My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2008-2012
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
J
>
JACKSON
>
2501
>
2300 - Underground Storage Tank Program
>
PR0231488
>
COMPLIANCE INFO_2008-2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/12/2021 11:12:52 AM
Creation date
6/23/2020 6:49:29 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2008-2012
RECORD_ID
PR0231488
PE
2361
FACILITY_ID
FA0003910
FACILITY_NAME
H&M - BW #98
STREET_NUMBER
2501
STREET_NAME
JACKSON
STREET_TYPE
AVE
City
ESCALON
Zip
95320
CURRENT_STATUS
01
SITE_LOCATION
2501 JACKSON AVE
P_LOCATION
06
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231488_2501 JACKSON_2008-2012.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
273
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
F-1 <br />AL <br />t1WIED PROGRAM CONSOLIDATED FORIW <br />UNDERGROUND STORAGE TANK <br />MONITORING PLAN - (Page 2 of 2) <br />;VI. UNDER DISPENSER CONTAINMENT (UDC) MONITORING (Checkall <br />that.apply) <br />UDC MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S) <br />❑ 1. CONTINUOUS ELECTRONIC MONITORING Z 2. FLOAT AND CHAIN ASSEMBLY ❑ 3. ELECTRONIC STAND-ALONE <br />490-54a. <br />❑ 4. NO DISPENSERS ❑ 99. OTHER (Specify) <br />490-54b. <br />......... ---._._........._........ ._.....-.....-............................. _..................................................... _....._._......._._.._....__........._.......__. _. <br />LEAK MONITOR MANUFACTURER: 490-55. MODEL <br />LEAK SENSOR MANUFACTURER: 490-57. MODEL #(S): <br />490-58. <br />DETECTION OF A LEAK INTO THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS. ❑ a. YES ❑ b. N0 <br />490.59. <br />UDC LEAK ALARM TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑ a. YES ❑ b. N0 <br />490.60. <br />FAILURE/DISCONNECTION OF UDC MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑ a. YES ❑ b. NO <br />490-61. <br />UDC MONITORING STOPS THE FLOW OF PRODUCT AT THE DISPENSER. ❑ a. YES ❑ b. NO <br />490.62. <br />... .... _.... -.__........................... ---..__............................ ---.............................................. -..................... _._.. - __.__ __..-_..--............................................ _.......................... ........... ......._......_........__..-..............._........__._...._.._... ----.._._._.._..._..._._-..._-.-... <br />UDC CONSTRUCTION IS: Z 1. SINGLE WALL ❑ 2. DOUBLE WALL <br />490-63. <br />IF DOUBLE WALL: <br />490-64a. <br />UDC INTERSTITIAL SPACE IS MONITORED BY: ❑ a. LIQUID ❑ b. PRESSURE ❑ c. VACUUM <br />A LEAK WITHIN THE SECONDARY CONTAINMENT OF THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS. ❑ a. YES ❑ b. NO <br />490-64b. <br />VII. PERIODIC SYSTEM TESTING <br />❑ 1. BLD TESTING: THIS FACILITY HAS BEEN NOTIFIED BY THE STATE WATER RESOURCES CONTROL BOARD THAT ENHANCED <br />490-65. <br />LEAK DETECTION ELD MUST BE PERFORMED. PERIODIC ELD IS PERFORMED EVERY 36 MONTHS AS REQUIRED. 123 CCR §2644.11 <br />Z 2. SECONDARY CONTAINMENT COMPONENTS ARE TESTED EVERY 36 MONTHS. <br />490-66. <br />Z 3. SPILL BUCKETS ARE TESTED ANNUALLY. <br />490-67 <br />VIII. RECORD KEEPING <br />The following monitoring/maintenance records are kept for this facility: <br />490.68. <br />Z a. ALARM LOGS Z b. VISUAL INSPECTION RECORDS ❑ c. TANK INTEGRITY TESTING RESULTS <br />❑ d. SIR TESTING RESULTS (and supporting documentation records) ❑ e. TANK GAUGING RESULTS (and supporting documentation records) <br />❑ f. ATG TESTING RESULTS (and supporting documentation records) ❑ g. CORROSION PROTECTION 60 -DAY LOGS <br />Z h. EQUIPMENT MAINTENANCE AND CALIBRATION RECORDS <br />NING <br />Z Personnel with UST monitoring responsibilities are familiar with all of the following documents relevant to their job duties: <br />490-69a. <br />REFERENCE DOCUMENTS MAINTAINED AT FACILITY (Check all that apply) <br />Z THIS UNDERGROUND STORAGE TANK MONITORING PLAN (Required) <br />490-69b. <br />Z OPERATING MANUALS FOR ELECTRONIC MONITORING EQUIPMENT (Required) <br />490-69c. <br />❑ CALIFORNIA UNDERGROUND STORAGE TANK REGULATIONS <br />490-69d. <br />❑ CALIFORNIA UNDERGROUND STORAGE TANK LAW <br />490-69e. <br />❑ STATE WATER RESOURCES CONTROL BOARD (SWRCB) PUBLICATION: "HANDBOOK FOR TANK OWNERS - MANUAL AND <br />490-69f. <br />STATISTICAL INVENTORY RECONCILIATION" <br />❑ SWRCB PUBLICATION: "UNDERSTANDING AUTOMATIC TANK GAUGING SYSTEMS" <br />490-69g. <br />❑ OTHER (Specify): <br />490-69h. <br />490.691. <br />Z This facility has a "Designated UST Operator" who has passed the California UST System Operator Exam administered by the International Code Council <br />490-70. <br />(ICC). The "Designated UST Operator" will train facility employees in the proper operation and maintenance of the UST systems annually, and within 30 <br />days of hire. This training will include, but is not limited to, the following: <br />➢ Operation of the UST systems in a manner consistent with the facility's best management practices. <br />➢ The facility employee's role with regard to the monitoring equipment as specified in this UST Monitoring Plan. <br />➢ The facility employee's role with regard to spills and overfills as specified in the facility's UST Response Plan. <br />➢ Name(s) of contact person(s) for emergencies and monitoring alarms. <br />X. GOMMENTWADDITIONAL INFORMATION <br />Provide additional comments here or indicate how many pages with additional information on specific monitoring procedures are attached to this plan. <br />490-71. <br />OVERFILL PREVENTION: (FLOAT) SIZE: 4" (FLAPPER VALVE) <br />MAX OR LABEL OVERFILL LIMIT: 90% / HIGH PRODUCT LIMIT: 95% <br />XL PERSONNEL RESPONSIBILITIES <br />The UST Owner/Operator is responsible for ensuring that: 1.) the daily/routine UST monitoring activities and maintenance of UST leak detection equipment covered <br />by this plan occurs; 2.) all conditions that indicateapossible release are investigated;.and 3_) all monitoring records are maintained properly. <br />THE FOLLOWING PERSON(S) ARE RESPONSIBLE FOR PERFORMING THE MONITORING AND EQUIPMENT MAINTENANCE: <br />NAME: KAREN ARNAIZ 490-72. TITLE: DESIGNATED OPERATOR <br />490-73. <br />NAME: HASSAN AHMED 490-74. TITLE: STORE MANAGER <br />490-75, <br />The Designated UST Operator shall perform a monthly visual inspection of the facility, provide a report to the owner/operator, and inform the owner/operator of any <br />conditions that need follow-up action. <br />.''OWNER/OPERATOR SIGNATURE <br />CERTIFICATION: I certify that the inAqa iopprovided herein is true and accurate to the best of my knowledge. <br />APPLICANT SIGNATURE fDATE: <br />490-77 <br />10/9/2008 <br />REPRESENTING: ❑ 1. Tank Owner/Operator ❑ 2. Facility O er/O erator 0 3. Authorized Re resents o e oft weer 490-76. <br />V <br />UPCF UST -D (12/2007) - 4/7 www.unidocs.org <br />
The URL can be used to link to this page
Your browser does not support the video tag.