My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2008-2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
D
>
DE VRIES
>
13850
>
2300 - Underground Storage Tank Program
>
PR0231547
>
COMPLIANCE INFO_2008-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/8/2023 3:48:09 PM
Creation date
6/23/2020 6:49:56 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2008-2018
RECORD_ID
PR0231547
PE
2361
FACILITY_ID
FA0003848
FACILITY_NAME
Verizon Business: KINGCA
STREET_NUMBER
13850
Direction
N
STREET_NAME
DE VRIES
STREET_TYPE
RD
City
LODI
Zip
95240
APN
05524018
CURRENT_STATUS
01
SITE_LOCATION
13850 N DE VRIES RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231547_13850 N DE VRIES_2008-2018.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
582
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 Monitoring System Certification <br />F. In -Tank Gauging/ SIR Equipment ❑Check this box if tank gauging is used only for inventory control. <br />[--]Check this box if no tank gauging or SIR equipment is installed. <br />This section must be completed if in -tank gauging equipment is used to perform leak detection monitoring. <br />Ccmnlate the foll®wlno checklist - <br />Yes <br />No* <br />Has all input %virim been inspected for E2M entry and termination, including testi2j for ground faults? <br />J YesQ <br />No* <br />Were all tank gaugi2g probes visually inspected for damage and residue buildup? <br />Yes <br />No* <br />Was accur of system product level readings tested? <br />jil Yes <br />No* <br />Was accuracy of a---- water level readings tested? <br />Yes <br />No* <br />Were all probes reinstalled r erl . <br />Yes <br />No* <br />Were all items on the equipment manufacturer's maintenance checklist completed? <br />*In Section H, below, describe how and when these doficioncies were or will be corrooted. <br />G. Line Leak Detectors (LLD): QCheck this box if LLDs are not Installed. <br />Cornoletathe fellewlno checklist: <br />Yes <br />No* <br />For equipment start-up or annual equipment certification, was a leak simulated to verity LLD performance? (Check a#fhat <br />N/A <br />a Simulated leak rate: ❑39.p.h. ❑o.l .h. 00.2 .h. <br />Yes <br />No* <br />Were all LLDs confirmed operational and accurate within regulatory requirements? <br />Yes <br />No* <br />Was the testing atus properly calibrated <br />❑ Yes <br />No* <br />For mechanical LLDs does the LLD restrict product flow if it detects a leak? <br />N/A <br />Yes <br />No* <br />For electronic LLDs, does the turbine automatically shut off if the LLD detects a leak? <br />❑ N/A <br />Yes <br />No* <br />For electronic LLDs, does the turbine aulometically shut off if any portion of the monitoring system is dl,abfad or <br />❑ N/A <br />disconnected? <br />Yes <br />No* <br />Far electrons. LLD,, does the turbine automatically shut off if any portion of the monitoring system malfunctions or fails a <br />❑ N/A <br />test? <br />Yes <br />11 No* <br />For electronis LLDs, have all accesabiele wiring connections been visually inspected? <br />❑ N/A <br />❑ Yes <br />[01No* <br />Were all items on the equipment manufacturer's maintenance checklist completed? <br />-Irl ileo%Ion n, Delow, oescrine now alno when inese oencienclea were or will De correcleu. <br />H. Comments: <br />Page 3 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.