Laserfiche WebLink
t <br /> UST Program: Monitoring Plan for UST Tank...: CERS Regulator https://cersregulator.calepa.ca.gov/Business/49846/Facility/10181511... <br /> 0 <br /> California Environmental Reporting System:Regulator Elena Manm's A¢atnt Sian Out Dols Rep= BO <br /> UST Monitoring Plan: KINIK S (B&W PETROLEUM) <br /> Home )) Subnrittal Search N Submittal:4/1/2014(10181511) D LIST UST Monitoring Plan(Accepted) <br /> SubmlElement Histo ................................................-.......................- ---...__...... --..._..._...._.. ----._.....— -......_....- —._....................................................._._.._._..............._...._._.__...-- <br /> [S. rn,ttrdbforCERS ID 10181611 on4/1/2014 1:41PM byR..O..H.D...A_NENRYof KWIKubmittal was Accepted on 6/23/2014 by NG,MLLY for San Joaquin County Environmental Health <br /> to <br /> Copy Monitoring Plan Information <br /> This section would allow the user to copy Monitoring Plan information from another tank.This option would only appear if this facility had one or more existing tanks <br /> with Monitoring Plans. <br /> Facility Information Equipment Testing and Preventive Maintenance Monitoring Locations <br /> KWIK SERVE(B&W PETROLEUM) I Monitoring Equipment Serviced Site Plot Plan Submitted <br /> 2501 JACKSON AVE <br /> Annually Site Plan PreNousy Submitted <br /> ESCALON, CA 95320 <br /> TankMonitoring is Performed Using the Following Method(s).............----......................_....__..._....._...._........................................................................................-.............................._._.__....................._.._..._.._........._...— <br /> Yes Continuous Electronic Tank Monitoring <br /> Secondary Containment System Monitor Panel Manufacturer Leak Sensor Manufacturer <br /> Dry VEEDER ROOT VEEDER ROOT <br /> Monitor Panel Model Leak Sensor Model# <br /> TLS 350 420 <br /> No Automatic Tank Gauging <br /> No Monthly Statistical Inventory Reconciliation <br /> No Weekly Manual Tank Gauge k No Tank Integrity Testing <br /> FN. Other Monitodng <br /> i <br /> --Pipe Monitoring is Performed Using the Fallowing Method(sy.......---.................._..._.__....... ._........._.......-.-.................................................................. ._..._................__...................................................................._..__..._....--_._.._ <br /> Yes Continuous Monitoring of Piping Secondary Containment <br /> Piping Secondary Containment Panel Manufacturer Leak Sensor Manufacturer <br /> Dry VEEDER ROOT VEEDER ROOT <br /> Panel Model# Leak Sensor Model <br /> TLS-350 208 <br /> Leak Alarm Triggers Automatic Pump Shutdown <br /> Yes <br /> Failure/Disconnect Triggers Pump Shutdown <br /> Yes <br /> Yes Mechanical Line Leak Detector Performs 3 GPH Leak Test <br /> MLLD Manufacturer MLLD Model <br /> VMA LD2000 <br /> No Electronic Line Leak Detector Performs 3 GPH Leak Test <br /> No Pipeline Integrity Testing# No Visual Pipeline Monitoring <br /> Pb Sutton Piping Meets Exemption Criteria <br /> No No Regulated Piping Per Health and Safety Code,Division 20,Chapter 6.7 Is Connected To The Tank System <br /> No Other Pipeline Monitoring <br /> ............. ...... ............ ......... .............. ...................... _.... <br /> CERS Help Settings Notiflcations C <br /> 1 of 2 8/6/2014 8:21 AM <br />