Laserfiche WebLink
UST SYSTEM DRAWING INFORMATION • <br />1. Three complete sets of plans (include manufacturer's specification sheets for proposed equipment to be installed). <br />2. Plans drawn to scale in non -erasable print. <br />3. Plot plan to show Location of tanks and all associated piping. <br />4. Striker plates or drop tube -mounted bottom protectors illustrated below all accessible openings. <br />5. Tank cross-sectional diagram. <br />6. Detail of tank, associated piping, excavation and cover. <br />7. Tank(s) and piping approved by a nationally recognized independent testing organization. [Title 23, Chapter 16, <br />Article 3, Section 2631 (b) & 26351 <br />g, verification of product compatibility with the tank(s), piping, monitoring <br />device(s), epoxy or silicone glues, etc. <br />9. Manufacturer's written installation instructions for tank(s), piping, monitoring devices, etc. <br />10. At the installation site, prior to installation, a tightness test shall be performed on both primary (10) and <br />secondary (20) containment systems before covering. [Section 2635 (a) (3) & (4)] <br />11. Tank integrity test required upon completion of installation with tank in operating condition. Test results to be <br />submitted directly to PHS-EHD from the testing company or owner of facility. [Health & Safety Code, Division 20, <br />Chapter 6.7, Section 25291 (h)] <br />v Itv.�LX TTTf <br />TANK # I Z I <br /># <br /># Z <br /># <br /># <br /># <br />CAPACITY /N C-PALLon)S <br />D 000 <br />IO OOtb <br />8 DOO <br />(2) <br />MANUFACTURER <br />Aelex,ES <br />X -XIS <br />B. <br />Fiberglass <br />COMPOSITION <br />S•W• F,R,P. <br />(1) <br />Installation instructions require an air test and soap bubble test prior to installation. <br />(2) <br />vacuum applied to interstitial space. <br />MODEL <br />_ (3) <br />Hydrostatic annular (primary tank pressure test). <br />C. <br />Non -clad steel <br />tank [Section 2635 (a) (2) (A)] <br />PRODUCT <br />KC& VA/ L. <br />M (19• ()lk(,,. <br />!9VP, if IAC.. <br />etc.). <br />CORROSION PROTECTION <br />Field installed cathodic protection systems designed and certified as adequate by a <br />IBES <br />YE -'S <br />corrosion specialist. <br />U.L. LISTED <br />\Y <br />TES <br />7 ES <br />YES <br />COMPATIBILITY WITH 100%. <br />METHANOL <br />13. TANK(s) <br />akI571oc-A <br />A. <br />Steel -clad with <br />fiberglass reinforced plastic coatings, composites, or equivalent non-metallic exterior <br />_ <br />coatings or coverings. <br />(1) <br />Tested at the installation site using an electric resistance holiday detector. <br />(2) <br />Vacuum applied to interstitial space. <br />_ <br />B. <br />Fiberglass <br />(1) <br />Installation instructions require an air test and soap bubble test prior to installation. <br />(2) <br />vacuum applied to interstitial space. <br />_ (3) <br />Hydrostatic annular (primary tank pressure test). <br />C. <br />Non -clad steel <br />tank [Section 2635 (a) (2) (A)] <br />(1) <br />Cathodic protection provided for entire tank, piping and components (nuts, bolts, washers, <br />etc.). <br />(2) <br />Field installed cathodic protection systems designed and certified as adequate by a <br />_ <br />corrosion specialist. <br />_ (3) <br />Impressed current systems to be inspected no less than every 60 days. <br />5 <br />