My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2008-2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
D
>
DE VRIES
>
13850
>
2300 - Underground Storage Tank Program
>
PR0231547
>
COMPLIANCE INFO_2008-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/8/2023 3:48:09 PM
Creation date
6/23/2020 6:49:56 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2008-2018
RECORD_ID
PR0231547
PE
2361
FACILITY_ID
FA0003848
FACILITY_NAME
Verizon Business: KINGCA
STREET_NUMBER
13850
Direction
N
STREET_NAME
DE VRIES
STREET_TYPE
RD
City
LODI
Zip
95240
APN
05524018
CURRENT_STATUS
01
SITE_LOCATION
13850 N DE VRIES RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231547_13850 N DE VRIES_2008-2018.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
582
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Monitoring System Certification 0 10 RECEIVED <br />UST Monitming Plan SEP 2 1 2015 <br />SiteAddress: 1-3SSo IDe \(v-jeS p ENVIRONMENTAL <br />- - 1_- - % <br />4 L -6D <br />Piping sump sensor- LS -M <br />0 spill bucket <br />in -tank probe- mp-450 <br />annular sensor -L3.610 <br />vent box sensor- LS -600 <br />transition box sensor -LS -W <br />audible alarm <br />CoIftj P.�rei <br />Date map was drawn: <br />Instructions <br />rw <br />A <br />If you already have a diagram that shows all required information, you may include it, rather than this page, <br />with your Monitoring System Certification. On your plan, show the general layout of the tanks and piping. <br />Clearly identify locations of the following equipment, if installed: monitoring system control panel; sensor <br />monitoring tank annular spaces, sumps, dispenser pans, spill containers, or other secondary containment areas; <br />mechanical or electronic line leak detectors; and in -tank liquid level probes (if used for leak detection). In the <br />space provided, note the date this plan was prepared. <br />I I. <br />Wednesday, September 16, 2015 brittanyl <br />
The URL can be used to link to this page
Your browser does not support the video tag.