Laserfiche WebLink
a <br /> UST SYSTEM STE RETROFIT OR REPAIR <br /> (Submit minimum of 3 sets of plans&applications as originals will be retained by EHD) <br /> 1. Site map enclosed? YES P] NO[] <br /> 2. Submit copies of ICC Service Technician and/or Installer's certificate and all manufacturer training certificates for each <br /> person installing or testing any component that is repaired or replaced. Ensure a copy of the "Site Health and Safety <br /> Plan" is available on the jobsite as required by Title 8. <br /> 3. Detailed description of work to be completed. List components to be repaired or replaced and attach a diagram drawn <br /> to scale showing location of repairs and/or replacements. If repairing a component, describe how this will be done. (If <br /> adding piping, UDC's, or other UST equipment, or performing tank top upgrade, use the UST Installation Application <br /> pages 4-8 as necessary for a timely plan review): <br /> Quik Stop is upgrading the facility' s existing Point Of Sale (POS) <br /> system. This requires a monitoring system "cold-start" to ensure <br /> proper communication between the POS system and the monitoring system. <br /> A monitoring system certification will be performed and submitted to the <br /> Agency and Owner (including alarm history) . <br /> 4. List of equipment to be used (Attach manufacturer's specification sheets showing third-party approval): <br /> 2 <br />