My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2008-2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
D
>
DE VRIES
>
13850
>
2300 - Underground Storage Tank Program
>
PR0231547
>
COMPLIANCE INFO_2008-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/8/2023 3:48:09 PM
Creation date
6/23/2020 6:49:56 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2008-2018
RECORD_ID
PR0231547
PE
2361
FACILITY_ID
FA0003848
FACILITY_NAME
Verizon Business: KINGCA
STREET_NUMBER
13850
Direction
N
STREET_NAME
DE VRIES
STREET_TYPE
RD
City
LODI
Zip
95240
APN
05524018
CURRENT_STATUS
01
SITE_LOCATION
13850 N DE VRIES RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231547_13850 N DE VRIES_2008-2018.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
582
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
NIFIED PROGRAM CONSOLIDATED FORUM <br /> UNDERGROUND STORAGE TANK <br /> MONITORING PLAN-(Page I of 2) H E L IS y E <br /> TYPE OF ACTION ❑ 1.NEW PLAN 2.CHANGE OF INFORMATION AIJ[] 3 0 4d id 490-1 <br /> PLAN TYPE 1.MONITORING IS IDENTICAL FOR ALL USTs AT THIS FACILITY. 490-2 <br /> (Check one item only) El 2.THIS PLAN COVERS ONLY THE FOLLOWING UST SYSTEM(S)- ENVIRUNMENTHEALTH <br /> I. FACILITY INFORMATION PERM117SERVIUL5- - <br /> FACILITY ID#(Agency Use Only) I <br /> BUSINESS NAME(Same as FACILITY NAME)MCI, dba, Verizon Business 3. <br /> BUSINESS SITE ADDRESS 13850 N.DeVries Road 103. CITY Lodi 104. <br /> H.EQUIPMENT TESTING AND PREVENTIVE MAINTENANCE <br /> Testing,preventive maintenance,and calibration of monitoring equipment(e.g.,sensors,probes,line leak detectors,etc.)must be performed at the frequency <br /> specified by the equipment manufacturers'instructions,or annually,whichever is more frequent,and that such work must be performed by qualified personnel. <br /> (23 CCR§2632,2634,2638,2641) ----------------------------------------------------------------------------------------------------------------------------------------------------------------------- <br /> 490-3a <br /> MONITORING EQUIPMENT IS SERVICED 1.ANNUALLY El 99.OTHER(Specif�): 490-3b <br /> III.MONITORING LOCATIONS <br /> M 1.NEW SITE PLOT PLAN/MAP SUBMITTED WITH THIS PLAN. El 2.SITE PLOT PLAN/MAP PREVIOUSLY SUBMITTED. (23 CCR§2632, <br /> 2634)490-4 <br /> IV.TANK MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S): <br /> 1.CONTINUOUS ELECTRONIC TANK MONITORING OF ANNULAR(INTERSTITIAL)SPACE(S)OR SECONDARY CONTAINMENT--- 490-5 <br /> VAULT(S)WITH AUDIBLE AND VISUAL ALARMS. (23 CCR§2632,2634) <br /> SECONDARY CONTAINMENT IS: a.DRY El b.LIQUID FILLED 0 c.PRESSURIZED [:]d.UNDER VACUUM 490-6 <br /> ------------------------------------------------ <br /> 490-7. 1 490-8 <br /> PANEL MANUFACTURER: Pneurnercator i MODEL#: TMS2000 <br /> 490-9. 1 <br /> LEAK SENSOR MANUFACTURER: Pneumercator I MODEL#(s): LS7A <br /> 490.10 <br /> El 2.AUTOMATIC TANK GAUGING(ATG)SYSTEM USED TO MONITOR SINGLE WALL TANK(S).(23 CCR§2643) 490-11 <br /> PANEL MANUFACTURER: 490-12. MODEL#: 490-13 <br /> -------------------------------------------------------------------------------------------------------------------------------------------I ---------------------------------------------------------------- <br /> IN-TANK PROBE MANUFACTURER: 490-14. MODEL#(S): 490-15 <br /> ----------------- ----------------------------------------------------------------- -------------------------- --------- <br /> LEAK TEST FREQUENCY: ❑ a.CONTINUOUS [3 b.DAILY/NIGHTLY ❑ c.WEEKLY 490.16 <br /> ❑ d.MONTHLY El e.OTHER(Specify): 490.17 <br /> 490-18 <br /> PROGRAMMED TESTS: 0 a.0.1 g.p.h. ❑El b.0.2 g.p.h. ❑0 c.OTHER(Specify): 490-19 <br /> ❑ 3.MONTHLY STATISTICAL INVENTORY RECONCILIATION(23 CCR§2646.1): 490-20 <br /> ❑ 4.WEEKLY MANUAL TANK GAUGING(MTG)(23 CCR§2645). TESTING PERIOD: [:1 a.36 HOURS 490-21 b.60 HOURS 490.22 <br /> 5.TANK INTEGRITY TESTING(23 CCR§2643.1): 490-23 <br /> 490-24 <br /> TEST FREQUENCY: ❑[I a.ANNUALLY ❑El b.BIENNIALLY ❑El c.OTHER(Specif�): 490-25 <br /> El 99.OTHER (Specify): 490-26490-27 <br /> V.PIPE MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S)(Check an that apply) <br /> ED 1.CONTINUOUS MONITORING OF PIPE/PIPING SUMP(S)AND OTHER SECONDARY CONTAINMENT WITH AUDIBLE AND 490-28 <br /> VISUAL ALARMS. (23 CCR§2636) <br /> ---------- <br /> SECONDARY-CONTAINMENT-IS:Za.DRY Elb.LIQUID FILLED E]c.PRESSURIZED Eld.UNDER VACUUM-------------------------------------- 490-29 <br /> 490-30 1 490-31 <br /> PANEL MANUFACTURER: Pneumercator i MODEL#: TMS2000 <br /> ------------------------------------------ --------------------------------------------- -------------------- <br /> 490-32 490-33 <br /> ---------LEAK SENSOR-MANUFACTURER:--Pneumercator--------------------------------------------------- 1 MODEL#(s): LS600 ----------------- <br /> PIPING LEAK ALARM TRIGGERS AUTOMATIC PUMP(i.e.,TURBINE)SHUTDOWN. 11 a.YES ❑b.NO 490.34 <br /> FAILURE/DISCONNECTION OF THE MONITORING SYSTEM TRIGGERS AUTOMATIC PUMP SHUTDOWN. El a.YES ❑b.NO 490-35 <br /> 2.MECHANICAL LINE LEAK DETECTOR(MLLD)THAT ROUTINELY PERFORMS 3.0 g.p.h.LEAK TESTS AND RESTRICTS OR SHUTS OFF <br /> ---------- PRODUCT FLOW WHEN A LEAK IS DETECTED-(23-CC-R-§2636)----------------------------------------------------------------------------------------------------------- 490-36 <br /> MLLD MANUFACTURER(S): 490-37 MODEL#(S): 490-38 <br /> ❑ 3.ELECTRONIC LINE LEAK DETECTOR(ELLD)THAT ROUTINELY PERFORMS 3.0 g.p.h.LEAK TESTS (23 CCR§2636) 490-39 <br /> ------------------------------------------------- ------------------------------------------------ ---------------------- <br /> 490-40. 1 490-41 <br /> -----------ELLD-MANUFACTURER(S) --------------------------------------------------------------------------------- 1 MODEL#(S): -----------------------------------------------T4iTiF- <br /> PROGRAMMED IN LINE LEAK TEST: El 1.MINIMUM MONTHLY 0.2 g.p.h. ❑ 2.MINIMUM ANNUAL 0.1 g.p.h. <br /> ELLD DETECTION OF A PIPING LEAK TRIGGERS AUTOMATIC PUMP SHUTDOWN. El a.YES El b.NO 490-43 <br /> ELLD FAILURE/DISCONNECTION TRIGGERS AUTOMATIC PUMP SHUTDOWN. E]a.YES El b.NO 490-44 <br /> 4.PIPE INTEGRITY TESTING 490-45 <br /> TEST FREQUENCY 0 a.ANNUALLY [:1 b.EVERY 3 YEARS E] c.OTHER(Specify) 490-46 490.47 <br /> ❑ 5.VISUAL PIPE MONITORING. 490-48 <br /> FREQUENCY El a.DAILY [] b.WEEKLY M c.MIN.MONTHLY&EACH TIME SYSTEM OPERATED* 490-49 <br /> *Allowed for monitoring of unbutied emergency generator fuel piping only per HSC§25281.5(b)(3) <br /> ❑ 6.SUCTION PIPING MEETS EXEMPTION CRITERIA[23 CCR§2636(a)(3)]. 490-50 <br /> El 7.NO REGULATED PIPING PER HEALTH AND SAFETY CODE,DIVISION 20,CHAPTER 6.7 IS CONNECTED TO THE TANK SYSTEM <br /> 490-51 <br /> 490-52 <br /> El 99.OTHER(Specify) 490-53 <br /> -nl.TCT-II 11q A11 I/A <br />
The URL can be used to link to this page
Your browser does not support the video tag.