My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2007-2010
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
1580
>
2300 - Underground Storage Tank Program
>
PR0231476
>
COMPLIANCE INFO_2007-2010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/9/2024 12:59:20 PM
Creation date
6/23/2020 6:49:09 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2007-2010
RECORD_ID
PR0231476
PE
2361
FACILITY_ID
FA0000684
FACILITY_NAME
QUIK STOP MARKET #3125
STREET_NUMBER
1580
Direction
W
STREET_NAME
MAIN
STREET_TYPE
ST
City
RIPON
Zip
95366
APN
259-090-21
CURRENT_STATUS
01
SITE_LOCATION
1580 W MAIN ST
P_LOCATION
05
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231476_1580 W MAIN_2007-2010.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
313
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WALTON <br /> ENGINEERING, INC. <br /> Monday, August 23, 2010 <br /> SAN JOAQUIN COUNTY ENV. HEALTH - CUPA AIDS L 4 X010 <br /> 600 East Main Street ENVIRUNNIENT HEALTH <br /> Stockton, CA 95202 PERM,IT/SER VICES <br /> Reference: Quik Stop #125 <br /> 1580 W. Main Street, Ripon, CA 95366 <br /> Subject. Monitoring System Cold-Start Permit Application <br /> Dear Permitting, <br /> This letter is to serve as transmittal cover for the enclosed cold-start permit application. <br /> Quik Stop is upgrading its POS equipment and this upgrade requires a monitoring <br /> system cold-start to ensure proper communication from the monitoring console to the <br /> POS equipment. The alarm history will be printed out and included in the post cold- <br /> start Monitoring System Certification. <br /> This facility had its annual MSC performed June 25, 2010. This partial MSC will not <br /> change the annual date, it is only to re-certify the monitoring system after the cold- <br /> start. <br /> Please see enclosed permit fee $366.00, Walton licenses, certifications, and site <br /> exhibit. <br /> Thank you and please let me know if there is anything I can do or provide to expedite <br /> permit issuance. This project is scheduled for Tuesday, September 21 , 2010. <br /> Sincerely, <br /> WA TON ENGINEERING, INC. <br /> Tanya Thom son <br /> (916) 373-1165 <br /> tanya.t@waltonengineering.com <br /> attachments a/s <br />
The URL can be used to link to this page
Your browser does not support the video tag.