My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2003-2005
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LOUISE
>
1196
>
2300 - Underground Storage Tank Program
>
PR0231430
>
COMPLIANCE INFO_2003-2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/2/2024 12:38:04 PM
Creation date
6/23/2020 6:48:32 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2003-2005
RECORD_ID
PR0231430
PE
2361
FACILITY_ID
FA0000848
FACILITY_NAME
QUIK STOP MARKET #2121
STREET_NUMBER
1196
Direction
W
STREET_NAME
LOUISE
STREET_TYPE
AVE
City
MANTECA
Zip
95336
APN
217-410-43
CURRENT_STATUS
01
SITE_LOCATION
1196 W LOUISE AVE
P_LOCATION
04
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231430_1196 W LOUISE_2003-2005.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
440
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BACKFILL EXCAVATION CERTIFICATE <br />l ( � uJb-� LD c1 15 E � �' it -,01 <br />Project Location t�S IAC phone No. <br />Owner <br />MOW- 5 °P License No. dol9- Z3�' <br />Contractor UW�'�� 61' <br />Phone No. (�f 16� ?3" 1168 <br />INDICATE METHOD OF BACKFILL- QUALITY ASSURANCE <br />eCL Completion, Or <br />1. Submission of Soil Engineer's Compaction Report within 30 days of proj materials was <br />—/ load ticket, within 30 days of project completion that one of the following <br />✓ 2. Submission of verification, e.g., <br />placed in the excavation in 12" lifts:inch in diameter <br />V/ A. Pea ;ravel <br />_--smooth, rounded material not more than one-half (1/2) inch in cross sectional <br />uarters (3/4) the <br />B. Crushed rock -self -compacting mwill aterial not more than or ba Q <br />e °fpoly <br />of resin glass or similar materials.) <br />k not permitted for bac <br />measurement. (Use of crushed rockfill if contact will be made between <br />backfill material and mnks/pipes mad P <br />DECLARATION <br />d at a minimum of flue (5) cubic yards per 1000 gallontank <br />Engineer's Compaction Report will be submitted within 30 da s of project completion, Or B ildtng °II of <br />ode <br />1 hereby certify that a Soil <br />d that the entire excavation will be backfilled and compacted to insure compliance with the <br />verification that the select material described above will be place <br />displacement an <br />Appendix Chapter 70. <br />* M1KE SEE 14.t.A <br />ame ( rtnt <br />* A Dz, N1ib✓f4------------ <br />pez- <br />t e ( t) <br />I� <br />ignature <br />* Shall be the responsible managing employee on the license or authorized agent. <br />
The URL can be used to link to this page
Your browser does not support the video tag.