Laserfiche WebLink
f <br />ONCE A YEAR, WE R MMEND GREASING THE <br />SNAP -TIGHT ZERK FITTING WITH ONE OF THE <br />FOLLOWING PRODUCTS, <br />TEXACO STARFAK LOW TEMP GREASE EP <br />SHELL AEROSHELL GREASE 7 <br />EXXON UNIREX N2 OR NEBULA EP <br />CATO MULTIPURPOSE LOW TEMP <br />g <br />MANUFACTURING <br />INSTALLATION INSTRUCTIONS <br />FDR ALL CONTAINMENT BC�xF� <br />WITH IN-LINE DRAIN FLAT <br />1) REMOVE S/S COMPRESSI❑N RING O, <br />2) TAKE THE TWO FLANGES Z) AND SCREW <br />THEM ON TO THE RISERS. MAKE SURE THAT <br />THE OVAL FLANGE IS APPROXIMATELY 30 <br />DEGREES OFFSET, THE ROUND FLANGE HAS <br />6 INDENTED LINES AND THE OVAL FLANGE <br />HAS ONE INDENTED LINE BY THE DRAIN HOLE. <br />INSTALL THE ROUND FLANGE ON ONE OF THE <br />RISERS, MAKING SURE THAT IT IS TIGHT, THEN <br />INSTALL THE OVAL FLANGE ON THE OTHER RISER, <br />MAKING SURE THAT YOU LEAVE IT AT AN ANGLE. <br />BY SETTING A STRAIGHT EDGE FROM ONE FLANGE <br />TO THE OTHER, USING THE INDENTED LINES, YOU WILL <br />BE ABLE TO SET IT PERFECTLY IN LINE. <br />TOP VIEW <br />3) PLACE CONTAINMENT @D AND LAY IT ON TOP OF THE FLANGES (D, MAKE SURE THAT <br />EVERY THREADED HOLE IS EXPOSED. <br />4) PLACE THE TWO COMPRESSION RINGS © AND TIGHTEN, MAKE SURE THAT YOU <br />ALTERNATE BACK AND FORTH To ASSURE AN EVEN SEAL. <br />5) USING TWO PEOPLE, LIFT THE MANHOLE ® AND PLACE OVER THE CONTAINMENT. <br />ALIGN THE MANHOLE OPENING WITH THE CONTAINMENT. USE 4 SHORT PIECES OF <br />2 X 4, OR BRICKS TO LAY UNDER MANHOLE TO KEEP IT PLUMB 1' ABOVE GRADE, <br />6) LIFT THE RUBBER BELLOWS INSERT INTO THE GROOVE ON THE SNAPTITE RING - SET <br />S/S RING QA AND TIGHTEN. <br />15627 ARROW HIGHWAY, IRWINDALE, CA 91706 PH:(818) 962-6646 FAX:(818) 962-4854 <br />