My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2006-2011
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LOUISE
>
1196
>
2300 - Underground Storage Tank Program
>
PR0231430
>
COMPLIANCE INFO_2006-2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/30/2024 11:04:03 AM
Creation date
6/23/2020 6:48:36 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2006-2011
RECORD_ID
PR0231430
PE
2361
FACILITY_ID
FA0000848
FACILITY_NAME
QUIK STOP MARKET #2121
STREET_NUMBER
1196
Direction
W
STREET_NAME
LOUISE
STREET_TYPE
AVE
City
MANTECA
Zip
95336
APN
217-410-43
CURRENT_STATUS
01
SITE_LOCATION
1196 W LOUISE AVE
P_LOCATION
04
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231430_1196 W LOUISE_2006-2011.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
320
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Replacing the ECPU Board Installing the ECPU Board <br /> 4 Continuing to apply <br /> pressure with fingers, <br /> gently lift the tool <br /> straight up until the <br /> chip pins are clear <br /> 4 of the socket. <br /> 1 Rest bottom of tool on <br /> socket. Push down with �\ <br /> thumb to hold tool on V' <br /> socket. <br /> a <br /> Slides' 2 Pull up with fingers on T 3 Continue to pull up <br /> slides to close lifting with fingers until <br /> Lifting clamps clamps against ends chip is lifted up <br /> of E2 chip and liftingagainst bottom <br /> hooks under ends of tool. ——— <br /> Lifting hooks of chip <br /> / / <br /> consoleAchipto.eps <br /> Figure 4. Removing the EEPROM Chip from the ECPU Board <br /> I_li <br /> ---LL-----1-----U-----x-- ' 1 <br /> -r-rimllnmmrmmmmrmmmmmlmmrmmmmrmTr-_ <br /> --��71ftIHI MitNlttlklMi kflttiHI M11NIH1FN HfIfilNilN M+IHi It�J <br /> ----------------- - - 1-=�' ' --- ' <br /> U13 ----- U16 ---- N <br /> I <br /> Notch w <br /> U32 ----- <br /> (Painted _--~ ' <br /> ' on board) 27 <br /> Indented <br /> 1 <br /> !____I semicircle ' <br /> (On chip) <br /> I <br /> I I <br /> U12 A i <br /> ' I <br /> ----------- <br /> Z-7z,- <br /> Y2 <br /> ----------____Y2 <br /> Check to see that chip pins are aligned and not bent.Orient chip so that the small ---- <br /> indented semicircle on the top of the chip is on the same end as the small notch painted U33 <br /> on the board above the socket(in this <br /> example on the top).Carefully align the chip pins over the socket holes and gently push <br /> the chip down until all the pins are in the socket holes.Then push down firmly and evenly <br /> on the chip until it is down against the socket.Check to see that each of the pins is in its <br /> socket. <br /> Figure 5. Orienting E2 Chip <br /> Installing the ECPU Board <br /> 1. Install the new ECPU board in the console following the steps outlined in Figure 6. <br /> 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.