My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2011-2012
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
1580
>
2300 - Underground Storage Tank Program
>
PR0231476
>
COMPLIANCE INFO_2011-2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/9/2024 1:14:37 PM
Creation date
6/23/2020 6:49:16 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2011-2012
RECORD_ID
PR0231476
PE
2361
FACILITY_ID
FA0000684
FACILITY_NAME
QUIK STOP MARKET #3125
STREET_NUMBER
1580
Direction
W
STREET_NAME
MAIN
STREET_TYPE
ST
City
RIPON
Zip
95366
APN
259-090-21
CURRENT_STATUS
01
SITE_LOCATION
1580 W MAIN ST
P_LOCATION
05
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231476_1580 W MAIN_2011-2012.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
210
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Model: <br />Serial #: <br />El1�posOR tttewn- Model: <br />❑ fail Serial #: <br />❑ NA :.. . <br />❑ Drop tube with mechanical overfill at 95% <br />lest #: <br />SERVICE <br />et O minimum 5 gallon" <br />11 ❑ 1 hour ostatic ❑ ancon TS -STS <br />❑ Caldwellystem ❑ Other <br />Spill bucket © minimum 5 gallon } <br />Cl ❑ 1 hour hydrostatic ❑ Incon TS -STS' <br />❑ Caldwell System ❑ Other <br />Primary piping testing <br />❑ psi <br />minutes <br />Secondary containment testing for: <br />UDC(s) ` k Piping <br />SUMP(s) UST(s)' <br />❑ Testing for the above components are next due bym <br />Note: Please be aware that 2' containment cca*a wb are requhed to be tested upon <br />In dallabon, 8 months after, and every 38 months thereatier <br />❑ Cold start of monitoring panel <br />an Name: G servic`e'1 crar <br />C <br />p <br />c <br />SERVICE <br />Leak detector <br />❑ mechanical Model } b. x <br />❑ electronic Serial#: .. <br />a <br />iline tes rammed <br />` <br />'.Leak de • �� r - ` <br />❑ m'�chanica Model: <br />❑ elec nlc Serial #: <br />❑ line test Droarammed <br />„ <br />sensorcool > <br />❑'hive shutdown Model <br />Qjr <br />❑ fail safe Serial #: <br />Model: <br />Serial #: <br />El1�posOR tttewn- Model: <br />❑ fail Serial #: <br />❑ NA :.. . <br />❑ Drop tube with mechanical overfill at 95% <br />lest #: <br />SERVICE <br />et O minimum 5 gallon" <br />11 ❑ 1 hour ostatic ❑ ancon TS -STS <br />❑ Caldwellystem ❑ Other <br />Spill bucket © minimum 5 gallon } <br />Cl ❑ 1 hour hydrostatic ❑ Incon TS -STS' <br />❑ Caldwell System ❑ Other <br />Primary piping testing <br />❑ psi <br />minutes <br />Secondary containment testing for: <br />UDC(s) ` k Piping <br />SUMP(s) UST(s)' <br />❑ Testing for the above components are next due bym <br />Note: Please be aware that 2' containment cca*a wb are requhed to be tested upon <br />In dallabon, 8 months after, and every 38 months thereatier <br />❑ Cold start of monitoring panel <br />
The URL can be used to link to this page
Your browser does not support the video tag.