Laserfiche WebLink
ECE""VED} <br /> UNDERGROUND STORAGE TANK SEP 0 6 Z 01 s' <br /> RESPONSE _ A (One farm per facility) <br /> Is 1111m <br /> TYPE OF ACTION ❑ 1.NEW PLAN ® 2.CHANGE OF INFORMATION "-" a1 <br /> I. FACILITY INFORMATION <br /> :FACILITY 5# (Agency Use Only) <br /> BUSINESS NAME(Same as FACILITY NAME) <br /> MCI dba Verizon Business MID CITY,CA,F/®REGEN <br /> BUSINESS SITE ADDRESS - CITY <br /> 13850 Devries Rd Lodi <br /> II. SPILL CONTROL AND CLEANUP METHODS <br /> This plan addresses unauthorized releases from UST systems and supplements the emergency response plans and procedures in the facility's Hazardous Materials <br /> Business Plan. <br /> D If safe to do so,facility personnel will take immediate measures to control or stop any release(e.g.,activate pump shut-oft;etc.)and,if necessary,safely remove <br /> remaining hazardous material from the UST system. <br /> ➢ Any release to secondary containment will be pumped or otherwise removed within a time consistent with the ability of the secondary containment system to <br /> contain the hazardous material,but not greater than 30 calendar days,or sooner if required by the local agency. Recovered hazardous materials,unless still suitable <br /> for their intended use,will be managed as hazardous waste. <br /> B Absorbent material will be used to contain and clean up manageable spills of hazardous materials. Absorbent material may be reused until it becomes too saturated <br /> to be effective. It will then be managed properly.Used absorbent material,reusable or waste,will be stored in a properly labeled and seal container. <br /> A Facility personnel will determine whether or not any water removed from secondary containment systems,or from clean-up activity,has been in contact with any <br /> hazardous material. If the water is contaminated,it will be managed as hazardous waste. If the water has a petroleum sheen(i.e., rainbow colors), it is <br /> contaminated. A thick floating petroleum layer may not necessarily display rainbow colors. Water(hazardous or non-hazardous)from sumps,spill containers,etc. <br /> will not be disposed to storm water systems. <br /> A We will review secondary containment systems for possible deterioration if any of the following conditions occur. <br /> 1. Hazardous material in contact with secondary containment is not compatible with the material used for secondary containment, <br /> 2. Secondary containment is prone to damage from any equipment used to remove or clean up hazardous material collected in secondary containment; <br /> 3. Hazardous material,other than the product/waste stored in the primary containment system, is placed inside secondary containment to treat or neutralize <br /> released product(waste,and the added material or resulting material from such a combination is not compatible with secondary containment. <br /> III. SPILL CONTROL AND CLEAN-UP EQUIPMENT <br /> PERIODIC MAINTENANCE:Spill control and clean-up equipment kept permanently on-site is listed in the facility's Hazardous Materials Busines9 Plan. This <br /> equipment is inspected at least monthly,and after each use,and supplies are replenished as needed. Defective equipment is repaired or replaced as necessary. <br /> EQUIPMENT NOT PERMANENTLY ON-SrfE,BUT AVAILABLE FOR USE IF NEEDED: Com late onl if applic, ble <br /> EQUIPMENT LOCATION AVAILABILITY <br /> Absorbent Pa&Granules R10 Generator Area R20' At all times Ria <br /> R11. R21. Rat. <br /> R12 R22 R32. <br /> R13. R23. R33, <br /> RK RM. ' <br /> R1 S R3S' <br /> IV. RESPONSIBLE PERSONS <br /> THE FOLLOWING PERSON(S)WARE RESPONSIBLE FOR AUTHORIZING ANY WORT{NECESSARY UNDER THIS RESPONSE PLAN: <br /> NAME R40 I TITLE Rso, <br /> Zachary Fein old Environmental M r <br /> NAME 4 TITLE . <br /> NAME <br /> Todd Harris Environmental Manager Rae TITLE R52. <br /> Ecol2&Control Industries(SoCall Verizon Authorized Vendor <br /> R33 <br /> NAME <br /> x43 TITLE <br /> Clean Harbors orCal) Verizon Authorized Vendor <br /> V. MONITORING INDICATORS <br /> IF MONITORING INDICATES A POSSIBLE UNAUTHORIZED RELEASE,STEPS TO VERIFY THE RELEASE WILL BE MADE AS FOLLOWS'. <br /> ❑Additional system testing or data collection ®Inspection by qualified persons ❑Recalibration of equipment <br /> ❑Other: <br />