Laserfiche WebLink
1 0 <br /> SWRCB,January 2002 Page 6 of 7 <br /> 8.FILL RISER CONTAINMENT SUMP <br /> Facility is Not Equipped With Fill Riser Containment Sumps 13 <br /> Fill Riser Containment Sumps are Present,but were Not Tested 13 <br /> Test Method Developed By: ®Sump Manufacturer 0 Industry Standard ®Professional Engineer <br /> ®Ocher(Specifi) <br /> Test Method Uses: ®Pressure 13Vacuum N Hydrostatic <br /> [3 Other(Specify) <br /> Test Equipment Used: INCON TS-STS Equipment Resolution: 0.001" <br /> ESIMMMMMEME= <br /> Fill Sump# I Fill Sump# Fill Same# Fit!Sum p# <br /> Sump Diameter: 46" <br /> Sump Depth: 74" <br /> Height from Tank'rop to Top of 31 <br /> Highest Piping Penetration: <br /> Height from Tank Top to Lowest 2911 <br /> Electrical Penetration: <br /> Condition of sump prior to CLEAN llo- V D <br /> testing: <br /> Portion of Sump Tested 35" <br /> Sum e Material: FIBERGLASS 0 L V fJ V <br /> Wait time between applying <br /> presstireYvacuum/water and 30 MIN. TH <br /> starting test: ENVIF ON ENTAL-HO L <br /> Test Start Time: 1:06 pmll:26 j2m L)EPAFffMENT <br /> Initial Reading(R,): 5.1517"/5.1508" <br /> Test End Time: 1:21 pm/1:41 pin <br /> Final Reading(RF): 5.1510"/5.1505" <br /> Test Duration: 2x15 min. <br /> -Change in Readin2(R )1 -0.0003" <br /> Pass/Fail Threshold or Criteria: 0.002" <br /> & <br /> Is there a sensor in the sump? yes <br /> Does the sensor alarm when <br /> either product or water is yes <br /> detected? <br /> Was sensor removed for testing? yes <br /> Was sensor properly replaced and yes <br /> verified functional after testing? <br /> Comments- (include iqlbi-mation on repairs made prior to testing, and recommended follow-up.ft)i-failed tests) <br /> Revision: <br />