Laserfiche WebLink
owim. ,160706-364 <br /> Underground Storage Tank System Designated UST Operator Monthly Inspection Report-Page 2 of 2 <br /> N/A—NotA Ncabfe <br /> Item ENERGENCX GENERATOR UNBURIED FUEL PIPING VISUAL WSPECTION§25281.5 Yes No N/A <br /> 17. Unburied fuel pipjR&fittings,and containment are fine of waterleaks and hazardous substance. 61'18. Sensors are c able of detcetin a leak at the earliest ssible opportunity. <br /> of <br /> Comments: <br /> oa } <br /> �L H ALT H <br /> Required Follow-Up Actions: <br /> INSTRUCTIONS <br /> 1. The monthly UST system inspection must be conducted by a Designated UST Operator who possesses a current"California <br /> UST System Operator"exam issued by the International Code Council(ICC}. <br /> 2. The Designated UST Operator must alert the UST Owner or Operator of any condition discovered during the monthly visual <br /> inspection that may require follow-up actions. <br /> 3. A copy of this monthly inspection report must be provided to the UST Owner or Operator. <br /> 4. The UST Owner or Operator must maintain a copy of each monthly inspection report and all attachments for the most recent <br /> 12 months.The records shall be maintained on-site or,if approved by the local agency,off-site at a readily available location. <br /> REV:5V <br />