My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2013-2017
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
1580
>
2300 - Underground Storage Tank Program
>
PR0231476
>
COMPLIANCE INFO_2013-2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/9/2024 1:49:45 PM
Creation date
6/23/2020 6:49:17 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2013-2017
RECORD_ID
PR0231476
PE
2361
FACILITY_ID
FA0000684
FACILITY_NAME
QUIK STOP MARKET #3125
STREET_NUMBER
1580
Direction
W
STREET_NAME
MAIN
STREET_TYPE
ST
City
RIPON
Zip
95366
APN
259-090-21
CURRENT_STATUS
01
SITE_LOCATION
1580 W MAIN ST
P_LOCATION
05
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231476_1580 W MAIN_2013-2017.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
463
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
og :4 1 o Levym ig ivi teig aan <br />CERTIFICATION / TEST DATE: June 10, 2016 APR 16 2016 <br />{^in✓Yy 1, ^.'.� `r^-? .4,�, ,a� .<., .s a <br />nMMT <br />DE IMP-TWOMM <br />A7. FACILITY <br />Yes <br />A2. OWNER <br />Name Quik Stop Market #125 <br />Has all input wiring been inspected for proper entry and termination, including testing for ground faults? <br />Name Quik Stop Markets, Inc. <br />Address 1580 W. Main Street, Ripon, CA 95366 <br />Address 4567 Enterprise Street, Fremont, CA 94538 <br />Phone # 510-657-8500 <br />= <br />Phone # 510-657-8500 <br />Contact Roger Batra <br />No* <br />Contact Debbie Markovich <br />Win -�1.19r V�INWI� ,��i� _ "' ` - ` X°k 11?h`,Ie� 1I�4� �.'� �t ora,. �titi ""`5�;='a:�' ?�; ,.r.�.,.-._._�._ -.. _... �7 _@1 7T 7 -_*77, 7M . 4.. 7 m� <br />1 F. IN -TANK GAUGING / SIR EQUIPMENT: <br />❑ <br />■ Check this box if tank gauging is used only for inventory control. <br />Was accuracy of system product level readings tested? <br />❑ <br />❑ Check this box if no tank gauging or SIR equipment is installed. <br />This section must be completed if in -tank gaugung equipment <br />No* <br />is used to perform leak detection monitoring. <br />Complete the following checklist: <br />Yes <br />❑ <br />* In Section H below, describe how and when these deficiencies were or will be corrected. <br />G. LINE LEAK DETECTORS (LLD): ❑ Check this box if LLDs are not installed. <br />Complete the following checklist: <br />ai:`c.;...7 ::..____EMMUI <br />nMMT <br />DE IMP-TWOMM <br />❑ <br />Yes <br />❑ <br />No* <br />Has all input wiring been inspected for proper entry and termination, including testing for ground faults? <br />For equipment start-up or annual equipment certification, was a leak simulated to verify LLD performance? <br />❑ <br />NIA <br />❑ <br />Yes <br />❑ <br />No* <br />Were all tank gauging probes visually inspected for damage and residue buildup? <br />❑ <br />Yes <br />❑ <br />No* <br />Was accuracy of system product level readings tested? <br />❑ <br />Yes <br />❑ <br />No* <br />Was accuracy of system water level readings tested? <br />❑ <br />Yes <br />❑ <br />No * <br />Were all probes reinstalled properly? <br />❑ <br />Yes <br />❑ <br />No* <br />Were all items on the equipment manufacturer's maintenance checklist completed? <br />* In Section H below, describe how and when these deficiencies were or will be corrected. <br />G. LINE LEAK DETECTORS (LLD): ❑ Check this box if LLDs are not installed. <br />Complete the following checklist: <br />ai:`c.;...7 ::..____EMMUI <br />✓hep:,'.. I <br />°..1M. <br />■ <br />Yes <br />❑ <br />No* <br />For equipment start-up or annual equipment certification, was a leak simulated to verify LLD performance? <br />❑ <br />NIA <br />(check all that apply) Simulated leak rate: ■ 3g.p.h.; ❑ 0.1 g.p.h.; ❑ 0.2g.p.h. <br />■ <br />Yes <br />❑ <br />No* <br />Were all LLDs confirmed operational and accurate within regulatory requirements? <br />■ <br />Yes <br />❑ <br />No* <br />Was the testing apparatus properly calibrated? <br />■ <br />Yes <br />❑ <br />No* <br />For mechanical LLDs, does the LLD restrict product flow if it detects a leak? <br />❑ <br />N/A <br />z <br />❑ <br />Yes <br />❑ <br />No* <br />For electronic LLDs, does the turbine automatically shut off if the LLD detects a leak? <br />■ <br />NIA <br />❑ <br />Yes <br />❑ <br />No* <br />For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system is disabled <br />■ <br />N/A <br />or disconnected? <br />i <br />❑ <br />Yes <br />❑ <br />No* <br />For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system malfunctions <br />® <br />N/A <br />or fails a test? <br />❑ <br />Yes <br />❑ <br />No* <br />For electronic LLDs, have all accessible wiring connections been visually inspected? <br />® <br />N/A <br />■ <br />Yes <br />❑ <br />No* <br />Were all items on the equipment manufacturer's maintenance checklist completed? <br />* In Section H below, describe how and when these deficiencies were or will be corrected. <br />MW <br />H. COMMENTS <br />Page 3 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.