Laserfiche WebLink
In Section H below, describe how and when these deficiencies were or will be corrected. <br />G. LINE LEAK DETECTORS (LLD): ❑ Check this box if LLDs are not installed. <br />Complete the following checklist: <br />Yes ❑ No* For equipment start-up or annual equipment certification, was a leak simulated to verify LLD performance? <br />El N/A (check all that apply) Simulated leak rate: 3 g.p.h.; El 0.1 g.p.h.; El 0.2 g.p.h. <br />■ Yes ElNo* Were all LLDs confirmed operational and accurate within regulatory requirements? <br />El Yes ElNo* Was the testing apparatus properly calibrated? <br />■ Yes El No * For mechanical LLDs, does the LLD restrict product flow if it detects a leak? <br />El NIA <br />❑ Yes ElNo* For electronic LLDs, does the turbine automatically shut off if the LLD detects a leak? <br />■ N/A <br />El Yes ElNo* For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system is disabled <br />■ N/A or disconnected? <br />El Yes ElNo* For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system malfunctions <br />■ N/A or fails a test? <br />El Yes El No * For electronic LLDs, have all accessible wiring connections been visually inspected? <br />■ N/A <br />■ Yes ElNo* Were all items on the equipment manufacturer's maintenance checklist completed? <br />In Section H below, describe how and when these deficiencies were or will be corrected. <br />❑ <br />Yes <br />❑ <br />Sall" 7 <br />MONITORING SYSTEM CERTIFICAW*'_�, <br />CERTIFICATION/ TEST DATE: June 9, 2017 <br />A1. FACILITY <br />Name Quik Stop Market #125 <br />Address 1580 W. Main Street, Ripon, CA 95366 <br />Phone # 510-657-8500 <br />Contact Roger Batra <br />A2. OWNER <br />Name Quik Stop Mar �,1h_o r , <br />Address 4567 Enterprise Street, Fremoratr,CA �4 i38 <br />Phone # 510-657-8500 <br />Contact Debbie Markovich <br />Yes <br />ElNo* <br />Were all tank gauging probes visually inspected for damage and residue buildup? <br />El <br />Yes <br />ElNo* <br />F. IN -TANK GAUGING / SIR EQUIPMENT: N Check this box if tank gauging is used only for inventory control. <br />❑ Check this box if no tank gauging or SIR equipment is installed. <br />This section must be completed if in -tank gaugung equipment is used to perform leak detection monitoring. <br />Complete the following checklist: <br />El <br />Yes <br />❑ <br />No* <br />Was accuracy of system water level readings tested? <br />El <br />Yes <br />❑ <br />No * <br />Were all probes reinstalled properly? _ <br />El <br />_ <br />Yes <br />ElNo* <br />Were all items on the equipment manufacturer's maintenance checklist completed? <br />* <br />" <br />H. COMMENTS <br />❑ <br />Yes <br />❑ <br />No* <br />Has all input wiring been inspected for proper entry and termination, including testing for ground faults? <br />El <br />Yes <br />ElNo* <br />Were all tank gauging probes visually inspected for damage and residue buildup? <br />El <br />Yes <br />ElNo* <br />Was accuracy of system product level readings tested? <br />El <br />Yes <br />❑ <br />No* <br />Was accuracy of system water level readings tested? <br />El <br />Yes <br />❑ <br />No * <br />Were all probes reinstalled properly? _ <br />El <br />_ <br />Yes <br />ElNo* <br />Were all items on the equipment manufacturer's maintenance checklist completed? <br />© 2017 Walton Engineering, Inc <br />Page 3 of 3 <br />