Laserfiche WebLink
UNIFIED PRMKAM CONSOLIDATED FORM <br /> UNDERGROUND STORAGE TANK <br /> MONITORING PLAN (Page 2 of 2) <br /> VI.UNDER DISPENSER CONTAINMENT(UDC)MONITORING <br /> 1. UDC MONITORING IS PERFORMED USING THE FOLLOWING METHOD - 44. *rob s4 <br /> ❑ L CONTINUOUS ELECTRONIC MONITORING ❑2.FLOAT AND CHAIN ASSEMBLY ❑ 3.ELECTRONIC STAND-ALONE <br /> �4,NO DISPENSERS ❑99.OTHER(Specify): <br /> PANEL MANUFACTURER: ——4""" MODEL : <br /> k _—___---------_—------------_-.------------_—__—_ a+ewmawewevs•w.w.e+veam_m..e®vo-.n.®..e..rrm..r...amn. as.=...nr <br /> LEAK SENSOR MANUFACTURER: 111 MODEL#(S)- 0-9088 <br /> DETECTION OF A LEAK INTO THE UDC TRIGGERS AUDIBLE AND VISUAL ALARMS ❑ a.YES ❑b.NO 490 9 <br /> UDC LEAK ALARM TRIGGERS AUTOMATIC PUMP SHUTDOWN ❑ a.YES ❑b.NO 4 <br /> FAILURE/DISCONNECTION OF UDC MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. ❑ a.YES ❑b.NO 4"41 <br /> UDC MONITORING STOPS THE FLOW OF PRODUCT AT THE DISPENSER. ❑ a.YES ❑b.NO 490.62 <br /> 2.UDC CONSTRUCTION IS OLSINGLE-WALLED ❑2.DOUBLE-WALLED <br /> IF DOUBLE WALLED: A4G69a <br /> UDC INTERSTITIAL SPACE 1S MONITORED BY: ❑ <br /> -- I.LI—Q_.UwID�. 2_.PR- ---------------_----.----------------------- <br /> e' <br /> A LEAK WITHIN THE SECONDARY CONTAINMENT OTERS AUDIBLE AND VISUAL ALARMS ❑a.YES ❑b.NO 490.64b f <br /> VII.PERIODIC SYSTEM TESTING <br /> I. ELD TESTING:THIS FACILITY HAS BEEN NOTIFIED BY THE STATE WATER RESOURCES CONTROL BOARD THAT ENHANCED 4906. <br /> LEAK DETECB.QN(EL.Q)MUST BE PERFORMED. PERIODIC ELD IS PERFORMED EVERY 36 MONTHS AS REQUIRED.(23 CCR§§'2644.1) __4 6 <br /> 2.SECONDARY CONTAINMENT COMPONENTS ARE TESTED EVERY 36 MONTHS <br /> 3 SPILL BUCKETS ARE TESTED ANNUALLY. 49067 <br /> VIII.RECORDKEEPING <br /> The following monitoring/maintenance records are kept for this facility: <br /> ®Alarm logs 490-6sa ❑Visual Inspection Records 49068b ®Tank integrity testing results 49o.6k <br /> ❑SIR testing results(and supporting documentation records). 490-68d ❑ Tank gauging results(and supporting documentation records). 4906se <br /> ®ATG Testing results(and supporting documentation records).490-68( ❑ Corrosion Protection 60-day logs 490688 <br /> ®Equipment maintenance and calibration records. 490m68h <br /> IX.TRAINING <br /> -®personnel with UST monitoring responsibilities are familiar with all of the following documents relevant to theirjob duties. 49"92 <br /> REFERENCE DOCUMENTS MAINTAINED AT FACILITY(Check all that apply) <br /> ® THIS UNDERGROUND STORAGE TANK MONITORING PLAN(Required)49069b <br /> ® OPERATING MANUALS FOR ELECTRONIC MONITORING EQUIPMENT(Required)490.69c <br /> ® CALIFORNIA UNDERGROUND STORAGE TANK REGULATIONS 490.69d <br /> ® CALIFORNIA UNDERGROUND STORAGE TANK LAW 49"9e <br /> ❑ STATE WATER RESOURCES CONTROL BOARD (SWRCB) PUBLICATION: -HANDBOOK FOR TANK OWNERS - MANUAL AND <br /> STATISTICAL INVENTORY RECONCILIATION"490-69f <br /> ❑ SWRCB PUBLICATION:"UNDERSTANDING AUTOMATIC TANK GAUGING SYSTEMS"490.698 <br /> ❑ OTHER(Specify):M69h.w9i <br /> This facility has a"Designated UST Operator'who has passed the California UST System Operator Exam administered by the International Code Council(ICC). <br /> The"Designated UST Operator'will train facility employees in the proper operation and maintenance of the UST systems annually,and within 30 days of hire.This <br /> training will include,but is not limited to,the following: <br /> A Operation of the UST systems in a manner consistent with the facility's best management practices <br /> The facility employee's role with regard to the monitoring equipment as specified in this UST Monitoring Plan <br /> A The facility employee's role with regard to spills and overfills as specified in the UST Response Plan <br /> Names of contact person(s)for emergencies and monitoring alarms.49o.70 <br /> X. COMMENTSIADDITIONAL INFORMATION <br /> ' Provide additional comments here or indicate how many pages with additional information on specific monitoring procedures are attached <br /> �to this plan.49o.71 <br /> UV tri :t1 0'�tc ;zPd\ 19 Ltkt' C4� ® * 1 s, 1 Ikl ^C� gq' V (0 <br /> XI.PERSONNEL RESPONSIBILITIES <br /> The UST Owner/Operator is responsible for ensuring that: 1)the daily/routine UST monitoring activities and maintenance of UST leak detection equipment covered by r <br /> this plan occurs,2)all conditions that indicate a possible release are investigated,and 3)all monitoring records are maintained properly. <br /> The following person(s)are responsible for performing the monitoring and equipment maintenance: <br /> NAME EPIC Compliance 490-72 TITLE Technician <br /> 490-73 <br /> NAME 49074 TITLE 49075 <br /> The Designated Operator shall perform a monthly visual inspection of the facility,provide a report to the owner/operator,and inform the owner/operator of any <br /> conditions that need follow-up action. _ <br /> XII.OWNERIOPERATOR SIGNATURE <br /> CERTIFICATION:1 certify that the information provided herein is true and accurate to the best of my knowledge. <br /> APPLICANT SIGNATURE 49076 DATE: 490M <br /> t ❑2 Fac'( v W_a3.Avlwad W easulagive of0w <br /> APPLICANT NAME(print): 490.78 APPLICANT TITLE: 49079 <br /> Todd Harris Regional Env.Manager <br /> s+nd-r I,sT F%,1,MAA,"T PA <br />