Laserfiche WebLink
WRITTEN PROCEDURES &BEST MANAGEMENT PRACTICES <br /> FOR MONITORING <br /> DOUBLE CONTAINMENT UNDERGROUND STORAGE TANK SYSTEMS <br /> Quik Stop Market#125 <br /> 1580 West Main Street <br /> Ripon,California 95366 <br /> The motor fuel storage and dispensing system at this location consists of two(2) 10,000 gallon <br /> gasoline and one(1) 8,000 gallon diesel,double-wall fiberglass,dry interstitial,underground <br /> storage tanks serving three(3) double sided multi-product dispensers (MPDS). Product lines are <br /> double-wall fiberglass. <br /> A. Each tank and product line is monitored continuously by probes within the tank annular <br /> space and turbine sump,respectively. Float and chain assemblies in dispenser pans will <br /> trip shear valves in the event that dispensers leak. <br /> B. The Gilbarco EMC 3.1 tank and line monitoring system is manufactured by Veeder- <br /> Root. Leak conditions trigger visual and audible alarms located on the monitoring <br /> system control panel. Turbine shutdown will occur if either power is lost to the control <br /> panel or turbine sump probe(s) sense leak conditions. <br /> C. The monitor control panel is located in the market office. The monitor is placed in test <br /> mode daily to check alarm function. Results are recorded on a"Daily Monitoring System <br /> Inspection Log". <br /> D. Monitoring is the responsibility of Bhupinder&Amar it Gill,Franchisees, or their <br /> designated duty clerk. Maintenance of the monitoring equipment is the responsibility of <br /> Quik Stop Markets,Inc. All repairs will be authorized by Mike Karvelot,Director of <br /> Environmental Affairs. <br /> E. If an alarm occurs, the Franchisee will immediately contact the Quik Stop Gasoline <br /> Department,which will in turn dispatch a qualified service contractor to the site. The <br /> service contractor will determine the cause of alarm and advise Quik Stop of site <br /> conditions. If an unauthorized release to secondary containment has occurred, action will <br /> be immediately taken to implement the Written Response Plan. <br /> F. The monitoring panel and interstitial probes are checked and certified annually in June. <br /> Preventive maintenance and spill bucket testing is scheduled annually in conjunction with <br /> monitor certification. Secondary containment testing is conducted tri-annually in <br /> December('04, '07, ad infinitum). <br />