My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2007-2010
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
1580
>
2300 - Underground Storage Tank Program
>
PR0231476
>
COMPLIANCE INFO_2007-2010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/9/2024 12:59:20 PM
Creation date
6/23/2020 6:49:09 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2007-2010
RECORD_ID
PR0231476
PE
2361
FACILITY_ID
FA0000684
FACILITY_NAME
QUIK STOP MARKET #3125
STREET_NUMBER
1580
Direction
W
STREET_NAME
MAIN
STREET_TYPE
ST
City
RIPON
Zip
95366
APN
259-090-21
CURRENT_STATUS
01
SITE_LOCATION
1580 W MAIN ST
P_LOCATION
05
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231476_1580 W MAIN_2007-2010.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
313
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
F:10 VV <br />acknowledges <br />Isaac Diaz of Walton _pMg1n.,,,g <br />has attended installation training for the OPW <br />FICXWOrks System by OPW Fueling Containment <br />and Pisces 11 System with Swivel and Coax Fittings <br />rK <br />Ion Dal, <br />1Up-rV VV. W-- <br />r4qj.M4 4e.1A.M.00T SYSTRMS <br />acknowledges <br />Kevin Graf of Walton Engineering <br />has attended installation training for the OPW <br />FlexWorks System by OPW Fueling Containment <br />and Pisces 11 System with Swivel and Coax Fittings <br />Trs16nn&Djw A-Ab*rMdOPW-FCS Expirawn <br />RcprctlTlutivr <br />L <br />PW <br />acknowledges <br />Larry Ducy of Walton Engineering <br />has attended installation training for the OPW <br />FlexWorks System by OPW Fueling Containment <br />and Pisces If System with Swivel and Coax Fittings <br />](312008 <br />TrainirfS D4vk- AulharLvd (JPW,rC-j DRIC <br />RcpraTcnrtuiac <br />4C> F3, VV --* <br />rMING CONT&M.M., ST111"s <br />acknowledges <br />i Jim Day of Walton Engineering <br />has attended installation training for the OPW <br />FlcxWorks System by OPW Fueling Containment <br />3 <br />and Pisces 11 System with Swivel and Coax Fittings <br />13.12008 I. 12010 <br />Trzimir4 [laic Authanzod OPW.FCS Expirrfinft Nic <br />---------- <br />C> FO VV 4 <br />roe LIME CONTAIMMMT SVIVRMS <br />acknowledges <br />David Delgado of Walton Engineering <br />has attended installation mining for the OPW <br />FlcxWorks System by OPW Fueling Containment <br />and Pisces 11 System with Swivel and Coax Fittings <br />I iY2008 k-=— - 1134010 <br />Trairmi; rAW Ambmind OPW-F('S Ellpimlion Date <br />Rcpreunwive <br />C> FO %#V <br />acknowledges <br />Mike Busters of Watson Engineering <br />has attended installation training for the OPW <br />FlcxWorks. System by OPW Fueling Containment <br />and Pisces 11 System with Swivel and Coax Fittings <br />Traiing Daft <br />acknowledges <br />David Diaz of Walton Engineering <br />has attended installation training for the OPW <br />FlexWorks System by OPW Fueling ContaimucM <br />and Pisces 11 System with Swivel and Coax Fittings <br />VY21V8 I13120,10 <br />Tuining Dole AuthafizM OW -RIS Expiration Dole <br />Rrpmicnullc <br />C)O Pp VV _4 <br />acknowledges <br />Rafael Flores of Walton Engineering <br />has aitcMW installation training for the OPW <br />FlcxWorks System by OPW Fueling Containment <br />and Pisces 11 System with Swivel and Coax Fittings <br />1,°312008 113/2010 <br />Trairidnig Daw a Opw-rcs ExpirAtionDW <br />RMcKnU11%,c <br />Ak IV <br />
The URL can be used to link to this page
Your browser does not support the video tag.