My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2007-2010
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
1580
>
2300 - Underground Storage Tank Program
>
PR0231476
>
COMPLIANCE INFO_2007-2010
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/9/2024 12:59:20 PM
Creation date
6/23/2020 6:49:09 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2007-2010
RECORD_ID
PR0231476
PE
2361
FACILITY_ID
FA0000684
FACILITY_NAME
QUIK STOP MARKET #3125
STREET_NUMBER
1580
Direction
W
STREET_NAME
MAIN
STREET_TYPE
ST
City
RIPON
Zip
95366
APN
259-090-21
CURRENT_STATUS
01
SITE_LOCATION
1580 W MAIN ST
P_LOCATION
05
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231476_1580 W MAIN_2007-2010.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
313
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UNDER DISPLRSER CONTAINMENT DC TESTING <br /> Test Method By: O Manufacturer • Industry Standard o Professional Engr o Other(see below) <br /> Test Method Uses: O Pressure O Vacuum • Hydrostatic o Other(see below) <br /> Measuring Equipment Used: INCON TS-STS (Electronic Sump Test System) <br /> Description Disp# 1/2 Disp#3/4 Disp#5/6 <br /> UDC manufacturer Brave Brave Brave <br /> UDC material Steel Steel Steel <br /> UDC depth (inches) 9 9 9 <br /> Height from UDC bottom to highest Bottom Bottom Bottom <br /> piping penetration <br /> Height from UDC bottom to lowest Bottom Bottom Bottom <br /> electrical penetration <br /> Condition of UDC prior to testing Dry Dry Dry <br /> Portion of UDC tested Entire Entire Entire <br /> Type of shut-down present Float Float Float <br /> Was sensor removed for testing? N/A N/A N/A <br /> Was sensor properly replaced after testing? N/A N/A N/A <br /> Depth of water level from UDC bottom (in.) 6 6 6 <br /> Wait time for water level to stabilize (hr:min) 0:05 0:05 0:05 <br /> Test start time 2:12 PM 1:15 PM 2:35 PM <br /> Initial Probe Reading 2.4218 2.6598 1.3109 <br /> Test end time 2:27 PM 1:30 PM 2:50 PM <br /> Final Probe Reading 2.4212 2.6594 1.3109 <br /> Test duration (hr:min) 0:15 0:15 0:15 <br /> Change in water level (±0.0000 inches) -0.0006 -0.0004 0.0000 <br /> Pass/Fail threshold (±0.0020 inches/:Hr.) 0.0020 0.0020 0.0020 <br /> TEST RESULT PASS PASS PASS <br /> Comments: <br /> Replaced the high voltage penetration boot in UDC 1-2. <br /> 0 2010 Walton Engineering,Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.