Laserfiche WebLink
SAN JOAWN COUNTY ENVIRONMENTAL HEALTH IWRTMENT <br /> UNDERGROUND STORAGE TANK <br /> MONITORING PLAN (Page 2 of 2) <br /> VI.UNDER DISPENSER CONTAINMENT(UDC)MONITORING <br /> 1. UDC MONITORING IS PERFORMED USING THE FOLLOWING METHOD 490-54a <br /> ,�/ 490-54b <br /> El 1.CONTINUOUS ELECTRONIC MONITORING LJ 2.FLOAT AND CHAIN ASSEMBLY ❑ 3.ELECTRONIC STAND-ALONE <br /> ❑4.NO DISPENSERS ❑99.OTHER(Specify). -____– _ <br /> --------------------------------- - -------------------------------------------------- <br /> PANEL MANUFACTURER: ash=ss i MODEL#: 490-56. <br /> --------------------------------------------------------------------------------------------------------------------------------------------- ---------------------------------------------- <br /> LEAK SENSOR MANUFACTURER: 490 MODEL#(S): ago-sa <br /> DETECTION OF A LEAK INTO THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS ❑ a.YES b.NO 490-59 <br /> UDC LEAK ALARM TRIGGERS AUTOMATIC PUMP SHUTDOWN ❑ a.YES eb.NO 490-60. <br /> FAILURE/DISCONNECTION OF UDC MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. [:1a.YES e.NO 490-61 <br /> UDC MONITORING STOPS THE FLOW OF PRODUCT AT THE DISPENSER. I>e a.YES ❑b.NO 490-62 <br /> 2.UDC CONSTRUCTION IS 1.SINGLE-WALLED ❑2.DOUBLE-WALLED 490-63 <br /> IF DOUBLE WALLED: 490-64a <br /> _UDC INTERSTITIAL SPACE IS MONITORED BY: ❑1.LIQUID ❑2.PRESSURE ❑3.VACUUM <br /> T – – — – -- –- – ------------------SS E ----3.-VACUUM------------------------------------------------------------------------ <br /> A LEAK WITHIN THE SECONDARY CONTAINMENT OF THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS ❑a.YES ❑b.NO 490-64b <br /> VII.PERIODIC SYSTEM TESTING <br /> 1. ELD TESTING: THIS FACILITY HAS BEEN NOTIFIED BY THE STATE WATER RESOURCES CONTROL BOARD THAT ENHANCED 490-65. <br /> LEAK DETECTIQNr(ELD)MUST BE PERFORMED._PERIODIC ELD IS PERFORMED EVERY 36 MONTHS AS REQUIRED.(23 CCR§2644.1) –- <br /> [$2.SECONDARY CONTAINMENT COMPONENTS ARE TESTED EVERY 36 MONTHS 490-66 <br /> --- --------------------- ---------------------- --------- --------- ---------------------- ------------------- - ------- <br /> --- ------- --------------------- --------- <br /> 3.SPILL BUCKETS ARE TESTED ANNUALLY. ago-67 <br /> VIII.RECORDKEEPING <br /> The ollowing nlonitoring/mat tenance records are kept for this facility: <br /> M Alarm logs 490-68a EVisual Inspection Records 490-68b ❑Tank integrity testing results 490-68c <br /> ❑SIR testing results(and supporting documentation records). 490-6sd ❑ Tank gauging results(and supporting documentation records). 490-68c <br /> ❑ATG Testing results(and supporting documentation records).490-68f ❑ Corrosion Protection 60-day logs 490-68g <br /> VEquipment maintenance and calibration records. 490-68h <br /> IX.TRAINING <br /> Personnel with UST monitoring responsibilities are familiar with all of the following documents relevant to their job duties. 490-69a <br /> REFWNCE DOCUMENTS MAINTAINED AT FACILITY(Check all that apply) <br /> Q'�HIS UNDERGROUND STORAGE TANK MONITORING PLAN(Required)490.69b <br /> [$'OPERATING MANUALS FOR ELECTRONIC MONITORING EQUIPMENT(Required)490-69c <br /> ❑ CALIFORNIA UNDERGROUND STORAGE TANK REGULATIONS 490-69d <br /> ❑ CALIFORNIA UNDERGROUND STORAGE TANK LAW 490.69e <br /> ❑ STATE WATER RESOURCES CONTROL BOARD (SWRCB) PUBLICATION: "HANDBOOK FOR TANK OWNERS - MANUAL AND <br /> STATISTICAL INVENTORY RECONCILIATION"490-69f <br /> ❑,SWRCB PUBLICATION:"UNDERSTANDING AUTOMATIC TANK GAUGING SYSTEMS"490-69g <br /> [0 OTHER(Specify):M69h,M69i "Written Procedures&Best Management Practices for Monitoring Double Containment CST Systems" <br /> This facility has a"Designated UST Operator"who has passed the California UST System Operator Exam administered by the International Code Council(ICC). <br /> The"Designated UST Operator"will train facility employees in the proper operation and maintenance of the UST systems annually,and within 30 dais of hire.This <br /> training will include,but is not limited to,the following: <br /> ➢ Operation of the UST systems in a manner consistent with the facility's best management practices <br /> ➢ The facility employee's role with regard to the monitoring equipment as specified in this UST Monitoring Plan <br /> ➢ The facility employee's role with regard to spills and overfills as specified in the UST Response Plan <br /> ➢ Names of contact person(s)for emergencies and monitoring alarms.490-70 <br /> M COMMENTS/ADDITIONAL INFORMATION <br /> Provide additional comments here or indicate how many pages with additional information on specific monitoring procedures are attached to this plan.490-71 <br /> TANK OVERFILL PREVENTION(OR PROTECTION)IS ACCOMPLISHED BY THE FOLLOWING'IWO(2)METHODS: <br /> 1. MECHANICAL OVERFILL,VALVES INSTALLED IN DROP TI-BES,SET TO TRIP AT 95%TANK CAPACITY. <br /> 2. ALL SERVICE PENETRATIONS TO THE PRIMARY CONTAINMENT ARE CONTAINED WITHIN SCAMPS. <br /> XI.PERSONNEL RESPONSIBILITIES <br /> The UST Owner/Operator is responsible for ensuring that:1)the daily/routine UST monitoring activities and maintenance of UST leak detectipa,equi ment covered by <br /> this plan occurs,2)all conditions that indicate a possible release are investigated,and 3)all monitoring records are maintained properly. <br /> The following person(s)are responsible for performing the monitoring and equipment maintenance: <br /> NAME GURNATH SINGH&SURMOHINDERJIT KAUR 490-72 TITLE FRANCHISEES 490-73 <br /> NAME SAMI ALKOUSSA 490-74 TITLE DISTRICT ADVISOR 490-75 <br /> The Designated Operator shall perform a monthly visual inspection of the facility,provide a report to the owner/operator,and inform thetipsnigr/operator of any <br /> conditions that need follow-up action. <br /> XII.OWNER/OPERATOR SIGNATURE f' <br /> CERTIFICATION:I certify that the information provided herein is true and accurate to the best of my knowledge. <br /> APPLICANT SIGNA 490-76 DATE: 490-77 <br /> i <br /> APRIL 13,2012 <br /> P r o <br /> APPLICANT NAME(print): 490-78 APPLICANT TITLE: 490-79 <br /> MIKE KARVELOT,for QUIK STOP MARKETS,INC. DIRECTOR,ENVIRONMENTAL AFFAIRS <br />