Laserfiche WebLink
Jul 31 03 11:02a Fozen Hill 559 881457 p.6 <br />F. In -Tank Gauging / SXR Equipment: <br />Check this box if tank gauging is used only for inventor;✓ control. <br />® Check this box if no tank gauging or SIEZ equipment is installed. <br />Tl -.:s section must be con:p';eted if in -tank gau,-ing equipmvrtt is s;sed to PC, -form leak detection moritoting. <br />�0^771 a±e the following checklist: <br />- Yes ❑ No* I Has all input wiring, inse-^ed for r <br />_ proper entry and tetnrrinat:or., including testing for ground faults? <br />D Yes ❑ No* W:!re all tank eauging probes visually inspected for damace and residue buildup? <br />Y'es ❑ No* Was accuracv ofsystem product level readings tested? <br />d Yes ❑ NO 'A'as accuracy of system .%%•ater level readings tested'? <br />_l Yes ❑ No* Were all probes reinstalled properly? <br />Yes ❑ Na* Were all items on the equipment manufacturer's maintenance checklist completed? <br />In the Section H, below, describe how and when these deficiencies were or will be corrected. <br />r. Line Leak Detectors (LLD): ❑ Check this box if LLDs are not installed. <br />'om Ietc the following checklist: <br />AYes ® No* For equipment start-up or annual equipment certification, was a leak simulated to verify LLD crformancc? <br />C3 N/A (Check all that apply) Simulated Ieak rate: 03 g.p.h.; ❑ 0.1 p <br />g.p.h ; ❑ 0.2 g.p.h. <br />Yes ❑ No* Were all LLDs confirmed operational and accurate within regulatory requirements? <br />Yes D No* Was -the testing apparatus properly calibrated? <br />Yes O No* For mechanical LLDs, does the LLD restrict product flow if it detects a leak? <br />❑ N/A <br />Yes ❑ No* For eIectronic LLDs, does the turbine automatically shut off if the LLD detects a Ieak? <br />0 N/A <br />Yes ❑ No* For electronic LLDs, does the turbine automaticall <br />13 N/A or disconnected? y shut Off if any portion of the monitoring system is disabled <br />Yes ❑ No* For electronic LLD s, does the turbine automatically shut off if any portion of the monitoring system malfunctions <br />a N/A or fails a test? <br />Yes ❑ No* For electronic LLDs, have all accessible wiring connections been visually inspected? <br />0- N/A <br />'Yes ❑ No* Were all items on the equipment manufacturer's maintenance checklist comleted? <br />p <br />n the Section H, below, describe how and when these deficiencies were or will be corrected. <br />Comments: <br />Page 3 of 3 <br />03101 <br />