Laserfiche WebLink
SAN JOAQUIN. COUNTY ENVIRONMENTAL HEALTH DEPARTMENT . <br />UNDERGR D STORAGE TANK PROGRAM WORKSHEET mf <br />FACILITY NAME <br />FACILITY CONTACT NAME <br />J'A CP <br />1999 <br />2000 <br />FACILITY ADDRESS <br />SITE PHONE # WITH <br />EA CODE <br />$500 FEE INCLUDES FACILITY FEE + 1 TANK <br />APPLICANT MAILING ADDRESS <br />CITY v <br />STATE <br />ZIP CODE <br />115I(ZI) <br /># OF TANKS AT SITE <br />6Ct D� <br />CA <br />.��� <br />-9 <br />3 - <br />APPLICANT BILLING NAME <br />TANK ID # (s): <br />APPLICANT CONTACT NAME <br />1999 <br />2000 <br />2001 <br />1141,-21 <br />h�417 <br />2004 <br />$500 FEE INCLUDES FACILITY FEE + 1 TANK <br />APPLICANT MAILING ADDRESS <br />$ <br />APPLICANT PHONE # WITH <br />EA CODE <br />115I(ZI) <br />$ <br />91 <br />3-96 <br />IV <br />-9 <br />CITY <br />STATE <br />ZIP CODE <br />CIRCLE WORK TO BE DONE• <br />Closure Installation Repair Retrofit <br />_9'�` -1 <br />ACTIVE FACILITY <br />TANK ID # (s): <br />CLOSURE FEE = $279 / TANK <br />1999 <br />2000 <br />2001 <br />2002 <br />2003 <br />2004 <br />$500 FEE INCLUDES FACILITY FEE + 1 TANK <br />($170) X (#tanks) <br />$ <br />UNAUTHORIZED RELEASE EVALUATION FEE = $ 93 / HOUR <br />$ <br />SAMPLING INSPECTION FEE = $ 93/ HOUR <br />$125 PER TANK AFTER FIRST TANK <br />$ <br />TANK PENALTY ASSESSED <br />$ <br />TANK SURCHARGE = $15 / TANK <br />$ <br />STATE SURCHARGE FOR FACILITIES NOT ALREADY ON INVENTORY IN A CUPA PROGRAM =$24.00/ FACILITY <br />PERMANENT CLOSURE <br />Removal or Permitted Closure in Place <br />TANK ID # (s): <br />CLOSURE FEE = $279 / TANK <br /># TANKS X $279 = <br />TEMPORARY CLOSURE <br />Plan Review and Inspections) <br />TANK ID # (s) : <br />TEMPORARY CLOSURE FEE = $279 / FACILITY <br />Check and Construction I <br />TANK ID # (s) : I PLAN CHECK FEE = $744 / FACILITY <br />REPAIR PLAN CHECK <br />TANK ID # (s): <br />TANK RETROFIT REPAIR FEE = $279 / FACILITY (use for monitoring equipment, spill buckets, tank sumps, misc.) <br />$ <br />2-7 <br />PIPING REPAIR FEE = $279 / FACILITY (use for piping, under -dispenser containment, ect.) <br />$ <br />MISCELLANEOUS <br />$ <br />TRANSFER FEE _ $ 20 <br />$ <br />CONSULTATION FEE = $ 93/ HOUR <br />$ <br />UNAUTHORIZED RELEASE EVALUATION FEE = $ 93 / HOUR <br />$ <br />SAMPLING INSPECTION FEE = $ 93/ HOUR <br />ALL FEES ARE BASED ON THE $93 HOURLY RATE. TIME THAT EXCEEDS FEES PAID WILL BE BILLED TO APPLICANT. <br />OFFICE USE ONLY <br />BY I DATE <br />SR <br />EH 23 032 (REVISED <br />