Laserfiche WebLink
-01 11 <br /> SAN JOAOAhCOUNTY ENVIRONMENTAL AL TMENT <br /> UNDERGROUND STORAGE TK <br /> MONITORING L -PAGE 1 <br /> Mol. <br /> -TYPE OF ACTION ❑ 1.NEW PLAN ❑ 2.CHANGE OF INFORMATION <br /> Moz. <br /> AN TYPE MONITORING IS IDENTICAL FOR ALL USTs AT THIS FACILITY. <br /> (Check one item only) ❑ THIS PLAN COVERS ONLY THE FOLLOWING UST SYSTEM(S): <br /> I. FACILITY INFORMATION <br /> FACILITY ID#(Agency Use Only) - <br /> M03. <br /> FACILITY NAME: Quik Stop Market#121 <br /> FACILITY SITE ADDRESS: 1196 West Louise Avenue M04. CITY: Manteca,CA 95336 Mos. <br /> II. EQUIPMENT TESTING AND PREVENTIVE MAINTENANCE <br /> State law requires that testing,preventive maintenance,and calibration of monitoring equipment(e.g.,sensors,probes,line leak detectors,etc.)be performed in M06. <br /> accordance with the equipment manufacturers'instructions,or annua11 ,whichever is more frequent. Such work must be performed by qualified personnel. <br /> MONITORING EQUIPMENT IS SERVICED i�j I.ANNUALLY ❑ 99.OTHER(Specify): ? <br /> III. MONITORING LOCATIONS <br /> This monitoring plan must include a Site Plan showing the general tank and piping layouts and the locations where monitoring is performed(i.e.,location of each sensor, <br /> line leak detector,monitoring system control panel,etc.). If you already have a diagram(e.g.,current UST Monitoring Site Plan from a Monitoring System Certification <br /> form,Hazardous Materials Business Plan map,etc.)which shows all required information,include it with this plan. <br /> IV. TANK MONITORING <br /> MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S):(Check all that apply) M10- <br /> gel. <br /> 10gel.CONTINUOUS ELECTRONIC MONITORING OF TANK ANNULAR(INTERSTITIAL)SPACE(S)OR SECONDARY CONTAINMENT VAULT(S) <br /> SECONDARY CONTAINMENT IS: ❑ a.DRY [Kb.LIQUID FILLED ❑ c.UNDER PRESSURE El d.UNDER VACUUM Mn. <br /> PANEL MANUFACTURER:Veeder Root(Gilbarco Branded) M12. MODEL#: EMC 3.1 M13. <br /> LEAK SENSOR MANUFACTURER:Veeder Root(Gilbarco Branded M14. MODEL#(S): GIL PA02593000002 M15. <br /> ❑ 2.AUTOMATIC TANK GAUGING(ATG)SYSTEM USED TO MONITOR SINGLE WALL TANK(S) <br /> PANEL MANUFACTURER: M16. MODEL M M17. <br /> MIB. MODEL MM <br /> IN-TANK PROBE MANUFACTURER: #(S): <br /> LEAK TEST FREQUENCY: Ela.CONTINUOUS El b.DAILY/NIGHTLY C1 c.WEEKLY M2°. <br /> ❑ d.MONTHLY ❑ e.OTHER(Specify): Mar. <br /> PROGRAMMED TESTS: ❑ a.0.1 h. ❑ b.0.2 h. ❑ c.OTHERS i M22. M23. <br /> g.p.h. g.p.h. (Specify): <br /> C13.INVENTORY RECONCILIATION ❑ a.MANUAL PER 23 CCR§2646 ❑ b.STATISTICAL PER 23 CCR§2646.1 Mza. <br /> ❑ 4.WEEKLY MANUAL TANK GAUGING(MTG)PER 23 CCR§2645 <br /> TESTING PERIOD: F1 a.36 HOURS ❑ b.60 HOURS Mzs. <br /> ❑ 5.INTEGRITY TESTING PER 23 CCR§2643.1 <br /> TEST FREQUENCY: Ela.ANNUALLY [Ib.BIENNIALLY ❑ c.OTHER(Specify): M26. Mz7. <br /> ❑ 6.VISUAL MONITORING DONE: ❑ a.DAILY ❑ b.WEEKLY(Requires agency approval) <br /> M28. <br /> ❑ 99.OTHER(Specify): <br /> V. PIPE MONITORING <br /> MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S)(Check all that apply) M30. <br /> [e1.CONTINUOUS ELECTRONIC MONITORIN,GG OF PIPING SUMP(S)lrRENCH(ES)AND OTHER SECONDARY CONTAINMENT <br /> Mat. <br /> SECONDARY CONTAINMENT IS: LtJ a.DRY ❑ b.LIQUID FILLED ❑ c.UNDER PRESSURE [Id.UNDER VACUUM <br /> PANEL MANUFACTURER:Veeder Root(Gilbarco Branded) M32. MODEL#: EMC 3.1 M33. <br /> LEAK SENSOR MANUFACTURER:Veeder Root(Gilbarco Branded) 1134. MODEL#(S): GIL-PA02592000010 M35. <br /> WILL A PIPING LEAK ALARM TRIGGER AUTOMATIC PUMP(i.e.,TURBINE)SHUTDOWN? Ira.YES ❑ b.NO M36. <br /> WILL FAILURE/DISCONNECTION OF THE MONITORING SYSTEM TRIGGER AUTOMATIC PUMP SHUTDOWN? Wa_YES ❑ b.NO M37. <br /> Rr2.MECHANICAL LINE LEAK DETECTOR (MLLD) THAT ROUTINELY PERFORMS 3.0 g_p.h. LEAK TESTS AND RESTRICTS OR SHUTS OFF <br /> PRODUCT FLOW WHEN A LEAK IS DETECTED <br /> MLLD MANUFACTURER(s):Red Jacket M38. MODEL#(S): FX-2 M39. <br /> ❑ 3.ELECTRONIC LINE LEAK DETECTOR(ELLD)THAT ROUTINELY PERFORMS 3.0 g.p.h.LEAK TESTS <br /> ELLD MANUFACTURER: M40. MODEL#: M41. <br /> PROGRAMMED LINE INTEGRITY TESTS: ❑ a.MINIMUM MONTHLY 0.2 g.p.h. ❑ b.MINIMUM ANNUAL 0.1 g.p.h. M42. <br /> WILL ELLD DETECTION OF A PIPING LEAK TRIGGER AUTOMATIC PUMP SHUTDOWN? ❑ a.YES ❑ b.NO M43. <br /> WILL ELLD FAILURE/DISCONNECTION TRIGGER AUTOMATIC PUMP SHUTDOWN? ❑ a.YES ❑ b.NO M44. <br /> 4.INTEGRITY TESTING <br /> TEST FREQUENCY: ANNUALLY [Ib.EVERY 3 YEARS ❑ c.OTHER(Specify) Mas. M46. <br /> a. <br /> ❑ 5.VISUAL MONITORING DONE: ❑ a.DAILY ❑ b.WEEKLY* ❑ c.MtN.MONTHLY&EACH TIME SYSTEM OPERATED** M47. <br /> *Requires agency approval **Allowed for monitoring of unburied emergency generator fuel piping only per HSC§25281.5(b)(3) <br /> ❑ 6.PIPING IS SUCTION PIPING MEETING ALL REQUIREMENTS FOR EXEMPTION FROM MONITORING PER 23 CCR§2636(a)(3) <br /> ❑ 7.NO PRODUCT OR REMOTE FILL PIPING IS CONNECTED TO THE UST(s) <br /> M48. <br /> ❑ 99.OTHER(Specify) <br />