Laserfiche WebLink
0 Monitoring System Certification <br />F. In -Tank Gauging/ SIR Equipment ❑Check this box if tank gauging is used only for inventory control. <br />[--]Check this box if no tank gauging or SIR equipment is installed. <br />This section must be completed if in -tank gauging equipment is used to perform leak detection monitoring. <br />Ccmnlate the foll®wlno checklist - <br />Yes <br />No* <br />Has all input %virim been inspected for E2M entry and termination, including testi2j for ground faults? <br />J YesQ <br />No* <br />Were all tank gaugi2g probes visually inspected for damage and residue buildup? <br />Yes <br />No* <br />Was accur of system product level readings tested? <br />jil Yes <br />No* <br />Was accuracy of a---- water level readings tested? <br />Yes <br />No* <br />Were all probes reinstalled r erl . <br />Yes <br />No* <br />Were all items on the equipment manufacturer's maintenance checklist completed? <br />*In Section H, below, describe how and when these doficioncies were or will be corrooted. <br />G. Line Leak Detectors (LLD): QCheck this box if LLDs are not Installed. <br />Cornoletathe fellewlno checklist: <br />Yes <br />No* <br />For equipment start-up or annual equipment certification, was a leak simulated to verity LLD performance? (Check a#fhat <br />N/A <br />a Simulated leak rate: ❑39.p.h. ❑o.l .h. 00.2 .h. <br />Yes <br />No* <br />Were all LLDs confirmed operational and accurate within regulatory requirements? <br />Yes <br />No* <br />Was the testing atus properly calibrated <br />❑ Yes <br />No* <br />For mechanical LLDs does the LLD restrict product flow if it detects a leak? <br />N/A <br />Yes <br />No* <br />For electronic LLDs, does the turbine automatically shut off if the LLD detects a leak? <br />❑ N/A <br />Yes <br />No* <br />For electronic LLDs, does the turbine aulometically shut off if any portion of the monitoring system is dl,abfad or <br />❑ N/A <br />disconnected? <br />Yes <br />No* <br />Far electrons. LLD,, does the turbine automatically shut off if any portion of the monitoring system malfunctions or fails a <br />❑ N/A <br />test? <br />Yes <br />11 No* <br />For electronis LLDs, have all accesabiele wiring connections been visually inspected? <br />❑ N/A <br />❑ Yes <br />[01No* <br />Were all items on the equipment manufacturer's maintenance checklist completed? <br />-Irl ileo%Ion n, Delow, oescrine now alno when inese oencienclea were or will De correcleu. <br />H. Comments: <br />Page 3 of 4 <br />