My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2007-2010
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
1580
>
2300 - Underground Storage Tank Program
>
PR0231476
>
COMPLIANCE INFO_2007-2010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/9/2024 12:59:20 PM
Creation date
6/23/2020 6:49:09 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2007-2010
RECORD_ID
PR0231476
PE
2361
FACILITY_ID
FA0000684
FACILITY_NAME
QUIK STOP MARKET #3125
STREET_NUMBER
1580
Direction
W
STREET_NAME
MAIN
STREET_TYPE
ST
City
RIPON
Zip
95366
APN
259-090-21
CURRENT_STATUS
01
SITE_LOCATION
1580 W MAIN ST
P_LOCATION
05
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231476_1580 W MAIN_2007-2010.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
313
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ARB Approved IOM - Executive Order* -201-C and VR -202-C (Universal Dispens1anual) Page 197 <br />`Tools Required <br />• 0-100" Water Column Vacuum Gauge <br />• 9" Lineman's Pliers <br />• Assorted Open End Wrenches 1/4" through 3/4" <br />• Assorted Allen Wrenches <br />• Wire Cutters/Strippers 18 AWG and 26 AWG <br />• 3/8" Drill Assembly <br />• Assorted Drill Bits 1/16" through 7/16" <br />• 1/2" (5/6'0.D.) Copper Tube Bending Tool <br />• 1/2" (5/8" O.D.) Copper Flaring Tool <br />• Assorted Screwdrivers (Flat blade -one must be 1/8" wide) <br />• 1 1/8" Sheet Metal Hole Punch (for Potted Conduit <br />Assembly) <br />• Copper Tubing Cutter <br />• Electrical Multi -meter <br />• 12" adjustable Wrench <br />• 18" Channel lock Pliers <br />• (2) 18" Pipe Wrench <br />• Hand Pipe Threader (for up to 1" pipe) <br />• Pipe Cutter (for up to 1" pipe) <br />• Tape Measure <br />• Teflon Tape <br />• Thread Sealing Compound <br />• 1/2" or 3/8" Ratchet set w/Sockets 1/4" through 9/16" + <br />3" Extension <br />Dispenser Access <br />• Secure dispenser access keys from station management. <br />• Lock -out and tag -out all electrical power to dispenser being modified. <br />• Remove dispenser panels and open doors as required for installation. <br />Dispenser Survey <br />Close inspection of the dispenser is needed before any work begins. The survey should include the following <br />observations: <br />• What vapor recovery system (if any) is currently installed — Balance or VAC Assist? <br />• Does the existing vapor piping have any obstructions inline such as solenoid valves or ball valves? <br />• The installer should take note of any possible obstructions that would effect the proper installation of the vacuum pump. <br />Before Mounting the Vacuum Pump <br />• The vacuum pump inlet cover must be accessible for service. <br />• Allow spacing for inlet piping test port and ball valve. <br />• An unobstructed path for the installation of vapor tubing. <br />• Allow space for electrical conduit components. <br />• Access point for the potted conduit through the vapor barrier. <br />Figure T <br />14; <br />ELECTRONIC COMMERCIAL <br />9 UNLEADED PREMIUM <br />Control <br />Module <br />Z <br />Potted <br />Conduit <br />J -Box <br />VP1000 <br />Vacuum <br />Pump <br />
The URL can be used to link to this page
Your browser does not support the video tag.