My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2006-2011
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LOUISE
>
1196
>
2300 - Underground Storage Tank Program
>
PR0231430
>
COMPLIANCE INFO_2006-2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/30/2024 11:04:03 AM
Creation date
6/23/2020 6:48:36 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2006-2011
RECORD_ID
PR0231430
PE
2361
FACILITY_ID
FA0000848
FACILITY_NAME
QUIK STOP MARKET #2121
STREET_NUMBER
1196
Direction
W
STREET_NAME
LOUISE
STREET_TYPE
AVE
City
MANTECA
Zip
95336
APN
217-410-43
CURRENT_STATUS
01
SITE_LOCATION
1196 W LOUISE AVE
P_LOCATION
04
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231430_1196 W LOUISE_2006-2011.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
320
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Qui*k Stop MaInc. <br /> 4567 Enterprise Street•Fremont,CA 94538•(510)657-8500•Fax:(510)657-1544 <br /> June 18,2010 <br /> VIA EMAIL <br /> Thuy Tran <br /> San Joaquin County <br /> Environmental Health Department <br /> 600 East Main Street <br /> Stockton,CA 95202-3029 <br /> Re: UST Program Inspection <br /> Quik Stop Market#121 <br /> 1196 West Louise Avenue,Manteca <br /> Dear Inspector Tran: <br /> As requested in your inspection report dated 6/11/10(summary of violations attached), <br /> Return to Compliance Certification is attached. This letter provides the requested <br /> corrective action statement. <br /> Walton Engineering has been instructed to conduct weekly inspections of UDC condition, <br /> clean if necessary,and adjust float-chain-shear valve assembly for proper function,as <br /> specified in the scope of work agreed to and authorized by Purchase Order#6672 dated <br /> 1/4/10. Walton Engineering has also been cautioned to schedule annual MSC testing as <br /> close as possible to a 12-month time period,and to accurately record the Designated <br /> Operator's monthly inspection reports. <br /> If you have any questions or need additional information,please call or email. <br /> Sincerely, <br /> QUIK STOP MARKETS,INC. <br /> Mike Karvelot <br /> Director of Environmental Affairs <br /> Attachments <br />
The URL can be used to link to this page
Your browser does not support the video tag.