My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2008-2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
D
>
DE VRIES
>
13850
>
2300 - Underground Storage Tank Program
>
PR0231547
>
COMPLIANCE INFO_2008-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/8/2023 3:48:09 PM
Creation date
6/23/2020 6:49:56 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2008-2018
RECORD_ID
PR0231547
PE
2361
FACILITY_ID
FA0003848
FACILITY_NAME
Verizon Business: KINGCA
STREET_NUMBER
13850
Direction
N
STREET_NAME
DE VRIES
STREET_TYPE
RD
City
LODI
Zip
95240
APN
05524018
CURRENT_STATUS
01
SITE_LOCATION
13850 N DE VRIES RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231547_13850 N DE VRIES_2008-2018.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
582
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
�'•\' � i.1 �t 1 �. r' t.� 4- ��"�'�a �/ 1 I(•.'�r;;+`;.Ilf.'' _' -.a..-./_ � ,l .'r , a �,,, <br />UST SYSTEM RETROFIT OR REPAIR <br />(Submit minimum of 3 sets of plans & applications as originals will be retained by END) <br />4. Site map enclosed? YES () lK( I <br />2. Submit copies of ICC Service Technician and/or installer's certificate and all manufacturer training certificates for <br />each person installing or testing any component that is repaired or replaced. Ensure a copy of the "Site Health <br />and Safety Plan" is available on the jobsite as required by Title $. <br />3. Detailed description of work to be completed. List components to be repaired or replaced and attach a diagram <br />drawn to scale showing location of repairs and/or replacements. If repairing a component. describe, how this will <br />be done. (If adding piping, UDC's, or other UST equipmenl, or performing tank top upgrade. use the UST <br />Installation Application rmeIs!s 4 A r13 (leceszlZIry tnf. a t1rriely plan review): <br />Plan A. <br />1. The tech to determine which line is leaking, supply or return - most likely it's <br />the supply line. <br />2. Take apart the hard piping in the transition sump, clean and re -install wii•tl <br />Loc-Tite piping sealant. <br />3, Pressure test the line - schedule in advance so the COPA can inspect sarne <br />around 1 - 2 pm on the same day. <br />4. Return to service - all work done in one day. <br />Plan e - if its determined that the leak is in the flex piping. (This will be done on a <br />`second day' after failure of Plan A. <br />1. Remove the flex piping and replace with Western Fiberglass coflex, replace <br />both supply and return, <br />2. Set up for this work to be completed in one day, with the CUPA inspection <br />around 1 - 2 pm nn the same day. <br />3. Return to service .. all work done in one day. <br />4. List of equipment to be used (Attach manufacturer's specification sheets showing third -party approval)., <br />�. •� . f ... I ''� r ®��,' t + Pyr'„ file' f-- <br />3 <br />10 39Vd N01X3S <br />T55656L60Z 5T:9T OTOZ/sO/OT <br />
The URL can be used to link to this page
Your browser does not support the video tag.