My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2008-2012
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
J
>
JACKSON
>
2501
>
2300 - Underground Storage Tank Program
>
PR0231488
>
COMPLIANCE INFO_2008-2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/12/2021 11:12:52 AM
Creation date
6/23/2020 6:49:29 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2008-2012
RECORD_ID
PR0231488
PE
2361
FACILITY_ID
FA0003910
FACILITY_NAME
H&M - BW #98
STREET_NUMBER
2501
STREET_NAME
JACKSON
STREET_TYPE
AVE
City
ESCALON
Zip
95320
CURRENT_STATUS
01
SITE_LOCATION
2501 JACKSON AVE
P_LOCATION
06
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231488_2501 JACKSON_2008-2012.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
273
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UNDER DISPENSER CONTAINMENT UDC TESTING <br />Test Method By: O Manufacturer 0 Industry Standard o Professional Engr O Other (see below) <br />Test Method Uses: O Pressure o vacuum • Hydrostatic o Other (see below) <br />Measuring Equipment Used: INCON TS -STS (Electronic Sump Test System) <br />Descrintion Disn * 9/2 Disn it 3/4 <br />UDC manufacturer <br />Bravo <br />Bravo <br />UDC material <br />Steel <br />Steel <br />UDC depth (inches) <br />9" <br />9" <br />Height from UDC bottom to highest <br />piping penetration <br />Bottom <br />Bottom <br />Height from UDC bottom to lowest <br />electrical penetration <br />Bottom <br />Bottom <br />Condition of UDC prior to testing <br />Dry <br />Dry <br />Portion of UDC tested <br />Entire <br />Entire <br />Type of shut -down present <br />Float <br />Float <br />Was sensor removed for testing? <br />N/A <br />N/A <br />Was sensor properly replaced after testing? <br />N/A <br />N/A <br />Depth of water level from UDC bottom (in.) <br />6 <br />6 <br />Wait time for water level to stabilize (hr:min) <br />0:05 <br />0:05 <br />Test start time <br />11:27 AM <br />11:27 AM <br />Initial Probe Reading <br />1.9429 <br />1.6580 <br />Test end time <br />11:42 AM <br />11:42 AM <br />Final Probe Reading <br />1.9428 <br />1.6599 <br />Test duration (hr:min) <br />0:15 <br />0:15 <br />Change in water level (± 0.0000 inches) <br />-0.0001 <br />0.0019 <br />Pass/Fail threshold (±0.0020 inches / } Hr.) <br />0.0020 <br />0.0020 <br />TEST RESULT <br />PASS <br />PASS <br />Comments: <br />© 2011 Walton Engineering, Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.