My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2006-2011
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LOUISE
>
1196
>
2300 - Underground Storage Tank Program
>
PR0231430
>
COMPLIANCE INFO_2006-2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/30/2024 11:04:03 AM
Creation date
6/23/2020 6:48:36 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2006-2011
RECORD_ID
PR0231430
PE
2361
FACILITY_ID
FA0000848
FACILITY_NAME
QUIK STOP MARKET #2121
STREET_NUMBER
1196
Direction
W
STREET_NAME
LOUISE
STREET_TYPE
AVE
City
MANTECA
Zip
95336
APN
217-410-43
CURRENT_STATUS
01
SITE_LOCATION
1196 W LOUISE AVE
P_LOCATION
04
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231430_1196 W LOUISE_2006-2011.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
320
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Replacing the ECPU Board Removing the ECPU Board <br /> 10. The console is now writing the current system setup to the EEPROM (E2) chip.After this task is completed, <br /> the printer prints: <br /> ARCHIVE UTILITY <br /> SAVE SETUP DATA: <br /> END TIME: <br /> MMM DD, YYYY HH:MM:SS XM <br /> BYTES: XXXX <br /> 11. And the front panel display reads: <br /> ARCHIVE UTILITY <br /> PRESS<STEP>TO CONTINUE <br /> Removing the ECPU Board <br /> Importantl All operating, setup and historical data will be lost when the console is turned off and the ECPU board <br /> is replaced. <br /> 1. Switch Off power to the Console. Open the left front door of the console. Follow the steps in Figure 1 to <br /> remove the ECPU board. <br /> 2. Place old and new ECPU boards side by side on a clean work surface. Make sure that the Battery Backup <br /> switches on both boards are turned Off. <br /> 3. Using a chip removal tool similar to the one shown (IC Extraction tool, Digikey Part No. K158-ND, or <br /> equivalent),follow the steps outlined in Figure 4 remove the E2 chip from the old ECPU board and install it the <br /> identical socket on the new board reversing the procedure shown in Figure 4. Observe chip oreintation as <br /> shown in Figure 5. <br /> 4. Remove the SEM module from the old board and install it in the SEM socket of the new board (ref Figure 10 <br /> on page 17). Note: Either type SEM will only plug in one way. <br /> 5. Remove the software module from the old ECPU board and install it on the new board (ref Figure 8 on <br /> page 14). If present, also remove the memory module from the old ECPU board and install it on the new <br /> board. <br /> 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.