My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2012-2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LOUISE
>
1196
>
2300 - Underground Storage Tank Program
>
PR0231430
>
COMPLIANCE INFO_2012-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/2/2024 1:05:50 PM
Creation date
6/23/2020 6:48:40 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2012-2018
RECORD_ID
PR0231430
PE
2361
FACILITY_ID
FA0000848
FACILITY_NAME
QUIK STOP MARKET #2121
STREET_NUMBER
1196
Direction
W
STREET_NAME
LOUISE
STREET_TYPE
AVE
City
MANTECA
Zip
95336
APN
217-410-43
CURRENT_STATUS
01
SITE_LOCATION
1196 W LOUISE AVE
P_LOCATION
04
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231430_1196 W LOUISE_2012-2018.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
310
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECONDARY LINE TESTINGAUG 0 9 2016 <br />Test Method By: o Manufacturer • Industry Standard o Professional Engr o Other (see below) <br />Test Method Uses: • Pressure o vacuum o Hydrostatic o Other (see below) <br />Measuring Equipment Used: Pressure Gauge (range Oto 15 psig) <br />Descrintion <br />Line #1 Line 02 <br />Tank product <br />Gasoline - 87 <br />Gasoline - 91 <br />Pipe manufacturer <br />Smith <br />Smith <br />Pipe material <br />FRP <br />FRP <br />Primary pipe diameter (inches) <br />2 <br />2 <br />Secondary pipe diameter (inches) <br />3 <br />3 <br />Method of secondary pipe isolation <br />Termination Boot <br />Termination Boot <br />Location of secondary pipe isolation <br />Sump <br />Sump <br />Estimated length of piping run (feet) <br />95 <br />105 <br />(include length of branch runs) <br />PASS <br />PASS <br />Wait time for pressure to stabilize (hr:min) <br />:15 <br />:15 <br />Test start time <br />11:11 AM <br />11:05 AM <br />Initial pressure (psig) <br />5.0 <br />5.0 <br />Test end time <br />12:11 PM <br />12:05 PM <br />Final pressure (psig) <br />5.0 <br />5.0 <br />Test duration (hr:min) <br />1:00 <br />1:00 <br />Change in pressure (psig) <br />0.0 <br />0.0 <br />Pass/Fail threshold (psig) <br />0.5 <br />0.5 <br />TEST RESULT <br />PASS <br />PASS <br />Comments: <br />0 2015 Walton Engineering, Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.