My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2008-2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
D
>
DE VRIES
>
13850
>
2300 - Underground Storage Tank Program
>
PR0231547
>
COMPLIANCE INFO_2008-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/8/2023 3:48:09 PM
Creation date
6/23/2020 6:49:56 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2008-2018
RECORD_ID
PR0231547
PE
2361
FACILITY_ID
FA0003848
FACILITY_NAME
Verizon Business: KINGCA
STREET_NUMBER
13850
Direction
N
STREET_NAME
DE VRIES
STREET_TYPE
RD
City
LODI
Zip
95240
APN
05524018
CURRENT_STATUS
01
SITE_LOCATION
13850 N DE VRIES RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231547_13850 N DE VRIES_2008-2018.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
582
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 <br />C O N T R A C T O R S <br />ALC <br />PETROLECM <br />& BUILDERS, INC. <br />C.L. #386575 A/B1C - 10 HAZ <br />Balch Petroleum Contractors and Builders, Inc. <br />930 Ames Avenue <br />Milpitas, CA 95035 <br />Verizon Business <br />13850 N. Devries. Rd. <br />Lodi, CA. 95242 <br />• <br />SITE HEALTH & SAFETY PLAN <br />Project Manager: Bill Balch <br />Site Safety Officer: Designated daily <br />Workmen's Compensation: State Compensation Insurance Fund #461154604 <br />A.) Outline of Daily Safety Briefings <br />• Hardhats will be worn while working around heavy equipment (safety glasses, <br />ear plugs, boots, etc.) will be worn on the job site. <br />• No open flames, cigarettes, etc. will be allowed in the work area. <br />• The bungs on the tanks will be kept closed when removing the tank from the <br />excavation. <br />B.) Tank Excavation Procedures (If applicable): <br />• Before any excavation work begins, ALL required permits shall be obtained. <br />The estimated location of utility installations such as sewer, telephone, fuel, <br />electric, water lines, or any other underground installations that may <br />reasonably be expected to be encountered during excavation will be outlined. <br />U.S.A. Dig will be called 48 hours prior to excavation. <br />• Excavation for the removal of underground tanks must be approached with <br />extreme care to prevent undermining the foundations of existing structures. A <br />minimum distance of five feet to the base of the adjacent structures of <br />property lines is recommended. The total depth of the tank excavation is <br />determined by the tank diameter, bedding thickness, holddown pad if <br />required, depth of cover, and slope of piping. <br />• The slope of the walls of the excavation is determined by soil conditions and <br />depth of excavation. <br />• Handling excavated materials which cannot be immediately removed from the <br />site should be safely stockpiled away from the edge of the excavation keeping <br />work areas clear of stockpiled material. Employees shall be protected from <br />the excavation or other materials or equipment that could pose a hazard by <br />falling or rolling into an excavation. Protection shall be provided by placing <br />and keeping such materials or equipment at least 2 feet from the edge of the <br />excavation or by use of retaining devices that are sufficient to prevent <br />materials or equipment from falling in. <br />
The URL can be used to link to this page
Your browser does not support the video tag.