My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2008-2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
D
>
DE VRIES
>
13850
>
2300 - Underground Storage Tank Program
>
PR0231547
>
COMPLIANCE INFO_2008-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/8/2023 3:48:09 PM
Creation date
6/23/2020 6:49:56 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2008-2018
RECORD_ID
PR0231547
PE
2361
FACILITY_ID
FA0003848
FACILITY_NAME
Verizon Business: KINGCA
STREET_NUMBER
13850
Direction
N
STREET_NAME
DE VRIES
STREET_TYPE
RD
City
LODI
Zip
95240
APN
05524018
CURRENT_STATUS
01
SITE_LOCATION
13850 N DE VRIES RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231547_13850 N DE VRIES_2008-2018.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
582
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SEP 12 Z011-0 <br /> t� h <br /> F. In-Tank Gauging I SIR Equipment: 0 Check this box if tank gauging is used only for inventory 6ttrbA. m� � <br /> ❑ Check this box if no tank gauging or SIR equipment is installed. <br /> This section must be completed it in-tank gauging equipment is used to perform leak detection monitoring. <br /> Complete the following checklist: <br /> Yes ❑ No* Has all input wiring been inspected for proper entry and termination,including testing for ground faults? <br /> [ Yes ❑ No* Were all tank gauging probes visually inspected for damage and residue buildup? <br /> Q Yes ❑ No* Was accuracy of system product level readings tested? <br /> E Yes ❑ No` Was accuracy of system water level readings tested? <br /> 0 Yes ❑ No* Were all probes reinstalled properly? <br /> [j Yes ❑ No* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> *In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> G. Line Leak Detectors(LLD): E) Check this box if LLDs are not installed. <br /> Complete the following checklist: <br /> ® Yes No* For equipment start-up or annual equipment certification,was a leak simulated to verify LLD performance? (Check ail <br /> N/A that apply) Simulated leak rate:03 g.p.h.;®0.1 g.p.h ;00.2 g.p.h. <br /> Yes No* Were all LLDs confirmed operational and accurate within regulatory requirements? <br /> ❑ Yes No* Was the testing apparatus properly calibrated? <br /> YesENo* <br /> For mechanical LLDs,does the LLD restrict product flow if it detects a leak? <br /> ® Yes For electronic LLDs,does the turbine automatically shut off if the LLD detects a leak? <br /> El Yes ® No* For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system is disabled or <br /> N/A disconnected? <br /> E] Yes ® No* For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system malfunctions or <br /> N/A fails a test? <br /> Yes No For electronic LLDs,have all accessible wiring connections been visually inspected? <br /> N/A <br /> E] Yes JEJ No* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> .in the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> H. Comments: <br /> Monitoring System Certification Page 3 of 4 12107 <br /> 3 2/21/07 <br />
The URL can be used to link to this page
Your browser does not support the video tag.