My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2003-2005
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LOUISE
>
1196
>
2300 - Underground Storage Tank Program
>
PR0231430
>
COMPLIANCE INFO_2003-2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/2/2024 12:38:04 PM
Creation date
6/23/2020 6:48:32 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2003-2005
RECORD_ID
PR0231430
PE
2361
FACILITY_ID
FA0000848
FACILITY_NAME
QUIK STOP MARKET #2121
STREET_NUMBER
1196
Direction
W
STREET_NAME
LOUISE
STREET_TYPE
AVE
City
MANTECA
Zip
95336
APN
217-410-43
CURRENT_STATUS
01
SITE_LOCATION
1196 W LOUISE AVE
P_LOCATION
04
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231430_1196 W LOUISE_2003-2005.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
440
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1. - <br />WHEN THE B=200 IS IN POSITSON ON THE ISLAND AND THE DISPENSER IS IN <br />PLACE, THE DISPENSER OR PUMP INLET SHOULD BE PLUMB WITH THE IMPACT <br />VALVE. DETERMINE THE DIMENSION "X" (DIAGRAM 3A) AND CONNECT THE <br />SHEAR VALVE AND UNION WITH A NIPPLE. IF THE VALVE AND INLET DO NOT <br />LINE UPISE OR NEEDSTH3 IMPACT VALVE TO BE ADJUSTED WIDTH -WISE DIRECTIONE LENGTHWISE OR WIDTHWISE <br />I <br />N THE <br />LENGT'HWriW <br />IDTHWISE <br />ADJUSTMENT .0 01 A'_ R AM ?- ��) <br />2. <br />THE SHEAR VALVE MUST BE ADJUSTED VERTICALLY BY LOOSENING THE TWO <br />NUTS AT THE "U{' BOLT ON THE VALVE PLATE (DIAGRAM 3A, NO. 1). <br />NEXT, LOOSEN THE PRIMARY TO SECONDARY SEALING NUT (DIAGRAM 3A, NO. <br />2) USING A CHAIN WRENCH OR OTHER APPLICABLE TOOL. NOW THE ENTIRE <br />IMPACT VALVE ASS--mM .Y IS FREE TO MOVE UP AND DOWN 5/811. <br />3. <br />AFTER THE DISPENSER RISER PIPE IS CONNECTED TO THE IMPACT VALVE, <br />PROCEED IN THE FOLLOWING ORDER: <br />A. TIGHTLY SECt1RE THE SEALING NUT (DIAGRAM 3A, NO. 2) TA_IXING <br />CARE NOT TO OVER -TIGHTEN THE UPPER PLASTIC NUT. <br />B. TIGHTEN 'iHE TWO t'U" BOLT NUTS (DIAGP-mm 3�A,'t NO 1) <br />C. SET THE VALVE 'I*RIPPING MLCHANISM TU .Fr OPEN POSITION" AS <br />SHOWN IN (DIAGRAM 3A, NO. 3)• PULL ON FLOAT TUBING- IF FLOAT <br />TUBING TRAVELS MORE THAN A 1/24a WHEN THE TRIPPING I�CHA.�`IISM <br />ACTIVATES T:-�._"*1 THE CHAIN NEEDS TO BE ADJUSTED. TO ADa'UST <br />CHAIN PULL THE HITCH PINS OUT. PROPERLY TENSION THE Ci? kIN AND <br />SIMULTA.�'OUSLY REINSERT THE HITCH PINS ON THE CHAIN; PLACING <br />THE HITCH PIN ON EITHz-R SIDE OF THE TRIPPING ME CF-ANISMS LEVER. <br />M.H17263 <br />VOL.1 <br />SEC.1 <br />ILL.1 <br />Pg.3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.