfAL AND fO4OVE "TM UNDOWARCUND REI. <br />(GA80LI E) STORAGE TANKS (USTPI N ACCORDANCE WITH THE <br />UNPEROMAND TANG CLOGUY41 PLAN. ODER WILL M -PT" TAKO OF <br />REUSABLE PRODUCT. GENERAL CONTRACTOR TO PROVIDE POR DRY ICE TO <br />PURGE TANKS, Off HW LESS THAN B LOG. PER 1000 GALLONS CAPACITY. <br />i. CONTRACTOR SMALL PROVIDE FOR CLEABNs AS NECESSARY, <br />TRANSPORTATION, DISPOSAL OF TANCB. AND RNSATE N ACCORDANCE PER <br />COUNTY REOdLA.TIONS BY AP IRO/ED HAULER CUrrM TACO ON 617E b <br />NOT AILLCWED. <br />1. OWNER WILL CONTRACT WITH AND FUNbN CONSULTANTS TO PERPOR'1 SOU. <br />AND/OR WATER TESTING UPON TAMC 4 PIPING RE"DVAL N ACCORDANCE <br />WITH TAMC CLOSURE PLAN AND LOCAL REGLAnOFb. (ALLOW TUENTY'-PONR <br />HOLM ROPE RESULTS OF SOIL SAUPLEW <br />S CONTRACTOR SHALL PLACE EXCAVATED SOL ON AND STALL COYMR WITH 4 <br />ML. PLASTIC UNTIL 801 IS SOL TO ISE 6TOCKPILED ON <br />SITE FOR &AMMNG PRIOR TO OP -HAUL BY OTHERS A6 DIRECTED BY <br />oulm <br />S OWER SMALL PROVIDE FOR TRANSPORTATION AND DISPOSAL OF ALL <br />EXCAVATED SOIL AFTER OCMAPIJMCN OF ANY HISO906ANY IE'7EDIATCN6 <br />INCLUDING ,AERATION, <br />10. F IEOUIIED, SACCPLL THE A.BANDOFED TANG HOLE OHIO ALL S/MPLNG <br />AND/OR OVER -EXCAVATION 16 COMPLETED. BAGaILL MMT BE ENGINEERED <br />PILL COMPACTED TO 15. THE CONTRACTOR b RESPONSIBLE FOR <br />GEt1IFY'NG THE CCMPACTCNL A THIRD PARTY ENGINEER MAY WTN M <br />THE PROCESS, AND CERTIFY TWAT TAE HOLE WAS COMPACTED PRoMMY TO <br />WITHIN 4 FET OF SUIF,4CE. OLE M TET WALL THEN BE PEGUIED AT <br />4' AND Y AND 0, FOR A TOTAL OF rAPME (3) COMPACTION TESTS, <br />PROVE RESULTS TO OWER'S ATNE. <br />W CONTRACTOR TO INSTAL NEW CANOPY POOfHM PER PLATS, <br />SPECIFICATION& AND SHOP DRAW FM AND ARRANGE FOR ALL <br />W46PECTOb. PROVIDE CONDUITS FOR LICANTNG AND INTERCOM AFD <br />COORDINATE RAN LEADERS AS NECESSARY. <br />It CONTRACTOR SMALL PLACE SOL PRO! M FOOTING EXCAVATION CK AND SMALL <br />COVER WITH, 4 FML. PLASTIC UNTIL SOI. 18 I'EM VEDA SOIL TO 91B <br />STOC10" M AND SEGROMATED ON SITE FOR SAMPLING, PRIOR TO CPP-MAUL <br />by OTHERS AS, DIRECTED BY Comm <br />M. CONTRACTOR TO 60810" ARD A RRAPNG2 CANOPY WORK PER DRAMING6 AND <br />SPECIFCATIO & ACTOR SNOUT D M PRESENT TO C40MINATE <br />INTERCOM, DRAINAGE <br />14. EXCAVATE A6 NECESSARY FOR THE INSTALLATION OF FOOK.ACEMDff TANKS. <br />0. CONTRACTOR SMALL COVE! EXCAVATED SOL WITH 4 ML PLASTIC IMI. <br />SOL is R111MOVED. SOL TO BE STOpOMLED AFD TED ON 617E <br />FOR SAMPLING PRIOR TO OR -HAUL AS DIRECTED BY <br />INSTALL " tYPAR' PI.TER PABIRSC LINER N TAMC NOLLE AND TRENCHES MR <br />BY UNT44OU CONDITIONS NS. IMROVDE TANK <br />MOLD -DC" AS 111501.11110110 BY MANUFACTURER N WET -MOLE COMMON & <br />R PNBTALLL 2 - 2000 GALLON TAM M PER CRAWdM AND CURRENT <br />M~ NSTRRCTIOd6, UA41CW SMALL RE FOLLOWED AT ALL <br />TIMES AND SHALL MAVE PRECEDENCE OVM OTHER INMTRUCTIONb. <br />MANUPACTURIM CHECIU.1675 SMALL RE COMPLETED BY THE CONTRACTOR <br />AS EACH STEP b OOMPLETED TANG BEDDING AND BACKPILL TO BE PEA <br />GRAVEL. TAK BURY 16 TO RE MA" IM 4 FEET, TANG MOM b TO BE <br />A MINIMUM 12', *PACING BETWEEN TAI," 16 TO Off A M095M OF W. <br />TANK INTEGRITY TESTING SMALL CO-PORMI TO 1'N9lb. <br />10- WALL EQ11RIENT AAD LISTED N EaAPMENT LMT INCLUDING <br />SALY-MAAR EQUIPMENT TO RE REOMTALLED. IF ANY, AD PROVIDE AND <br />INSTALL ALL OTIE! ,A8 ROMPIED TO PROVIDE A COMPLEIZ <br />PETROLEUM SYSTEM. <br />ffi PROVIDE AND INSTAL NO PRCOHCT. VENT VAPOR AD SECONDARY <br />CCWA#4*UW LINES PER DRA RUMS, CURRENT MANUFACTURE" <br />SMALL BE POLLOGIRD AT AUL TIMESAD MALL MOVE <br />PRECEDENCE OVEROTHER INSTRUCTIONS -LAFMAGTUERS GISCIMIS" <br />SMALL RE O PL£TWD BY THE CONTRACTOR AS EACH STEP b COMPLETED. <br />A: PRODUCT PPIHM, 2- P -1ARY RPM WITH 3' CONTAIN PO NT <br />SYSTEM .AS APPROVED, BY OWER ALL RPM AD CCNNTAIrW f SYSTE"0 <br />MALL BE UL APPROVED POR W% METHANOL CONTADMENT SYSTEM SHALL <br />BE BY THE SAME MAN;PACTURM WITH THE &APE SERIES ADHESIVES, <br />ANDroR PITTINGS <br />IS, VIINT VAPOR PIPING, RED THEAAP IW AND RED THREAD If WITH <br />FITTINGS AMID woo AND sow 8dRE8 ADNESIVE, on AMERON DUALOY <br />3COOL WITH ALLCOHWL PITTNG6 AFD RP4* ADHESIVE. DO NOT MIX <br />M.WJF MATERRAM <br />G PERSONS IN6TALLNG PIPING MUST On CERTIFEO A$ HAVING BEEN <br />TRAAIED BY MAI'LPAC URER <br />O STEEL PIPE, ALL METAL PIPING SHALL BE 94-J" IRON SCHEDULE <br />40, OR EXTRA STe7NG. GALVANIZED PIPE 16 NOT ALLOWED. FITTINGS, <br />SMALL Be 300 PSI MALLEABLE IRCK <br />It, ALL STEEL PIPE IOLCW GRADE b TO BE DOUBLE WRAPPED WITH 20 <br />UL PIC PIPE WRAP, OVER A PIPE WRUP PRIMER POR USE WITH VINYL <br />TAPES. AMC- SHALL B9 BY THE 84-10 MAMtACTUIER AS THE WRAP. <br />P, ALL rAREADW 0OHECTIONS SHALL BE THREADED WITH 69AL-INT <br />WHICH SMALL M CURRENTLY WARRANTED BY MANUFACTURER FOR FULL. <br />COMPATIBILITY WITH THE PIPING MATERIAL USED, AHD FOR IME WITH <br />PETROLEUM 8MANTS, FUELS, OILS, DIESEL, AND 10(30 METHANOL. 041CH <br />SMALL BE VERIFIED BY CURRENT 143N111FALTJER'S PRODUCT DATA SHEET. <br />& GC SMALL DEMONSTRATE TO MMR* REPRIVIGHTATNE THAT ALL <br />MATERIALS ARE NEW AND COHPORM TO ABOVE SPECWCATION& <br />20. DO NOT PLACE PRODUCT PIPING UNDER BULDNGB. PIPING RUM OVER <br />TANKS SHALL DE-RNIMIZED. MAINTAIN MINIPIU "I CLEARANCE AS SHOWN ON <br />MINIMIZE CROSSING OTHER LINES AND CONDUIT. IF PIPING <br />b NWT BMCWN ON SITE PLAN, G.C. SMALL RUN LINES THE MOST DCCT <br />ROUTS SIAGJEC'T TO APPROVAL BY Y3 REMEBENTATKS <br />2L E46TNG'A947 RISGIRS ARE SMOW4 ON 107E PLAN. INSTALL NEW SWING <br />JOINTS AT BOTTOM OF VENT man <br />22. RPC,t'a Sr8TE9S SMALL M TESTED PER CURRENT MANUFACTURE" <br />t*TRP:710N8 SMALL BE FOLLOWED AT ALL T'ES. AND SHALL HAVE <br />rotscomca OVER OTHER NBTRLCTONB. <br />A, GC TO NOTPY CUM" PEPRMWATIVr. TUFO WOWING DAYS PRIOR <br />TO LIFE TESTING. OWER'S REPRESENTATIVE SMALL WITS" ALL LINE <br />TBOTNG MARC TEST PMOSURISS, ON GAUGE WITH ELECTRICAL TAPE AT <br />BOOMING OF TESTS. PRESSURE SMALL HOLO FOR AT LEAST ONE () <br />HNAN AND DE WITHEISSIMP BY OWNER'S REPRESENTATIVE. DO NOT BAgOgLL <br />UNTIL AUMO RZED BY OW 10" REPIWAGNTATNE. <br />B TEST PPIMSOUFNIS SHALT. ME, <br />r - 50 PSS AND APPLY SOAP SOLUTION. <br />3' - 40 PSI AND APPLY SOAP 6CLUTICK <br />3' - SECONDARY - S PSI AND APPLY SOAP SOLUTION. <br />C CAUTION, 0WCONAECT FLEX OONIECTOR PROM STP AND CAP PROM <br />TO TUSTING. APPLY 4 RELEASE PRE"AM SLOWLY. VENTNAPOR SYSTEM <br />911 ILL Be TESTED PROM TOP OF VENT, THROUGH MANPOLD(8), EXTRACTOR <br />BASE AND RISER STAGE I CONTAIM'E4T MANNOLP.3, STAGE R VAPOR <br />LINES TO ISLANDS AND STAGS II FLEX CONNECTORS, AT DWWOMSA <br />D. SLOWLY PRESSURIZE PRODUCT LINES AND VENTNAOR SYSTEM TO 50 <br />116E SOAP ENTIRE WIPE SU44ACE8 NMUDNG JOINT& AFD RTTM G <br />CORRECT ANY LEAKS AFD MMT. <br />S SLOWLY RELIEVE P00180URS S PROM VAPOWVENT SYSTEM AFD REMOVE <br />PLUG PROM EACH EXTRACTOR AFTER TOT RWCUCE PRODUCT LINE <br />PRESSURE TO 9 Pd. MONITOR DAILY UNTIL ALL YARD PAVING 16 <br />P. SECONDARY PIPE MEAT BE PROPEPo-Y CUT INSPECT ALL PRIMARY <br />PIPE SURFACES, PRESSURIZE SECONDARY PIPE TO S IPM AND SOAP ALL <br />PIPE SUOPACE AFD FITTNI'G8. PPSMM ON THE RPM SECONDARY <br />SP.ACE *HALL BE MAINTAINED UNTIL AFTER THE PAVING 16 N PLACE OVER <br />TAC MO AFD PIPING RUNS, AFD SHALL BE WITNESSED BY THE OWER'6 <br />VAU"VZSIWATNX <br />G ARM IWM WTNESSED BY OWEWO REPRESENTATIVE, REMOVE <br />PRESSURE ARCM PRODUCT LINES AND AIR PROM SECONDARY LINES AFTER <br />PAv&G b N PLACE <br />23. GC SMALL PZPFORM PRECISION TEST ON PRODUCT LINES AFTER PAVING <br />b COMPLETE AFD PRIOR TO FINAL PROJECT ACCEPTANCE. PRECISION <br />LRE TEST 04ALL BE N ACCORDANCE WITH LAPPA 32% LOCA. <br />E OR APPft7VEP EQUAL. TEAT 894" BE CONDUCTED, BY A <br />CEPITPED 7E415TER GG. SMALL PROVIDE WRITTEN REPORT OF PMCI8WN <br />TEST TO ATIVE PRIOR TO OWNER'S ACCEPTANCE OF <br />PRO.EG7 <br />24. CONTRACTOR SMALL PROVIDE DOCUMENTATION OF A DYNAMIC <br />TEST OF ALL VAPOR RETURN LINES AS REC IRED BY LOCAL REGULATIONS <br />25. =MRACTOR SMALL DO ANY OBER TESTING AS RECURRED BY LOCAL <br />REOULATIONS. <br />26. CO STRICT NMR RAL ISLANDS A& SHOWN ON DRAWINGS. <br />2% 9RA1/O BOXES?URGING SUMPS, AFD OVERFILL BOXES ARE TO BE <br />COMPLETELY SEALED AND WATER TESTED, AS EVIDENCED BY 0"" <br />REFIRBSEWAT" AS POLLOU6, <br />L RLL WITH WATER TO HIGHEST PENETRATION, <br />2. SPRAY PANT TOP OF WATER <br />28, PROVIDE AND INSTALL CONDUIT 4 RARING POR PETROLWM S"TEMK6) AFD <br />CAIOPY LGNTRdG PROVIDE COMMIT FOR FUT RE CARDREADEft AND <br />OTHER SITE ELECTRICAL AS INDICATED ON THE <br />25. ALL CODUT b TO RE 3/4• (MN"" RGID OODUT. <br />30. INSTALL MON11TORIM SYSTEM WITH HYDROSTATIC PROSES, TURBINE BUMP <br />PIWMO. AND TAM GAGE. AND MONITOR COFIRROL PA FL N BUILDING PER <br />3L INSTALL REM GILAARDO MPDS, SINGLE -HOE DISPENSERS, AD CCH 90.E <br />AS INDICATED ON SITE PLAN AFD DESCRIBED N THE ECJUIPPM°NT LIST. <br />31 INSTAL SITE LGHTINCG, IF APPICABLE, AFD/CR ANY 074-M ITE% AN SHOWN <br />0171E . <br />33. INSTALL NEW CONCRETE TAW AND DRIVE SLABS AHD OTHER CONCRETE AS <br />INDICATED ON SITE PLAN. CONE SHALL HAVE A MNK" <br />STRBJGTN AT 20 DAYS OF 2500 PSL CONCRETE SMALL <br />CONTAIN 0 P'CU406 OF LAM PBLAAC PER OUBC YARD - USE DAVIS 00" <br />34 REPAIR AND/OR REPLACE AC. PAVING AND BABE TO MATCH ORIGNA. N <br />AREAS COTNRgNM BY WgOC <br />30 ANY ENVIRONMENTAL WOW REWIRED OUTSIDE THE AD" SCOPE OF WORK <br />SHALL BE DONE ON A TIME Ab MATERIALS B4615. RENTAL RECEIPTS <br />MATERIAL RECEIPTS AID DAILY LABOR TIME <br />MEETS MOLL. BE NOMNED TO SU -PORT GBS CONTIRACTOR TIME AND <br />MATERIAL MIDIQS SUCH WORK ON ALL RE BILLED SEPARATELY. <br />VIONORGIROUM TANK PLAN <br />tO GENERAL NPORM4TKK4 <br />U LOCATION OF TANKS+ QUAL STOP 98 <br />1198 W. LOUIE AVE. <br />MATECA CA W336 <br />(205) 235-2101 <br />12 OU41M CURL STOP MARKETS, INC. <br />PO. BOX 8145 <br />FREMONT, CA 54931 <br />(614'!) LD1 -8000 <br />13 PROJECTED PRGLECT START, * MAR W <br />IA TANKS, 3 61401. WALL PI AE, BY XER/E8 <br />NUMBER GAI -" MATEOtlAL PRODUCT <br />2 10000 FAIR UNLILAVED GASOLINE <br />I SOW FPR UNLEADED GASOLINE <br />19 HISTORY', INSTALLED 1584 <br />10 CONTRACTOR.". <br />GENERAL, TO BE DETERMINED <br />PRODUCT REMOVAL, CUK STOP MAMVETS, INC, <br />DOTTCAMb RLMb/AL: TO BE DETERMINED <br />TANK HAULER. TO BE DETERMINED <br />GEOLOGIST COMPLIANCE 4 CLOSURE <br />TANK DISPOSAL PAACII-rM TO ISE DETERMINED, <br />10 CLOSURE PROCEDURE-IR?3NOVAL OF TANKS <br />SAN JOA UN COUNTY E A ONMBNTAL HEALTH OKIO10 4 TAMC <br />CLOSURE GUIDELNES AHD SOIL AND GROUNDWATER SAMPLING <br />GUIDELINES SMALL BE FOLLOWED, EXCEPT WHERE 714E FOLLOU14S <br />SPECIFICATt" ARE MO.ALP RESTRICT". <br />PURGE ALL VAPORS PROM TAKS WITH A MINIUM OF THIRTY (30) <br />PCU C06 OF SOLID CARBON OtOXDE (DRY CE) FOR EACH IOW (SALONS <br />OF TANK CAPACITY AND PRESENT 64LM SLIPS TO INSPECTOR <br />PELLETIZED DRY ICE M CAP ALL OPENINGS EXCEPT <br />VENT PIPE AND ALLOW TWO HOUR M INKM AND SIX MOUE MAXSAM FOR <br />OXYGEN DISPLACEMENT APTEt PUTTING CARDCN! DIOXIDE INTO THE <br />TANKS. 'AM PIPE OPENING TO BE CHECKED WITH A C M"TBLE GAS <br />DETECTOR TO DETERMINE IF TANG 16 VAPOR I OR IF ADDITIONAL <br />DRY ICE ANDIOR TIME MAY BE REQUIRED. <br />PLUG OR CAF ALL TANK OPENINGS LEAVING AN VS' - V4• PRESSURE <br />RELY MOLE N ONE CAP AT THE TOP OF THE TAMC <br />VISUALLY INSPECT THE TANKS UPON REMOVAL. ALL E K7EORAAL TANK <br />SURFACES, AND PITTINGS SMALL GO INSPECTED FOR EVIDENCE OF HOLES <br />OR LEAKAOIL THE RESULTS OF SUCH INSPECTION SMALL BE <br />DOCUMENTED N WRITING, WITH PHOTOGRAPHS WHERE APPROPRIATE. <br />PATCH ANY HOLES WITH APMW'Y D MATERIAL BEFORE TRA SFORTNG <br />TA ICS TO DIU-o6AL SITE. <br />TWO SOIL SAMPLES SMALL BE ANALYZED PROM BENEATH THE TAMC ONE <br />FROM DIPECTLY BENEATH THE FILL IMPEL THE OTHER PROM A SIMILAR <br />P061TIO4 AT THE OPPOSTE END OF THE TAM -L IF OBVIOUSLY STONED <br />OR CONTAMINATED APWEA6 EXIST N LOCATIONS OTHER THAN THE ABOVE <br />LOCATIONS, THEN ADDITIONAL SOIL SAM11PLE6 SMALL BE ANALYZED PROM <br />THESE OBVIOUSLY STARED OR CONTAMINATED AREAS, <br />SOIL SA'PLEA, SMALL BE COLLECTED PROM THE NATIVE SOIL AT OR <br />JUST BELLOW THE INTEPIPACE OF THE BACKPLL WITH THE NATIVE SOL <br />swimpLaof SHALL BE TARN USING A DPRVE4-TBE TYPE SAMPLER <br />CAPPED AND SEALED WITH NERf MATERIALS PORTAL BMGFED CAAN- <br />OF-CUSTODY RECORDS SMALL 02 MAINTAINED FOR EACH SAMPLE AND <br />SUBMITTED WITH 71$ RESULTS TO THE FEW" AATNG ,4004CY. <br />TO EXPECTE THE PROCESS OF TANK REMOVAL, THE POLLOUM43 <br />ALTERNATIVE &JMPLNG METHOD MAY BE USED, <br />A. I4'IMPATELY UPON REMOVAL OF THE TAMC A 06ACKHM BUCKET OF <br />MAINE SOL SMALL BE TAKEN PROM THE NATIVE SOW. TWO M FEET <br />DMAXU THE SOLOACIO-11.1. INTERFACE. THIS SOIL SMALL 9E RAPIDLY <br />BROUGHT TO THE SLWACM <br />D. APPI1152XIMATELY TFtWEE INCHES SMALL ISE RAPIDLY SCRAPED AWAY <br />PROM THE &MACE OF THIS SOL. THEN A GLEAN BRADS T)ECF (AT <br />LEAST THEE NOES LONG) SMALL 9E DRIVEN INTO THE SOL WITH A <br />SUITABLE INS(WOODEN MALLET. ETCJ. <br />C. THE ENDS OF MASS, TUBE HALL BE COVERED WITH ALU INUM FOIL <br />THEN PLASTIC ED CAPS, AD FINALLY WRAY-fl8D WITH A SUITABLE <br />TATE. <br />D. THE SAMPLE SHA" RE "MEDIATELY PLACED ON ICA, OR DRY I, <br />FOR TO A LABORATORY. ALAN, POP94AL CHAIN-OF-UMTODY <br />SMALL RE MAINTAINED AND SUBMITTED FOR EACH 6A IPIAL <br />IF THE BOTTOM OF M TAC M BELOW THE GROUNDWATER TABLE, ?MGM <br />SOIL APE NOT 1115=111112D N THIS CAS, A WATER SAMPLE <br />SMALL 210 COLLECTED AS SOON AS POSSBLE FROM THE SURFACE OF <br />THE GOMDW40MTER N THE EXCAVATION, A CHECK SMALL INITIALLY 9E <br />MADE FOR ANY FEE FLOATING, PRODUCT. IF NW PLOATG PRODUCT b <br />THBR A WATER SAMPLE SHALL 9E TAKEN WITH A DEVICE <br />DESIGNED TO FISIDUCE THE 1.088 OF VOLATILE COMPONIINTS A GALAN <br />M A SUITABLE *A'PL.NG DEVICE. THE WATER &AMPLE *MALL = <br />"MMMTELY P'O RED INTO A VOLATILE 0103A IC AMALYSM (VOW VIAL <br />WITH A& LITTLE AWATWN AS POWISLIL A TEFLON SEPTUM &MOL of <br />IBED TO EAP. THS PAL. <br />FOR TorAL <br />HYD AND WATER B Y 71.6 METHODS OUTLINEAL,D <br />IN 'GUIMNE6 ROPE <br />PtEL LEAKSCALIFORNIA REGIONAL WATER CLALITY <br />CONTROL BOAR, SAN FRANCISCO BAY REGCN - SEPTEMBER ADO.• <br />LOAD TAKE ON NOWAY CARRIER WITH PRESSURE RELIEF MOLE UP ON <br />SAME DAY A* RE`W VAL UALES! THE TANKS HAVE MM TRIPLE MOM, <br />THE CARRIER MMT BE A LICENSED WASTE HATER APD MANIFESTS <br />UNIT ACCOMPANY THE TANKS. <br />30 REMOVAL OF PVIM <br />PPM TO BE 119HOIYW SMALL Be EMPTIED OF ALL CONTENTS PI10(7R TO <br />REMOVAL RPM SMALL BE STOCOMAD CN -SITE PRIM TO DISPOSAL <br />VISUALLY INSPECT PPE TRENCH FOR INDICATION OF LEAKAGE. A S71 <br />SAMPLE MALL BE TAKE4 AD ANNALY MW POR EACH T40CY LINEAL <br />PONT OF TIM404 IF INSPECTION CP TENCH REVEALS EVIDENCE OF <br />FOLLOW PROCEDURE LISTED N SECTION V FOR SAM -LNG <br />AD ANALYSIS <br />QUIK (. <br />121 <br />119& W. LOUISE AVE. <br />MANTECA, CA 95336 <br />(209) 239-2951 <br />SAN JOAQUIN COUNTY <br />AF'N 211-410-43 <br />ALTON <br />IWW MM NGNEERNG, INC. <br />P.O. BOX X25 <br />843 LAME <br />WEST GACRArMTO, CA 92-691 <br />(916) 312-1888 <br />PAX 313-1112 <br />7mm ORNM:98 AO ,M <br />mpmmn Osoma Pw%1-0E <br />,WO M+LL !GT M tH� RFL# A8' PIAYPPM <br />07110! MM 7HI0(i fgtN8L1 THEY 11Av0 <br />N1�I d q! *KE UTAFWIIA4 <br />WHLL IU0766 AOR TOS <br />UTNdl7 M ID?hM CmNIM Q <br />RdLTCHI IC. <br />COPYRIGHT ® 1997 <br />r, Fwv*ICW <br />DATE iREV PPIOI 15 <br />2 X3.981 1 NEW USTP, LIGHTS WE <br />i <br />I <br />I <br />/� <br />SWEET TITLE+ <br />GEN. MOTES, <br />SCOPEs <br />CLOSURE <br />r --1 <br />T <br />OF: 1 SHEETS <br />