Laserfiche WebLink
SAN JOAQUIN COUNTY ENVIRONMENTAL HEALTH DEPARTMENT <br /> UNDERGROUND STORAGE TAN1K <br /> MONITORING PLAN (Page 2 of 2) <br /> VI.UNDER DISPENSER CONTAINMENT(UDC)MONITORING <br /> 1. UDC MONITORING IS PERFORMED USING THE FOLLOWING METHOD 490-54 <br /> 490-Sbb <br /> ❑ 1.CONTINUOUS ELECTRONIC MONITORING2.FLOAT AND CHAIN ASSEMBLY ❑ 3.ELECTRONIC STAND-ALONE <br /> ❑4.NO DISPENSERS ❑99.OTHER(Specify): <br /> PANEL MANUFACTURER: 490-55 MODEL#: _ 490-56' <br /> LEAK SENSOR MANUFACTURER: �- —__ -- ~� 490-57 ' MODEL#(S): — 490-59 <br /> DETECTION OF A LEAK INTO THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS ❑ a.YES b.NO 490-59 <br /> UDC LEAK ALARM TRIGGERS AUTOMATIC PUMP SHUTDOWN ❑ a.YES ,/Urg.NO 490.60. <br /> FAILURE/DISCONNECTION OF UDC MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. C3 a.YES Ltf b.NO 49MI <br /> UDC MONITORING STOPS THE FLOW OF PRODUCT AT THE DISPENSER a.YES ❑b.NO 490-62 <br /> 2.UDC CONSTRUCTION IS el' ❑2.DOUBLE-WALLED 490 <br /> -63 <br /> IF DOUBLE WALLED: <br /> UDC INTERSTITIAL SPACE IS MONITORED BY: ❑1.LI UID_ ❑2.PRESSURE_❑3.VACUUM — <br /> A LEAK WITHIN THE SECONDARY CONTAINMENT OF THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS ❑a.YES ❑b.NO- 490-64b <br /> VII.PERIODIC SYSTEM TESTING <br /> 1. ELD TESTING: THIS FACILITY HAS BEEN NOTIFIED BY THE STATE WATER RESOURCES CONTROL BOARD THAT ENHANCED 490-65. <br /> LEAK DETECTION(ELD)MUST BE PERFORMED. PERIODIC ELD IS PERFORMED EVERY 36 MONTHS AS RE UIRED. 23 CCR2644.1 <br /> SECONDARY CONTAINMENT COMPONENTS ARE TESTED EVERY 36 MONTHS. 490-66 <br /> -❑3.SPILL BUCKETS ARE TESTED ANNUALLY. 490-6 <br /> VIII.RECORDKEEPING <br /> The ollowing monitoringlr��raiggtenance records are kept for this facility: <br /> [��Alarm logs 490-68a LJTVisual Inspection Records 490-68b ❑Tank integrity testing results 490.6sc <br /> ❑SIR testing results(and supporting documentation records). 490-bad ❑ Tank gauging insults(and supporting documentation records). 490-6se <br /> ❑ATG Testing results(and supporting documentation records).490-eaf ❑ Corrosion Protection 60-day logs 490-aa <br /> (Equipment maintenance and calibration records. 490-6sh <br /> IX.TRAINING <br /> Personnel with UST monitoring responsibilities are familiar with all of the following documents relevant to their job duties. 49o-6% <br /> REFEI;ENCE DOCUMENTS MAINTAINED AT FACILITY(Check all that apply) <br /> U HIS UNDERGROUND STORAGE TANK MONITORING PLAN(Required)49o-6% <br /> OPERATING MANUALS FOR ELECTRONIC MONITORING EQUIPMENT(Required)490.69c <br /> ❑ CALIFORNIA UNDERGROUND STORAGE TANK REGULATIONS 490-69d <br /> ❑ CALIFORNIA UNDERGROUND STORAGE TANK LAW 49o-6% <br /> ❑ STATE WATER RESOURCES CONTROL BOARD (SWRCB) PUBLICATION: "HANDBOOK FOR TANK OWNERS - MANUAL AND <br /> STATISTICAL INVENTORY RECONCILIATION"490.69E <br /> ❑ WRCB PUBLICATION:"UNDERSTANDING AUTOMATIC TANK GAUGING SYSTEMS"490-69s <br /> OTHER(Specify):M69h,M69i -Written Procedures&Best Management Practices for Monitoring Double Containment UST Systems" <br /> This facility has a"Designated UST Operator"who has passed the California UST System Operator Exam administered by the International Code Council(ICC). <br /> The"Designated UST Operator"will train facility employees in the proper operation and maintenance of the UST systems annually,and within 30 days of hire.This <br /> training will include,but is not limited to,the following: <br /> Operation of the UST systems in a manner consistent with the facility's best management practices <br /> ➢ The facility employee's role with regard to the monitoring equipment as specified in this UST Monitoring Plan <br /> ➢ The facility employee's role with regard to spills and overfills as specified in the UST Response Plan <br /> Names of contact person(s)for emergencies and monitoring alarms.49o-7o <br /> X. COMMENTS/ADDITIONAL INFORMATION <br /> Provide additional comments here or indicate how many pages with additional information on specific monitoring procedures are attached to this plan.49o-71 <br /> OVERFILL PREVENTION(OR PROTECTION)IS ACCOMPLISHED BY THE FOLLOWING TWO(2)METHODS: <br /> 1. MECHANICAL OVERFILL VALVES INSTALLED IN DROP TUBES,SET TO TRIP AT 95%FULL LEVEL. <br /> 2. SERVICE PENETRATIONS TO THE PRIMARY CONTAINMENT ARE CONTAINED WITHIN SUMPS,INCLUDING FILL&VAPOR RETURN. <br /> XI.PERSONNEL RESPONSIBILITIES <br /> The UST Owner/Operator is responsible for ensuring that:1)the daily/routine UST monitoring activities and maintenance of UST leak detection equipment covered by <br /> this plan occurs,2)all conditions that indicate a possible release are investigated,and 3)all monitoring records are maintained properly. <br /> The following person(s)are responsible for performing the monitoring and equipment maintenance: <br /> NAME BHUPINDER&AMARJIT GILL 490-72 TITLE FRANCHISEES 490-73 <br /> NAME SAMI ALKOUSSA 490-74 TITLE DISTRICT ADVISOR 490-75 <br /> The Designated Operator shall perform a monthly visual inspection of the facility,provide a report to the owner/operator,and inform the owner/operator of any <br /> conditions that need follow-up action. <br /> XII.OWNER/OPERATOR SIGNATURE <br /> CERTIFICATION:I certify that the info ation provided herein is true and accurate to the best of my knowledge. <br /> APPLICANT SIGNATURE77 <br /> 490-76 DATE: 490. <br /> OCTOBER 7,2008 <br /> iv f <br /> APPLICANT NAME(print): 490-78 APPLICANT TITLE: 490-79 <br /> MIKE KARVELOT DIRECTOR OF ENVIRONMENTAL AFFAIRS <br /> UPCF UST-D(12/2007)3/4Aff*Vllf-d WAAM 4117/0 <br />