Laserfiche WebLink
Page 3 of 8 405 <br />5. SECONDARY PIPE TESTING <br />Comments — (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />Piping Run #1 <br />Piping Run #2 <br />Piping Run #3 <br />Piping Run # <br />Piping Material: <br />Flex <br />Flex <br />Flex <br />Piping Manufacturer: <br />Flex <br />Flex <br />Flex <br />Piping Diameter: <br />3/4" <br />1" <br />11/211 <br />Length of Piping Run: <br />10, <br />10, <br />S' <br />Product Stored: <br />Diesel <br />Diesel <br />Diesel <br />Method and location of piping- <br />run isolation: <br />Test boot <br />Test boot <br />Test boot <br />Wait time between applying <br />pressure/vacuum/water and <br />starting test: <br />5 min <br />5 min <br />5 m i n <br />Test Start Time: <br />15:00 <br />15:00 <br />15:00 <br />Initial Reading (Ri): <br />5 psi <br />5 psi <br />5 psi <br />Test End Time: <br />16:00 <br />16:00 <br />16:00 <br />Final Reading (RF): <br />5 psi <br />5 psi <br />5 psi <br />Test Duration: <br />1 hour <br />1 hour <br />1 hour <br />Change in Reading (RF-Ri): <br />0 <br />0 <br />0 <br />Pass/Fail Threshold or Criteria: <br />0 <br />0 <br />0 <br />Test Result: <br />® Pass ❑ Fail <br />® Pass ❑ Fail <br />Q Pass ❑ Fail <br />❑ Pass ❑ Fail <br />Comments — (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />