Laserfiche WebLink
UST Program Monitoring Plan for UST Tank...• CERS Regulator https:Hcersregulator.SAepa.ca.gov/Business/49846/Facility/101 81511... <br /> IF <br /> California Environmental Reporting System:Regulator Elena Manm's Account Sign 0 Tools Rets Ho <br /> UST Monitoring Pian: KMK SERVE(B&W P R EU ) <br /> Home )) Submittal Search D Submittal:4/1/2014(10181511) » UST:UST monitoring Plan(Accepted) <br /> Submittal Element History. _... --------.................................__............_..._--- -- ------ --._........---........._..........._...-------- <br /> - <br /> Submitted for CERS ID 10181511 on 4/1/2014 1:41 PM by R.O...HDA._HENRYof KWIK_..S..ERVE_.(B&VU._PETROLEUM),_(ESCAI QN,_CA) <br /> Submittal was Accepted on 6/23/2014 by NG,W/LLYfor San Joaquin County Environmental Health <br /> to, <br /> Copy Monitoring Plan Information <br /> This section would allow the user to copy Monitoring Plan information from another tank.This option would only appear if this facility had one or more existing tanks <br /> with Monitoring Plans. <br /> Facility Information Equipment Testing and Preventive Maintenance -Monitoring Locations <br /> KWIK SERVE(B&W PETROLEUR ( Monitoring Equipment Serviced Site Plot Plan Submitted <br /> 2501 JACKSON AVE Annually I Site Plan Previously Subrritled <br /> ESCALON, CA 95320 <br /> Tank Monitoring is Performed Using the Following Method(s)........ ......... ............... - --__._._ ........ ...............................................__ <br /> Yes Continuous Electronic Tank Monitoring <br /> Secondary Containment System Monitor Panel Manufacturer Leak Sensor Manufacturer <br /> I Dry VEEDER ROOT VEEDER ROOT <br /> Monitor Panel Model Leak Sensor Model# <br /> TLS-350 420 <br /> No Automatic Tank Gauging <br /> No Monthly Statistical Inventory Reconciliation <br /> No Weekly Manual Tank Gauge No Tank Integrity Testing <br /> No Other Monitoring <br /> PipeMonitoring is Performed Using the Following Method(s)..............--..............................................._..---.._...............................-- --._..._...._..._..-- —._._._......-......................................._..-- -...._..._ <br /> ......... <br /> Yes Continuous Monitoring of Piping Secondary Containment <br /> Piping Secondary Containment Panel Manufacturer Leak Sensor Manufacturer <br /> Dry VEEDER ROOT VEEDER ROOT <br /> Panel Model# Leak Sensor Model <br /> TLS-350 208 <br /> Leak Alarm Triggers Automatic Pump Shutdown <br /> Yes <br /> FallurelDisconnect Triggers Pump Shutdown <br /> Yes .................... ......... ......... <br /> Yes Mechanical Line Leak Detector Performs 3 GPH Leak Test <br /> MLLD Manufacturer MLLD Model <br /> RED JACKET FXIV/D <br /> No Electronic Line Leak Detector Performs 3 GPH Leak Test f <br /> Np Pipeline Integrity Testing 0 No Visual Pipeline Monitoring <br /> (,lp Suction Piping Meets Exemption Criteria <br /> Np No Regulated Piping Per Health and Safety Code,Division 20,Chapter 6.7 Is Connected To The Tank System <br /> No Other Pipeline Monkoring <br /> .................. ...... <br /> CERS Help Settings Notifications ___ E <br /> 1 of 2 8/6/2014 8:22 AM <br />