My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2008-2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
D
>
DE VRIES
>
13850
>
2300 - Underground Storage Tank Program
>
PR0231547
>
COMPLIANCE INFO_2008-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/8/2023 3:48:09 PM
Creation date
6/23/2020 6:49:56 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2008-2018
RECORD_ID
PR0231547
PE
2361
FACILITY_ID
FA0003848
FACILITY_NAME
Verizon Business: KINGCA
STREET_NUMBER
13850
Direction
N
STREET_NAME
DE VRIES
STREET_TYPE
RD
City
LODI
Zip
95240
APN
05524018
CURRENT_STATUS
01
SITE_LOCATION
13850 N DE VRIES RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231547_13850 N DE VRIES_2008-2018.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
582
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I REr*EIVED <br /> SWRCB,January 2002 SEP 2 6 2016 Page 3 of 7 <br /> 5.SECONDARY PIPE TESTINQ,4 AIQQ4,54EWIAILTH <br /> Test Method Developed By: ®Piping Manufacturer 0 Industry WaMaIrld DEPARMEN'Pal Engineer <br /> 130ther(.Specify=) <br /> Test Method Uses: ®Pressure [3Vacuurn ©Hydrostatic <br /> 13Other(Speci61) <br /> Test"Equi.ment Used:0 TO 15 PSI GLYCERIN FILLED PRESSURE GUAGE! E Ifliment Resolution:0.1 PSI <br /> i MEMENZESSIM <br /> PipingRun# SUPPLY Piping Run# RETURN Piping Run# VENT Piping Run <br /> Piping Material: <br /> tc t. <br /> g Material: PLASTIC PLASTIC PLASTIC <br /> P�. <br /> 1p ng M nuf <br /> 'turer. <br /> Piping Manufacturer: ENVIRON ENVIRON ENVIRON <br /> Piping Diameter,. 3/4" iff 1.5" <br /> Length of Piping Run: 15, 15, 15, <br /> Product Stored: DIESEL DIESEL DIESEL <br /> Method and location of <br /> 5/41IX3/411 TEST BOO 1 11'XI11TEST BOOT I.511X1.51'TEST BOOT <br /> piping-run isolation: <br /> Wait time between applying <br /> press ure/vacuurri/water and 30 MIN. 30 MIN. 30 MIN. <br /> starting test: <br /> Test Start Time: 1:00 PM 1:00 PM 1:00 PM <br /> Initial Reading(R.1): 5 PSI 5 PSI 5 PSI <br /> Test End Time: 2:00 PM 2:00 PM 2:00 PM <br /> Final Reading(14): 5 PSI 5 PSI 5 PSI <br /> Test Duration: I HOUR 1 HOUR 1 HOUR <br /> Change in Reading(RF-RI): 0 0 0 <br /> Pass/Fait Threshold or Criteria: 0 0 0 <br /> Comments-(include injiirnzation on repairs made prior to tenting,and reci)mniendctlji)lloii,-iil,7.1i)rjizilcd tests) <br /> Revision: <br />
The URL can be used to link to this page
Your browser does not support the video tag.