Laserfiche WebLink
- ,, <br /> P�SOunt,s Cp <br /> STATE OF CALIFORNIA : a <br /> STATE WATER RESOURCES CONTROL BOARD s� g <br /> UNDERGROUND STORAGE TANK PERMIT APPLICATION - FORM B � <br /> - eo <br /> • CSL IROP N+�. <br /> COMPLETE A SEPARATE FORM FOR EACH TANK SYSTEM. <br /> MARK ONLY ❑ 1 NEW PERMIT ❑ 3 RENEWAL PERMIT5 CHANGE OF INFORMATION ❑ 7 PERMANENTLY CLOSED ON SITE <br /> ONE ITEM ❑ 2 INTERIM PERMIT F–] 4 AMENDED PERMIT ;?� 6 TEMPORARY TANK CLOSURE ❑ 8 TANK REMOVED <br /> DBA OR FACILITY NAME WHERE TANK IS INSTALLED. <br /> I. TANK DESCRIPTION COMPLETE ALL ITEMS– SPECIFY IF UNKNOWN <br /> A OWNER'S TANK I.D.# 10 B. MANUFACTURED BY: <br /> C. DATE INSTALLED(MO/DAYNEAR) D. TANK CAPACITY IN GALLOONS:ZoLt <br /> II.TANK CONTENTS IF A-1 IS MARKED,COMPLETE ITEM C. wv <br /> A, 1 MOTOR VEHICLE FUEL ❑ 4 OIL B. C to REGULAR UNLEADED ❑ 3 DIESEL ❑ 6 AVIATION GAS <br /> F7 2 PETROLEUM ❑ 80 EMPTY ❑ t PRODUCT PREMIUM UNLEADED ❑ 4 GASAHOL ❑ 7 METHANOL <br /> ❑ 1c MIDGRADE UNLEADED ❑ 5 JET FUEL 8 M85 <br /> ❑ 3 CHEMICAL PRODUCT ❑ 95 UNKNOWN ❑ 2 WASTE ❑ 2 LEADED ❑ 99 OTHER(DESCRIBE IN ITEM D.BELOM <br /> D. IF(A.1)IS NOT MARKED, ENTER NAME OF SUBSTANCE STORED C.A.S.#: <br /> III. TANK CONSTRUCTION m!%K K ONE ITEM ONLY IN BOXES A,B,AND C,AND ALL THAT APPLIES IN BOX D AND E <br /> A. TYPE OF ❑ 1 DOUBLE WALL ❑ 3 SINGLE WALL WITH EXTERIOR LINER ❑ 5 INTERNAL BLADDER SYSTEM ❑ 95 UNKNOWN <br /> SYSTEM ❑ 2 SINGLE WALL ❑ 4 SINGLE WALL IN A VAULT ❑ 99 OTHER <br /> B. TANK ❑ 1 BARE STEEL ❑ 2 STAINLESS STEEL ❑ 3 FIBERGLASS ❑ 4 STEEL CLAD W/FIBERGLASS REINFORCED PLASTIC <br /> MATERIAL ❑ 5 CONCRETE ❑ 6 POLYVINYL CHLORIDE ❑ 7 ALUMINUM ❑ 8 100% METHANOL COMPATIBLEW/FRP <br /> (Primary Tank) ❑ 9 BRONZE ❑ 10 GALVANIZED STEEL 95 UNKNOWN 99 OTHER <br /> C.INTERIOR ❑ 1 RUBBER LINED \1712 ALKYD LINING ❑ 3 EPDXY LINING ❑ 4 PHENOLIC LINING <br /> LINING OR ❑ 5 GLASS LINING 6 UNLINED ❑ 95 UNKNOWN ❑ 99 OTHER <br /> COATING IS LINING MATERIAL COMPATIBLE ITH 100% METHANOL? YES_ NO— <br /> D.EXTERIOR ❑ 1 POLYETHYLENE WRAP ❑ 2 COATING 71 3 VINYL WRAP 4 FIBERGLASS REINFORCED PLASTIC <br /> CORROSION <br /> PROTECTION ❑ 5 CATHODIC PROTECTION ❑ 91 NONE ❑95 UNKNOWN ❑ 99 OTHER <br /> E.SPILL AND OVERFILL etc. SPILL CONTAINMENT INSTALLED(YEAR) OVERFILL PREVENTION EQUIPMENT INSTALLED(YEAR) <br /> DROP TUBE YES NO STRIKER PLATE YES NO DISPENSER CONTAINMENT YES NO <br /> IV.PIPING INFORMATION CIRCLE A IF ABOVE OUND OR U IF UNDERGROUND,BOTH IF APPLICABLE <br /> A. SYSTEM TYPE A U 1 SUCTION A PRESSURE A U 3 GRAVITY A U 4 FLEXIBLE PIPING A U 99 OTHER <br /> B. CONSTRUCTION A U 1 SINGLE WALL A U DOUBLE WALL A U 3 LINED TRENCH A U 95 UNKNOWN A U 99 OTHER <br /> C. MATERIAL AND A U 1 BARE STEEL A U 2 TAINLESS STEEL A U 3 POLYVINYL CHLORIDE(PVC)A U 4 FIBERGLASS PIPE <br /> CORROSION A U 5 ALUMINUM A U 6 NCRETE A U 7 STEEL W/COATING A U 8 100% METHANOL COMPATIBLE W/FRP <br /> PROTECTION A U 9 GALVANIZED STEEL A U 10 C HODIC PROTECTION A U 95 UNKNOWN A U 99 OTHER <br /> D. LEAK DETECTION t MECHANICAL LINE LEAK 2 LINE TIGHTNESS 3 CONTINUOUS INTERSTITIAL 4 ELECTRONIC LINE 5 AUTOMATIC PUMP <br /> ❑ DETECTOR ❑ TESTING MONITORING ❑ LEAK DETECTOR ❑ SHUTDOWN ❑ 99 OTHER <br /> V.TANK LEAK DETECTION <br /> ❑ t VISUAL CHECK ❑ 2 MANUAL RECONCILIATION MONITORING <br /> ❑ w,MONIITORING VADOZE <br /> ❑ 4 AUTOMATGAUGING IC TANK E:] 5 GROUND MONITORING TER [:] 6 ANNUAL TESTING <br /> ❑ 7 CONTINUMONITOR U �W INTERSTITIAL ❑ 8 SIR ❑ 9NEK LY MANUAL [—]10 MONTESTHLY TANK ❑ 95 UNKNOWN F-199 OTHER <br /> YA VL TANK CLOSURE INFORMATION(PERMANENT CLOSURE IN-PLACE);`<; <br /> 1.ESTIMATED DATE LAST USED(MO/DAYNR) 2.ESTIMATED QUANTITY"Of 3.WAS TANK FILLED WITH <br /> SUBSTANCE REMAINING' GALLONS INERT MATERIAL? YES ❑ NO ❑ <br /> THIS FORM HAS BEEN COMPLETED UNDER PENALTY OF PERJURY,,AND TO THE BEST OF MY KNOWLEDGE, IS TRUE AND CORRECT <br /> TANK OWNER'S NAME DATE <br /> (PRINTED 6 SIGNATURE) <br /> LOCAL AGENCY USE ONLY THE STATE I.D.NUMBER IS COMPOSED OF THE FOUR NUMBERS BELOWI ah <br /> COUNTY# JURISDICTION# FACILITY# TANK# <br /> STATE I.D:# <br /> PERMIT NUMBER PERMIT APPROVED BY/DATE PERMIT EXPIRATION DATE <br /> THIS FORM MUST BE ACCOMPANIED BY A PERMIT APPLICATION-FORM A,UNLESS A CURRENT FORM A HAS BEEN FILED. FORM C MUST BE COMPLETED FOR INSTALLATIONS. THIS FORM <br /> SHOULD BE ACCOMPANIED BY A PLOT PLIILE THIS FORM WITH THE LOCAL AGENCY IMPLEMENTING THE OUND STORAGE TANK REGULATIONS <br /> FORM B (6-95) 3-a r q �� <br />