My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2008-2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
D
>
DE VRIES
>
13850
>
2300 - Underground Storage Tank Program
>
PR0231547
>
COMPLIANCE INFO_2008-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/8/2023 3:48:09 PM
Creation date
6/23/2020 6:49:56 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2008-2018
RECORD_ID
PR0231547
PE
2361
FACILITY_ID
FA0003848
FACILITY_NAME
Verizon Business: KINGCA
STREET_NUMBER
13850
Direction
N
STREET_NAME
DE VRIES
STREET_TYPE
RD
City
LODI
Zip
95240
APN
05524018
CURRENT_STATUS
01
SITE_LOCATION
13850 N DE VRIES RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231547_13850 N DE VRIES_2008-2018.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
582
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />SWRCB, January 2002 Page 3 of 7 <br />5. SECONDARY PIPE TESTING <br />Test Method Developed By: <br />OPiping Manufacturer <br />13 Other (Sped) <br />® Industry Standard [3 Professional Engineer <br />Test Method Uses: <br />® Pressure <br />Q Other (Specify) <br />Q Vacuum <br />0 Hydrostatic <br />Teat ui ment Used: Glycerin filled Pressure 1gauge 0-15 PSI <br />Piping Run # Supply Piping <br />Run # Return <br />Equi cert Resolution: 0.1 <br />Piping Run * Vent Piping Run M <br />Piping Material: <br />Plastic <br />Plastic <br />Plastic <br />Piping Manufacturer: <br />Environ <br />Environ <br />Environ <br />Piping Diameter: <br />3/4" <br />1" <br />1.5" <br />Length of Piping Run: <br />15' <br />15' <br />15' <br />Product Stored: <br />Diesel <br />Diesel <br />Diesel <br />Method and location of <br />piping -run isolation: <br />314 X 3/4 test boot 1 " <br />X i test boot <br />„ „ <br />1.5 X 1.5 Test boot <br />Wait time between applying <br />pressure/vacuum/water and <br />starting test: <br />30 min <br />30 min <br />30 min <br />Test Start Time: <br />9:30 AM <br />9:30 AM <br />9:30 AM <br />Initial Reading (RI): <br />5 PSI <br />5 PSI <br />5 PSI <br />Test End Time: <br />10:30 AM <br />10:30 AM <br />10:30 AM <br />Final Reading (RF): <br />5 PSI <br />5 PSI <br />5 PSI <br />Test Duration: <br />1 Hour <br />1 Hour <br />1 Hour <br />Change in Reading (RF-Rl): <br />0 <br />0 <br />0 <br />Pass/Fail Threshold or Criteria: <br />0.0 <br />0.0 <br />0.0 <br />Comments - (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />Revision: <br />
The URL can be used to link to this page
Your browser does not support the video tag.