My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2007-2010
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
1580
>
2300 - Underground Storage Tank Program
>
PR0231476
>
COMPLIANCE INFO_2007-2010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/9/2024 12:59:20 PM
Creation date
6/23/2020 6:49:09 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2007-2010
RECORD_ID
PR0231476
PE
2361
FACILITY_ID
FA0000684
FACILITY_NAME
QUIK STOP MARKET #3125
STREET_NUMBER
1580
Direction
W
STREET_NAME
MAIN
STREET_TYPE
ST
City
RIPON
Zip
95366
APN
259-090-21
CURRENT_STATUS
01
SITE_LOCATION
1580 W MAIN ST
P_LOCATION
05
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231476_1580 W MAIN_2007-2010.tif
标签
EHD - Public
Jump to thumbnail
< previous set
next set >
该页面上没有批注。
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
313
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
j ^ Attestation No. P 3424 <br />o. <br />Juan Jaureg <br />Walton Engineering c. <br />Attended Installation Training for EVR Phase I by OPW, Inc. <br />i <br />By: Tom Spindle On: 9/26/2006 <br />In: Exp Date: 9/26/2008 <br />Comp kbbn ofths training course does not aeate a warmly orguaranty 0 0PW a your ins7agation <br />and/orr�irKenan� rozaes vafla'nto�rysyslens and EYR:PHASfls}�er This Raining <br />cows don na er natethe nwdm s&iWyadhere tomanufactmwinswctws ardprOwd— when <br />instaNingard-Mktainaig nooks; vporr�v&ySystems ardEVR PHASEISysffins. Att-noaie£ <br />vapor remveysyslens and EVR PHASf I Systems must be insblkd and inainiained in aarrdance with <br />maMACWfa, inductors and pmedures <br />_ Attestation No. P 3426 <br />Gerardo Guzman Jr. <br />Walton Engineering Inc. <br />t! <br />Attended Installation Training for EVR Phase I by OPW, Inc. <br />By: Tom Spindle On: 9/26/2006 <br />In: Exp Date: 9/26/2008 <br />Canp&kv of Rus batmng mules dos not arab' a warranty orguardnty by OPW of your installation <br />aiWormaataaneofnozdes; vaporremverysW ms and EVR PHASEIsystr✓ra ThrstranaV <br />coarse doe nor elhninote Me need to.sbicttyadl)ee to when <br />inslanng and maintai-v no -1 ,4 -p--away system aid EVR PHAzrswftm Ad nom <br />vapor remverysystem and EVR PHASEI System must be nstagedand rnatnaiied in acrmdame wdh <br />lcanufactuier mouctons andpioedrnes. <br />Attestation No. P 3428 <br />Raymond Ochog <br />Walton Engineering Inc. <br />Attended Installation Training for EVR Phase I by OPW, Inc. <br />By: Tom Spindle On: 9/26/2006 <br />In: Exp Date: 9/26/2008 <br />!� Completim ofthiF.bawing mums does na awte a warranty, orguamw by OPW of your inslallabon <br />aidhimai&Vffane ofnawes vapormcoverysysteidsand EVR PHASEIsysfeirzc Thus Raining <br />course des not egff*oie he need to strwr adhere to nanufadviermovctms and pmoadmes when <br />irstatging aid eatntaimly --ley vapor recovery systms and Em PHASEI Systema. All nortK <br />vapor romverysystns and M PHASE Systems must be tnstged and maintained to aadrdane 07th <br />. manufXWmrtns'axdousandpmeduns. <br />- - Attestation No. P 3419 <br />Andres Morales <br />Walton Engineering Inc. <br />Attended Installation Training for EVR Phase I by OPW, Inc. <br />By: Tom Spindle On: 9/26/2006 <br />In Exp Dateit I : 9/26/2008 <br />Comptebw ofthis Raining mm doers not neat a warmly orguamty, by aw oryour <br />MM Raining t� <br />i and/anainftWxLofiwzztes vapor--ysys[e/tsand EVRPHASEISYs <br />cams. doe not gn*,atdieneedtos&At,*adowtorMndfacturcrirtswcRmsa�pmredurswhen <br />it Irm9_ardrtaintaiiwgno torpor iecovaysystrmsardEVRPHASEISysfrms. Affnaaft <br />vaporMWverysy3bensardfWpHASEISystffMM tbe-irstitdandnZwntatned-inammdanewith <br />manufactvie ImriucRons and procedure, <br />it <br />Attestation No. P 3421 <br />- <br />Wal <br />,�%... Jimmy Hamblen <br />Walton Engineering Inc. <br />Attended Installation Training for EVR Phase I by OPW, Inc. <br />By: Tom Spindle On: 9/26/2006 <br />In: Exp Date: 9/26/2008 <br />! 1 <br />colgoftm ofthts tratnnrg course doaFna creat a warranty orguararnty by oPwof yowrrista#abm <br />aid/ormaiaenanm mrezaes vapor moomysystem and EVRPHASEfsystns 7h&Ramrg <br />G cease does not aWw ate be i toSRtdiyadhme to nwm#kdwertrstructiors and pmerdwes what <br />imiallm andMmtatwU nude vapornxvmysyst^sa� PHA lSystrns. A/Inozdes, <br />vaporrecaverysystmsond EVR PPA SF <br />Systars nest be trtsWled and nainta in acrmdarnce with <br />mamAdurw irstmctioms and pmcedurs, <br />Attestation No. P 3423 <br />s t <br />j <br />Jessie D. Andreda <br />Walton Engineering Ina <br />{;. <br />Attended Installation Training for EVR Phase I by OPW, Inc <br />By: Tom Spindle On: 9/26/2006 <br />P!.µY <br />In: Exp Date: 9/26/2008. <br />Connkftnoftnistraining.course.does. not ast.awarraayorguaramybyOPWofwuriistikbon <br />:,: <br />aM/oCmaimararrce ofno�er vapor remverysystmsaid EVRPHASEIsy;terns 77iisbanmg <br />course deem not efrriunat b'e need to sbi'*adhere to nanufaaurerirtsbuaiois and pmedares when <br />+, <br />ini#alringabemairntwiwu mzde-q, vaporreeoverysySMMardEMPH45�ISyst&m Agnoaks, <br />..i <br />' <br />vaporremverysystnns-aid EVR PHASEI Systems must be iistaded and maintained in aamdance wdh <br />Attestation No. P 3425 <br />1 <br />David Delgado <br />Walton Engineering Inc. <br />I <br />Attended Installation Training for EVR Phase I by OPW, Inc <br />By- Tom Spindle On: 9/26/2006 <br />In: Exp Date: 9/26/2008 <br />r <br />compleRon of Rus training murm does not ovate a warranty aguaranty by OPW of your insta//alron <br />and EVR PHASEIsystemc This training <br />I! <br />_( <br />and/ormaaft7aneofrao�s vaporrem�rysySterns <br />mores d not eliminate the meed toStrtdtyadhere to manufacturer instnxRom and procedure when <br />A/lnoa/e£ <br />' <br />irslalling andeaintlntW n0ks vapor rewverySysfens and'EVR PHASEISyslems. <br />EM PHASEI Systems must be i7stalkd and mantatned in aawdance mm <br />vapor remverysystem and <br />manufacturer imtructiortsand procedures <br />_ <br />tl <br />1 <br />. Attestation No. P 3427 F20141� <br />Greg Copp <br />f! <br />Walton Engineering Inc. <br />Attended Installation Training for EVR Phase I by OPW, Inc <br />By: Tom Spindle On: 9/26/2006 <br />�! <br />In: Exp Date: 9/26/2008 <br />J <br />Completion ofths baintmJ curse dos not aet a warranty orguaranty by OPW ofyvur installation <br />; <br />ard/or'naintaname-ofnozdes, vapo ree�myslstwmand EVR PHASEIsystems 77t&&Wning <br />comsdos naetiminat He need mmtriaN adherem »anufacttrner irsbucRms and procedures when <br />I <br />�! <br />irstaliingandmaintainingnaa/es� wp rmwvvysysmmardEw PHAsFrsystms. Allnozees <br />EM PHASE System be ubtalled maintained in aaordance <br />vapor nwverysystems and must and wdh <br />nranufacbmer instnxtions and procedure. <br />Attestation No. P 3418 <br />Isaac Diaz <br />k <br />t <br />Walton Engineering Inc. <br />fj <br />Attended Installation Training for EVR Phase I by OPW, Inc <br />By: Torn Spindle On: 9/26/2006 <br />4 <br />In: Exp Date: 9/26/2008 <br />cwwletw athts traintrg emw doss not neat a warranty or guaranty by OPW of your inst/kbmr <br />i <br />and/ormainftwow ofnozees,wporrawwrysystem and EVR".SFlsystems 71W"ining <br />course does not elmnate tle nee fastrtcYly adhere M menu/actmer insbuctims and proedmes wher7 <br />imtjr1ng&?dmatnlatmngno=ft vapor Anoverysystns,andEVRPHASEISystns. Ag.nozdes, <br />vAwriemverysystam and EVR PHASEI Systans must be irslalledard matnbned in accordance with <br />mamAtboarir&s ?xtiomsandpmeedurs. <br />$ `- Attestation No. P 3420 <br />Janier Melendrez <br />Walton Engineering Inc. <br />s ` <br />Attended Installation Training for EVR Phase I by OPW, Inc. <br />By: Tom Spindle On: 9/26/2006 <br />i <br />i <br />In: Exp Date: 9/26/2008 <br />Canpktimn ofthis traintrrg ems does mamas a warranty orguxanty by 0PWof yovr nstadabon <br />ard/ormaitwancecfine2es,vaporrecowjysystaysaodMPHASEIs)Snm ihistrainiv <br />! <br />course dos not effmimt the need to striotlyadhereto aredptxedms whar <br />ustl8ng and naintaimngnoZft MpwrecnVaysystmsandEVRPHA.-UIsystms. Agnoak-S <br />vapor reewry sysism and&R PHASEI Systans must be thstalkdand maintained in amordance with <br />j'. <br />namifactunr mstivcrons andprowdurs. <br />
The URL can be used to link to this page
Your browser does not support the video tag.